GUIDELINES FOR JOINT METER READINGS The following guide lines shall be followed while taking Joint Meter

Readings of the Private Power Generators. 1) Readings of all the display parameters of both main & check meter s are to be taken and are to be recorded in Annexure-I. 2) Readings of MD (A) & CMD (B) in both export & Import modes, and also the Reset count (C) are to be recorded (from Annexure-I) in Annexure-II A. 3) MD is to be reset manually. 4) Thereafter, readings of MD (D), CMD (E) and Reset count (F) are to be taken and recorded in Annexure-II A. 5) CMD (G) and Reset Count (H) of the previous month JMR are also to be recorded in Annexure-II A. 6) Difference (I) between Cumulative MD (after reset) in the present JMR (E) and Cumulative MD (after reset) in the previous JMR (G) is to be calculated. 7) If the difference (I) is equal to (A), then it shall be taken as MD to be billed for the current month. In this case the difference of reset count (F) - (H) will generally be equal to one (1). If it is not equal to one (1), analyse & give the reasons at the end of Annexure-II A. 8) If the difference (I) is not equal to (A), then Annexure II B is to be filled for arriving at the correct MD to be billed for current month. In this case the difference of reset count (F) - (H) will not generally be equal to one (1). (It may be due to MD auto reset feature/periodical testing of the meter etc.) 9) The abstract of billing parameters is to be given in Annexure-III. 10) For the captive power plants, the readings of the in-house consumption meter are also to be taken and recorded in Annexure-IV. 11) Whenever difference between the readings of the Main meter and the Check meter for any month is more than 0.5%, the following steps shall be taken: (i) Checking of CT and VT connections; (ii) Testing of accuracy of interface meter at site with reference standard meter of accuracy class higher than the meter under test. If the difference exists even after such checking or testing, then the defective meter shall be replaced with a correct meter. 12) In case of conspicuous failures like burning of meter and erratic display of metered parameters and when the error found in testing of meter is beyond the permissible limit of error provided in the relevant standard, the meter shall be immediately replaced with a correct meter. 13) In case where both the Main meter and Check meter fail, at least one of the meters shall be immediately replaced by a correct meter. 14) Any discrepancies found are to be given as note in the JMR.

(P.T.O)

Illustrative Example
Import MD CMD before RESET RESET COUNT (A) (B) (C) Reset MD manually MD CMD After RESET RESET COUNT (D) (E) (F) Counter Check Difference in CMD Difference Count in Reset (G)= (E)(B) (H)= (F)-(C) 2.26 1 0.31 0.00 252.41 9 0.00 50.56 2.26 250.15 8 Export 0.31 50.25

ANNEXURE-I READINGS OF MAIN & CHECK METERS FOR THE BILLING MONTH OF (Month) 2011

Name & Location of the Plant: Location of Metering: Fuel: Date of Reading: PPA / PWPA / PPWA / OA : Time of Reading:

Details of Metering CTs & PTs CTs Class Burden Available CT Ratio PT Ratio Adopted PTs

Details of Billing Energy Meters Main Meter Make Sl.No./ Year Type Meter CT Ratio Meter PT Ratio MF for KWH Check Meter

Readings of Main & Check meters Sl. No. Display ID Parameter Main Meter Reading Check Meter Reading

DE/TL&SS

DE/Operation

Company Rep.

ANNEXURE-II A

COMPARITIVE STATEMENT FOR THE BILLING MONTH OF (Month) 2011

Name & Location of the Plant: Location of Metering: Fuel: Date of Reading:
Main Meter (Sl. No. Parameters Import to APTRANSCO

PPA / PWPA / PPWA / OA : Time of Reading:


) Check Meter (Sl. No. Import to APTRANSCO )

Export from APTRANSCO

Export from APTRANSCO

Readings before Manual Reset of MD MD (Present) CMD


(Cumulative MD) (B)

(A)

Reset Count

(C)
Readings after Manual Reset of MD

MD (Present) CMD Reset Count

(D)

(Cumulative MD) (E)

(F)
Readings of MD after manual reset in the previous JMR

CMD
(Cumulative MD) (G)

Reset Count

(H) (E) (G)

Comparative Statement (Readings of Export from APTRANSCO of Main Meter) Cumulative MD reading after RESET in the present JMR Cumulative MD reading after RESET in the previous JMR Difference in Cumulative MD Whether the difference in Cumulative MD

(I) = (E) - (G) (I) = (A)


YES / NO

If YES, the current month MD to be billed = (A) If NO, fill Annexure-II B Whether RESET count difference (F) (H) equal to 1 If NO, give the reasons: YES / NO

DE/TL&SS

DE/Operation

Company Rep.

ANNEXURE-II B

COMPARITIVE STATEMENT FOR THE BILLING MONTH OF (Month) 2011

Name & Location of the Plant: Location of Metering: Fuel: Date of Reading: PPA / PWPA / PPWA / OA : Time of Reading:

Comparative Statement
(Readings of Export from APTRANSCO of Main Meter of Annexure-II A) Cumulative MD reading before RESET in the present JMR Cumulative MD reading after RESET in the present JMR Cumulative MD reading after RESET in the previous JMR Difference Difference

(B) (E)

(G)

(I) = (B) - (G) (J) = (E) - (B)

Compare the values of (I) & (J) and arrive at the billing MD by taking the value which ever is high. Current month MD to be billed

DE/TL&SS

DE/Operation

Company Rep.

ANNEXURE-III

STATEMENT OF BILLING PARAMETERS FOR THE BILLING MONTH OF (Month) 2011

Name & Location of the Plant: Location of Metering: Fuel: Date of Reading: PPA / PWPA / PPWA / OA : Time of Reading:

Description MWH Final Reading on Dt. MWH Initial Reading on Dt. Difference in MWH MVAH Final Reading on Dt. MVAH Initial Reading on Dt. Difference in MVAH MVARH (Lag) Final Reading on Dt. MVARH (Lag) Initial Reading on Dt. Difference in MVARH (Lag) MVARH (Lead) Final Reading on Dt. MVARH (Lead) Initial Reading on Dt. Difference in MVARH (Lead) Multiplication Factor Billing Energy in KWH Billing Energy in KVAH Reactive energy in KVARH Maximum Demand (MD) Reading Multiplication Factor Billing MD in KVA

Import to APTRANSCO

Export from APTRANSCO

(A)

(B)

(C)

(D) (E) (A x E) (B x E) (C x E) (F) (G) (F x G)

DE/TL&SS

DE/Operation

Company Rep.

ANNEXURE-IV DETAILS OF IN-HOUSE CAPTIVE CONSUMPTION FOR THE BILLING MONTH OF (Month) 2011

Name & Location of the Plant: Location of Metering: Fuel: Date of Reading: PPA / PWPA / PPWA / OA : Time of Reading:

Energy Meter details Make: CT Ratio Type: PT Ratio: Sl. No. Class:

In-House captive consumption meter readings for the month of ______ 2011 Description Final Reading on Dt. Initial Reading on Dt. Difference MF for KWH / KVAH Total in-house captive consumption (Units) MWH / KWH MVAH / KVAH

DE/TL&SS

DE/Operation

Company Rep.