Professional Documents
Culture Documents
Project Document
Issue Date
V0.9 2007-08-02
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner.
Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. Please feel free to contact our local office or company headquarters.
Notice
The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute the warranty of any kind, express or implied.
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner.
Author
Prepared by Reviewed by Approved by Alex Su Date Date Date 2007-8-2
Purpose
This manual is written based on 3GPP 23.018, 24.008 and KPN requirement, with modifications to reflect the characteristics of Huawei equipment. On finishing equipment installation and debugging, a test group, which consists of the KPN and Huawei staff, shall carry out test cases to the equipment, ensuring that it has reached the required indexes of KPN.
Related Versions
The following table lists the product versions related to this document.
Intended Audience
The intended audiences of this document are:
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. i
l l l l l
Policy planning Installation and Commissioning engineer NM configuration engineer Technical support engineer Test team member
Conventions
Numbering Specifications for Test Items
Six-digit numeration
TXX-XXXX Meaning
TXX-XXXX
Test sub-item Test item Test category
General Conventions
Convention Arial Boldface Italic Courier New Description Normal paragraphs are in Arial. Names of files, directories, folders, and users are in boldface. For example, log in as user root. Book titles are in italics. Terminal display is in Courier New.
GUI Conventions
Convention Boldface > Description Buttons, menus, parameters, tabs, window, and dialog titles are in boldface. For example, click OK. Multi-level menus are in boldface and separated by the > signs. For example, choose File > Create > Folder.
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. ii
Notes
Before test starts, please ensure that the system is properly installed, the software and hardware debugging is passed, and the system functions normally. The test items should be validated by representatives of KPN and the Huawei. In actual test as well as in the preliminary tests, representatives of both parties should observe relevant testing criteria. As some indices are already tested before delivery, if the testing conditions are limited, sampling, or even exemption from testing can be introduced.
& Special Comments: In witness test, please stick to the contract and stipulation agreed by both parties. This manual serves as a reference only.
Update History
Updates between document versions are cumulative. Therefore, the latest document version contains all updates made to previous versions.
Issue 0.9
Date 2007-8-2
Author Alex Su
Approved by
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. iii
Project Document Test Specification for Handover in GSM System and UMTS System
Table of Contents
Table of Contents
Part I Overview ........................................................................................................................... 1
1 Overview..............................................................................................................................1 1.1 Test Topology In Stage 1 ...........................................................................................1 1.2 Test Equipments........................................................................................................3 2 Test Preparations.................................................................................................................3 2.1 Operations on MSOFTX3000 before the test session .................................................3 2.2 Operations on UMG8900 before the test session .......................................................4 2.3 Operations on MSOFTX3000 after the test session ....................................................4 2.4 Operations on UMG8900 after the test session ..........................................................5
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page i of 26
Part I Overview
Part I Overview
1 Overview
In the Huawei-KPN project, the test of Charge Audit function aims for the validation of whether the Huawei MSC can support Charge Audit function.
Topology A
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 1 of 26
Part I Overview
Topology C
Topology D
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 2 of 26
Part I Overview
Topology E
1. 2.
2G SIM card and 2G MS (Mobile Station): For the 2G subscriber. 3G USIM card and 3G UE (User equipment): For the 3G subscriber.
2 Test Preparations
There are two types of test preparations that should be done before and after completion of a test case: General preparation and Specific preparation. The general test preparation is recommended to do at the beginning of each test session. It is recommended to do at the beginning of each day before starting test execution. The specific test preparations should be executed before each TC (Test Case) and after completion of each TC (Test Case). The specific pre-condition is described in each TC.
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 3 of 26
Project Document Test Specification for Charge Audit function Select the Maintenance label in the left navigation tree;
Part I Overview
The navigation tree for maintenance is displayed in the left frame of MSOFTX3000.
Input the called number in the coming trunk with PSTN option to trace the user interface signaling. Select all the interfaces and click OK button
Save the command and output log file for record before each of the test cases execution if there is MML command executed in test cases. Procedure Select the menu item of SystemOutput Window Setting in MSOFTX3000. Expected result The Output Window Setting window is popped up.
Select the Maintenance label and then select the checkbox of Export to File and Auto save. Enter your prefer trace file name and path. Click the OK button.
Command and output log file is created successfully with recording the output in Maintenance window.
2 Select the Maintenance label and then select the checkbox of Export to File and Auto save. Enter your prefer trace file name and path. Click the OK button.
Command and output log file is created successfully with recording the output in Maintenance window.
Project Document Test Specification for Charge Audit function General procedure
Part I Overview
Check whether all the resources are released and the system changes back to normal state. For the detailed check operation, please refer to <Health check operation guide for MOSTX3000 and UMG>. Close up all the signaling trace windows. Procedure Single click the X button in right-top corner of the real-time signal trace window in MSOFTX3000. Expected result All the real-time signal trace windows closed up.
Close up all the log trace options. Procedure Select the menu item of SystemOutput Window Setting in MSOFTX3000. Expected result The Output Window Setting window is popped up.
Select the Maintenance label and remove the checkbox of Export to File and Auto save. Click the OK button
Specific procedure Save the signal trace message in the User Message Trace for each test case in MSOFTX3000. Procedure Single right click mouse and select Save All the message in real-time User Message Trace window to save the user interface signaling trace into one file as record. Single right click mouse and select Save All the message in real-time M3UA Link set window to save the ISUP signaling trace into one file as record. Expected result The all the user messages saved as *.tmf.
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 5 of 26
Project Document Test Specification for Charge Audit function Single click the X button in right-top corner of the real-time signal trace window in UMG.
Part I Overview
Close up all the log trace options. Procedure Select the menu item of SystemOutput Window Setting in UMG. Expected result The Output Window Setting window is popped up.
Select the Maintenance label and remove the checkbox of Export to File and Auto save. Click the OK button
Specific procedure Check all the resources released. Procedure Carry out MML command DSP VMGWRSC on UMG8900 LMT. Expected result All the resources are released.
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 6 of 26
The operator log on MSOFTX3000 Performance Management System successfully. Expected results
l
Test procedure
1. 2. 3.
Create the measurement entity for Mobile Originating call. Modify the measurement entity for Mobile Originating call. Delete the measurement entity for Mobile Originating call.
The measurement entity is created successfully. The measurement entity is modified successfully. The measurement entity is deleted successfully.
Remarks
T45-0102 Create,modify and delete the measurement entity for CAMEL indicated call
Objective To verify the Huawei CN can handle the measurement of Charging Audit function. Acceptance Criteria
l
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 7 of 26
Project Document Test Specification for Charge Audit function Test procedure Expected results
l
1. 2. 3.
Create the measurement entity for CAMEL indicated call. Modify the measurement entity for CAMEL indicated call. Delete the measurement entity for CAMEL indicated call.
The measurement entity is created successfully. The measurement entity is modified successfully. The measurement entity is deleted successfully.
Remarks
T45-0103 Creat,modify and delete the measurement entity for CAMEL terminated call
Objective To verify the Huawei CN can handle the measurement of Charging Audit function. Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System successfully. Expected results
l
Test procedure
1. 2. 3.
Create the measurement entity for CAMEL terminated call. Modify the measurement entity for CAMEL terminated call. Delete the measurement entity for CAMEL terminated call.
The measurement entity is created successfully. The measurement entity is modified successfully. The measurement entity is deleted successfully.
Remarks
T45-0104 Creat,modify and delete the measurement entity for Terminating Service Call.
Objective To verify the Huawei CN can handle the measurement of Charging Audit function. Acceptance Criteria
l
Network diagram
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 8 of 26
Project Document Test Specification for Charge Audit function Test Topology A Precondition
l
The operator log on MSOFTX3000 Performance Management System successfully. Expected results
l
Test procedure
1. 2. 3.
Create the measurement entity for Terminating Service Call. Modify the measurement entity for Terminating Service Call. Delete the measurement entity for Terminating Service Call.
The measurement entity is created successfully. The measurement entity is modified successfully. The measurement entity is deleted successfully.
Remarks
T45-0105 Creat,modify and delete the measurement entity for GateWay outgoing call
Objective To verify the Huawei CN can handle the measurement of Charging Audit function. Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System successfully. Expected results
l
Test procedure
1. 2. 3.
Create the measurement entity for GateWay outgoing call. Modify the measurement entity for GateWay outgoing call. Delete the measurement entity for GateWay outgoing call.
The measurement entity is created successfully. The measurement entity is modified successfully. The measurement entity is deleted successfully.
Remarks
T45-0106 Creat,modify and delete the measurement entity for GateWay incoming call
Objective To verify the Huawei CN can handle the measurement of Charging Audit function.
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 9 of 26
Project Document Test Specification for Charge Audit function Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System successfully. Expected results
l
Test procedure
1. 2. 3.
Create the measurement entity for GateWay incoming call. Modify the measurement entity for GateWay incoming call. Delete the measurement entity for GateWay incoming call.
The measurement entity is created successfully. The measurement entity is modified successfully. The measurement entity is deleted successfully.
Remarks
T45-0107 Creat,modify and delete the measurement entity for Early Call forwarding call
Objective To verify the Huawei CN can handle the measurement of Charging Audit function. Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System successfully. Expected results
l
Test procedure
1. 2. 3.
Create the measurement entity for Early Call forwarding call. Modify the measurement entity for Early Call forwarding call. Delete the measurement entity for Early Call forwarding call.
The measurement entity is created successfully. The measurement entity is modified successfully. The measurement entity is deleted successfully.
Remarks
T45-0108 Creat,modify and delete the measurement entity for Late Call forwarding Call
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 10 of 26
Project Document Test Specification for Charge Audit function Objective To verify the Huawei CN can handle the measurement of Charging Audit function. Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System successfully. Expected results
l
Test procedure
1. 2. 3.
Create the measurement entity for Late Call forwarding Call. Modify the measurement entity for Late Call forwarding Call. Delete the measurement entity for Late Call forwarding Call.
The measurement entity is created successfully. The measurement entity is modified successfully. The measurement entity is deleted successfully.
Remarks
T45-0109 Creat,modify and delete the measurement entity for Roaming call
Objective To verify the Huawei CN can handle the measurement of Charging Audit function. Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System successfully. Expected results
l
Test procedure
1. 2. 3.
Create the measurement entity for Roaming call. Modify the measurement entity for Roaming call. Delete the measurement entity for Roaming call.
The measurement entity is created successfully. The measurement entity is modified successfully. The measurement entity is deleted successfully.
Remarks
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 11 of 26
T45-0110 Creat,modify and delete the measurement entity for non-call service
Objective To verify the Huawei CN can handle the measurement of Charging Audit function. Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System successfully. Expected results
l
Test procedure
1. 2. 3.
Create the measurement entity for non-call service. Modify the measurement entity for non-call service. Delete the measurement entity for non-call service.
The measurement entity is created successfully. The measurement entity is modified successfully. The measurement entity is deleted successfully.
Remarks
The operator log on MSOFTX3000 Performance Management System and the measurement entity for Mobile Originating call has been created successfully. A and B are all KPN 2G subscriber and registered in Huawei MSC. Expected results
Test procedure
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 12 of 26
1. 2.
Executed command MOD GBILLCTRL to generate MOC bill . Originate a call from A to B within a Measurement Time Period. Executed command MOD GBILLCTRL to not generate MOC bill. Originate a call from A to B within a Measurement Time Period.
l l
The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 1, Answer No Charging Times is 0, Tickets Count is 1, Abnormal No Charging Rate is 0. The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 0, Answer No Charging Times is 1, Tickets Count is 0, Abnormal No Charging Rate is 0.
3. 4.
l l
Remarks
T45-0202 Charge audit for CAMEL indicated call of IN-MO and IN-MF
Objective To verify the Charging Audit function of Huawei CN is normally. Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System and the measurement entity for Camel MOC Charging Audit Measurement has been created successfully. AB and C are all KPN 2G IN subscriber and registered in Huawei MSC.and C Registered CFNRY in HLR Expected results
Test procedure
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 13 of 26
1. 2.
Executed command MOD GBILLCTRL to generate AI_MOC bill . Originate a call from A to B within a Measurement Time Period. Executed command MOD GBILLCTRL to not generate AI_MOC bill. Originate a call from A to B within a Measurement Time Period. Executed command MOD GBILLCTRL to not generate AI_CFW bill. Originate a call from A to B but B no answer forward to C
l l
The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 1, Answer No Charging Times is 0, Tickets Count is 1, Abnormal No Charging Rate is 0. The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 0, Answer No Charging Times is 1, Tickets Count is 0, Abnormal No Charging Rate is 0. The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 1, Answer No Charging Times is 0, Tickets Count is 1, Abnormal No Charging Rate is 0. The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 0, Answer No Charging Times is 1, Tickets Count is 0, Abnormal No Charging Rate is 0.
3. 4.
l l
5. 6.
l l
7. 8.
Executed command MOD GBILLCTRL to not generate AI_CFW bill. Originate a call from A to B but B no answer forward to C
l l
Remarks
The operator log on MSOFTX3000 Performance Management System and the measurement entity for TCAMEL Charging Audit Measurement has been created successfully. A and B are all KPN 2G IN subscriber and registered in Huawei MSC. Expected results
Test procedure
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 14 of 26
1. 2.
Executed command MOD GBILLCTRL to generate AI_MTC bill . Originate a call from A to B within a Measurement Time Period. Executed command MOD GBILLCTRL to not generate AI_MTC bill. Originate a call from A to B within a Measurement Time Period.
l l
The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 1, Answer No Charging Times is 0, Tickets Count is 1, Abnormal No Charging Rate is 0. The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 0, Answer No Charging Times is 1, Tickets Count is 0, Abnormal No Charging Rate is 0.
3. 4.
l l
Remarks
The operator log on MSOFTX3000 Performance Management System and the measurement entity for MTC Charging Audit Measurement has been created successfully. A and B are all KPN 2G subscriber and registered in Huawei MSC. Expected results
l l
Test procedure
1. 2.
Executed command MOD GBILLCTRL to generate MTC bill . Originate a call from A to B within a Measurement Time Period. Executed command MOD GBILLCTRL to not generate MTC bill. Originate a call from A to B within a Measurement Time Period.
The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 1, Answer No Charging Times is 0, Tickets Count is 1, Abnormal No Charging Rate is 0. The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 0, Answer No Charging Times is 1, Tickets Count is 0, Abnormal No Charging Rate is 0.
3. 4.
l l
Remarks
T45-0205 Charge audit for GateWay outgoing call of the call from MSC Server to VMS
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 15 of 26
Project Document Test Specification for Charge Audit function Objective To verify the Charging Audit function of Huawei CN is normally. Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System and the measurement entity for GWO Charging Audit Measurement has been created successfully. A is KPN 2G subscriber and registered in Huawei MSC,B is a PSTN subscriber Expected results
l l
Test procedure
1. 2.
Executed command MOD GBILLCTRL to generate GWO bill. Originate a call from A to B within a Measurement Time Period. Executed command MOD GBILLCTRL to not generate GWO bill. Originate a call from A to B within a Measurement Time Period.
The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 1, Answer No Charging Times is 0, Tickets Count is 1, Abnormal No Charging Rate is 0. The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 0, Answer No Charging Times is 1, Tickets Count is 0, Abnormal No Charging Rate is 0.
3. 4.
l l
Remarks
T45-0206 Charge audit for GateWay incoming call of the call from OLO and VMS to MSC Server
Objective To verify the Charging Audit function of Huawei CN is normally. Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System and the measurement entity for GWI Charging Audit Measurement has been created successfully. B is KPN 2G subscriber and registered in Huawei MSC,A is a PSTN subscriber Expected results
Test procedure
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 16 of 26
1. 2.
Executed command MOD GBILLCTRL to generate GWI bill . Originate a call from A to B within a Measurement Time Period. Executed command MOD GBILLCTRL to not generate GWI bill. Originate a call from A to B within a Measurement Time Period.
l l
The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 1, Answer No Charging Times is 0, Tickets Count is 1, Abnormal No Charging Rate is 0. The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 0, Answer No Charging Times is 1, Tickets Count is 0, Abnormal No Charging Rate is 0.
3. 4.
l l
Remarks
T45-0207 Charge audit for Early Call forwarding call of the call from PSTN and MS
Objective To verify the Charging Audit function of Huawei CN is normally. Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System and the measurement entity for GMSC CFW Charging Audit Measurement has been created successfully. A B and C are all KPN 2G subscriber and registered in Huawei MSC,B Registered CFU in HLR. Expected results
l l
Test procedure
1. 2.
Executed command MOD GBILLCTRL to generate CFW bill . Originate a call from A to B forward to C within a Measurement Time Period. Executed command MOD GBILLCTRL to not generate CFW bill. Originate a call from A to B forward to C within a Measurement Time Period.
The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 1, Answer No Charging Times is 0, Tickets Count is 1, Abnormal No Charging Rate is 0. The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 0, Answer No Charging Times is 1, Tickets Count is 0, Abnormal No Charging Rate is 0.
3. 4.
l l
Remarks
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 17 of 26
Project Document Test Specification for Charge Audit function Objective To verify the Charging Audit function of Huawei CN is normally. Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System and the measurement entity for VMSC CFW Charging Audit Measurement has been created successfully successfully. A B and C are all KPN 2G subscriber and registered in Huawei MSC,B Registered CFNRY in HLR. Expected results
l l
Test procedure
1. 2.
Executed command MOD GBILLCTRL to generate CFW bill . Originate a call from A to B but B not answer and forward to C Executed command MOD GBILLCTRL to not generate CFW bill. Originate a call from A to B but B not answer and forward to C
The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 1, Answer No Charging Times is 0, Tickets Count is 1, Abnormal No Charging Rate is 0. The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 0, Answer No Charging Times is 1, Tickets Count is 0, Abnormal No Charging Rate is 0.
3. 4.
l l
Remarks
The operator log on MSOFTX3000 Performance Management System and the measurement entity for Mobile Originating call has been created successfully. A and B are 2G inbound subscribers who are roaming to KPN and registered in Huawei MSC. Expected results
Test procedure
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 18 of 26
1. 2.
Executed command MOD GBILLCTRL to generate ROAM bill. Originate a call from A to B within a Measurement Time Period.
l l
The call is connected successfully. The result of measurement is: Answer Times is 1, Answer Charging Times is 1, Answer No Charging Times is 0, Tickets Count is 1, and Abnormal No Charging Rate is 0.
Remarks
T45-0210 Charge audit for non-call service,including SMS,SS action and USSD
Objective To verify the Charging Audit function of Huawei CN is normally. Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System and the measurement entity for None Call Charging Audit Measurement has been created successfully. A and B are all KPN 2G subscriber and registered in Huawei MSC. Expected results
l
Test procedure
1. 2. 3. 4. 5. 6.
The result of measurement is: SS Action Charging Times is 1, SS Action No Charging Times is 0, SS Action Successful Times is 1,
The result of measurement is: SS Action Charging Times is 1, SS Action No Charging Times is 0, SS Action Successful Times is 1, The result of measurement is: SMS MO Charging Times is 1, SMS MO No Charging Times is 0, SMS MO Successful Times is 1, SMS MT Charging Times is 1, SMS MT No Charging Times is 0, SMS MT Successful Times is 1.
Remarks
T45-0211 The number of B-number answer but no CDR exceed the designed threshold in a designed period
Objective This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 19 of 26
Project Document Test Specification for Charge Audit function To verify the Charging Audit function of Huawei CN is normally. Acceptance Criteria
l
The operator log on MSOFTX3000 Performance Management System and the measurement entity for Mobile Originating call has been created successfully and its Upper threshold is set 2% A and B are KPN 2G subscribers and registered in Huawei MSC. Expected results
l
Test procedure
1. 2.
Executed command MOD GBILLCTRL to generate MOC bill. Originate a call from A to B within a Measurement Time Period. MOC Abnormal No Charging Rate is 3%
Remarks
This document is for use solely within Huawei and KPN. It should not be discussed, shown or referred to outside the organisation, without prior approval of the owner. Page 20 of 26