z-

1010

KG - 01A

DP A SsoCIA7.6

Method Statement For Driven Pile UsiRg-Preboring

ebore every pile to 9m depth -and drive-the-pile until set.

at the site. the pile will be surveyed and marked on site by a steel pin. Two (2) reference steel

nce from the steel casing to the reference pins will be measured and adjustments made t

KG - NA
3. POSITJON OF BORING PLANT

3.1
3.2

Th6.,boring plant will be moved to the pile points intended for excavation.
The
11

ly bar mounted with an auger is placed just above the pile point. The

verticality, of the Kelly-'bar should be checked by means of a spirit level. 3.3 Necessary justrn/ent shall be made so as to enable the Kelly bar to be as vertical as possible. Then the position of the auger is checked against the pile point. The auger is then lowered and boring operation commences. e onable care should be taken so that the pile position and verticality are -constructed within the specified tolerance. 4.
4.1

BORING PROCESS
Visbally, an auger of the required type and size is used to excavate the hole, 7I

oil periodically by raising the Kelly bar and spin-off.

d powerful in removing cohesive soil in dry hole. Once the ground',waters seep into the borehole: the short a soil-boring budket.

uld be checked for its stability. If the excavated hol "' is collapsible, temporary casing of the same siz the required depth or when hit rock.

NT

over the prebareO_bDl point. Check the verticality of the frame by vertical spirit level.

ent including hydraulic power pack, hydraulic hoses. cooling system and control panel. e and shift near to the piling frame.

ng frame and hook on to the pile for positioning it to the intended pile point. Check the pile verticality be

wer pack, hydraulic hoses. cooling system and control panel.

e piling frame.

e a nd h oo k o n t o t he p i l e f o r positionin?~rl'he intended pile point. Check the pile vertic

e the pile head is not damaged and the hammer is centered on the head of the pile. be checked before driving proceeds.

sly being recorded at regular interval i.e. every 0.3m. --' The piling frame is shifted to ne equipment havelto be shifted to new pile cap location and the process

repeated as ite

Pile integrity can be check by carry out the pile integrity test or pile dynamic analysis tes

KG - 01A

piling work starts.

ation before test commences.

ery wet and the use of rubber boots is essential; these shall be reinforced by steel not only in the toes

ment rods, timber with protruding nails, etc.

f obstructions, mud and spoil.

KG-01A
9. FLOW CHART FOR DRIVEN PILE USING-PREBOR4NG

SETTING OUT OF THE PILE POINTS

PREPARATION OF EXISTING GROUND

POSITION OF BORING PLANT

BORING

SETTING OUT OF PILING FRAME

DRIVING OF PILE

TAKEN SET

SHIFTING TO NEW PILE POSITION