1. Document Control
Change Record
Date 07 July 2006 Author Vinay Srinath Version 1.0 Change Reference No Previous Document
Reviewers
Date Name Version 1.0
Distribution
Name Organisation
Approvers
Name Signature Date
Contents
1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
Document Control ....................................................................................................2 Introduction...............................................................................................................4 Work Order Relationships.......................................................................................5 Work Order Scheduling.........................................................................................16 Gantt chart ...............................................................................................................17 Work Order Costing...............................................................................................19 Material Request and Issue Enhancements.........................................................23 Support for Non Planned Direct Items .............................................................27 Work Request Enhancements ...............................................................................33 Preventive Maintenance Enhancements..............................................................45
2. Introduction
Overview Following are the features that are new with 11i10
Work Order Relationships Work Order Scheduling Gantt Chart Work Order Costing Material Request and Issue Enhancements Support for Non-Planned Direct Items Work Request Enhancements Preventive Maintenance (PM) Enhancements
New features enable users to effectively manage complex maintenance jobs through four types of Work Order relationships. These relationships are Parent Child (scheduling), End to Start Dependency (scheduling), Follow Up, and Cost Relationships.
3.1.1 Parent Child Relationship Parent-Child Work Orders represent a network of Work Orders, which includes one top level Work Order that defines the timeline of all its children (also known as sub or minor) Work Orders. In a Parent-Child relationship, the start and end dates of the children Work Orders must be within the start and end dates of the parent Work Order. Within a network, a child Work Order can be also be parent to another Work Order within the network. One parent can have multiple children, but one child can only have one direct single parent. Child Work Orders can have optional scheduling dependency relationships among other sibling Work Orders, at the same child level. Dependency among child Work Orders enables users to schedule work with a sequential dependency.
Page 5 of 51
This section highlights the new feature Parent Child Relationship in Work Orders:
Step No 1&2 1. Create a Work Order. Added a Resource so that the duration taken to complete the Work Order is 1 hour. 2. Navigate to Responsibility: Maintenance Super User Query the Work Order created.
Step No 3& 4
Page 6 of 51
Step No 5&6
5. Click the GO Button besides the Create Child Work Order LOV Create a Child Work Order.
Step No 7&8
7. Added an Operation and Resource to the Child Work Order so that it takes 0.5 hours.
8. Now if we see the Relationship the Child Work Order would show the time taken in the Gantt Chart
Page 7 of 51
Step No 9 & 10
Step No
11. Now Navigate to Responsibility: Enterprise Asset Management. If we try to Complete the Parent Work Order when the Child Work Order is still in Released state the Below Error would come up stating to complete the Child Work Order first.
11 & 12
Page 8 of 51
Step No 13
13. Now if we try and complete the Parent Work Order, the Work Order gets completed and the message does not appear. This was an example where we can see the Parent Child Relationship in Action.
Step No 14
14. The Relationships Tab also redirects the user to the Self Service page for the definition of the Work Order Relationships.
Page 9 of 51
Step No 3 &4
3. Choose Create Followup Work Order from the LOV and click GO
Page 10 of 51
Step No
6. If we see the Follow Up Work Order is there in the Work Relationships tab in the work order.
5&6
Step No 7&8
8. The Work Order gets completed. This is independent of scheduling or cost relationships.
Page 11 of 51
3.1.3
Step No 1&2
1. Create a Work Order. Add a Resource so that the duration taken to complete the Work Order is 1 hour.
2. Create a second Work Order. Add a Resource so that the duration taken to complete the Work Order is 1 hour.
Page 12 of 51
Step No
3. Create a third Work Order. Add a Resource so that the duration taken to complete the Work Order is 1 hour. Make sure that the Start Date of this Work Order is equal to the Completion Date of the Work order WO96897.
4. Query the first Work Order WO96896 and click on Relationships. This would open up in the self-service window in the Work Relationships tab. Click on Update Work Hierarchy to add the other 2 work orders created as Child WO.
3& 4
Step No 5&6
5. Select the Work Order and Choose Add Existing Work Orders from the LOV and click on GO.
6.Give the Work Order Number WO96897 and click on GO. The Work Order gets queried up.
Page 13 of 51
Step No 7&8
7. Select the Work Order and click on Apply. The Work Order gets added as a Child Work Order.
8. Do the same for the other work order also, so that it gets added up as a child work order to the same parent Work Order.
Step No 9 & 10
9. Select the Child Work Order WO96897 and Click on GO besides the Update Dependencies.
10. Click on Add Dependencies and query for the other Child Work Order WO96898. Choose Next from the Dependency Type LOV and click on Apply.
Page 14 of 51
Step No
11. You get the confirmation that the dependency has been created.
12. If we again select the same work order and choose Update Dependencies, we can see that the Schedule Status is Valid. If we select the WO96898 we can see the dependency type as Prior.
11 & 12
Step No
13. Release all the Work Orders. Try Completing the third Work Order WO96898; you get an error as this work order cannot be Completed as there is a end to start scheduling relationship between this work order and WO96897.
13
With this relationship, the nextWork Order cannot start until the prior Work Order is completed. Work Orders scheduled start date is dependent on anotherWork Orders completion.
Page 15 of 51
4.
Page 16 of 51
5.
Gantt chart
The Gantt chart enhancements support eAM work order relationships functional requirements: The Gantt chart can graphically display eAM Work Orders, including displaying dependency and parent child relationships. Manual mode is supported within the Gantt chart for Work Order Relationships. In the Gantt chart in manual mode, if a top-level Work Order is rescheduled all its non-completed, non-firm Work Orders, are re-scheduled appropriately. If we observe below we created a Work Order WO96896 and defined 2 other work orders WO96897 and WO96898 as Child Work Orders. The Gantt chart shows the same in a graphical way.
Page 17 of 51
The Gantt chart supports visual display of the End to Start Dependency relationships. If we observe there is an End to Start Dependency between the Work Orders WO96897 and WO96898. The same is shown in Relation is shown as Next Dependency in the relationships table.
Page 18 of 51
6.
Step No 1&2
2. Create a second Work Order. Add an Operation and Resource to the same.
Page 19 of 51
Step No 3& 4
3. Perform Resource Transactions for the First Work Order WO92700 by navigating to the Resource Transactions form.
4. If we check the Costs for this work order we can see the labor cost as a results of the Resouce Transactions.
Step No
5. Create a Parent Child Relationship between the 2 work orders created. This has already been discussed before in the Parent Child relationship section 3.1.1. After the relationship is created it will look like below.
6.Perform the Rsource Transactions for the second Work Order WO92701 by navigating to Resource Transactions form.
5&6
Page 20 of 51
Step No 7&8
7. If we check the Costs for this work order we can see the labor cost whihch is as a result of the Resouce Transactions.
8. Click on Relationships tab for the parent Work Order WO92700. Click on View Costs Button.
Step No
9. The page with the Work Order Cost Details for both the Parent and Child work Orders gets displayed. Ensure that the Include Child Work Order Field is set to YES. We can also Observe the Cumulative Actual Cost is showing the total cost for both the work orders. Thus the Actual and Estimated costs of the Child Work Order are rolled up to the Parent Work Order.
10. Now to Import the Scheduling Hierarchy to create a Cost Hierarchy. Click on Update Alternate Cost Hierarchy button.
9 & 10
Page 21 of 51
Step No
11. The below page opend up. Select the Work Order shown and click on Import Work Hierarchy
12. We get a Confirmation message showing that the Work Hierarchy was successfully imported from the scheduling Hierarchy and we can see the Child work order below the parent work order.
11 & 12
Step No 13
13. Now if we check the Work Relationships tab for the Work Order WO92700, we can see a additional line in the Relationships showing the Relation as Cost Child.
Subsequently the cost hierarchy can be managed independent of the scheduling hierarchy.
Page 22 of 51
7.
Step No
1. Create a Work Order. Ensure that the Check Box Enable Material Issue Requests is checked. This would ensure the Allocation of the Materials attached, once the work order is released.
2. Add Material To the Work Order by clicking on the Materials Tab. Ensure that there is sufficient On hand for the Material. . Release the Work Order and we will observe that the Allocated quantity has got populated.
1&2
Page 23 of 51
Step No
3. Navigate to Maintenance Super User Responsibility and then to Stores Tab. Query for the Work Order created. The Allocation of Material creates Move Orders. We can observe below that a Move Order for quantity 5 has got created.
4. Select the Line and give only a partial quantity to issue as 2. Click on Issue Button.
3& 4
Step No
5. We will get a confirmation message that the quantity 2 has been issued. We can observe that the allocated quantity has got reduced to 3. The Allocation is still maintained with the same Move order.
6.Issue 2 more quantity, but this time check the Check Box Delete Remaining Allocation. You get a confimation that 2 quantities have been issued and there is no data existing in the materials area. The Remaining Allocated quantity of 1 has been deallocated.
5&6
Page 24 of 51
Step No 7&8
7. Query the Work Order in the Work Orders Tab. Navigate to the Materials tab as shown below. Click on the Request New Inventory Items.
8. Enter all the Details for the New Inventory Item and click on Apply.
Step No
9. We get a Confirmation Message that the New Material has been added. If we see below the New Material is shown below and the quantity has also got allocated.
10. Navigate to the Stores tab and then the Material Issue tab. The Material is available to be issued. This tab is used for issuing Allocated material. Select the Material to be issue and the Material gets issued and there is aconfirmation message, which comes up as shown below.
9 & 10
Page 25 of 51
Step No
11. To Issue Material, which is not Allocated, we will have to use the One Step Material Issue. Select the Material to be issued which is not Allocated and then click on One Step Material Issue
12. This would open up the One Step Material Issue page. Give all the details such as Subinventory and then select the Material and click on Issue.
11 & 12
Step No 13
13. You will get a confirmation message saying that the material has been successfully issued. The quantity issued is also updated to 5.
Page 26 of 51
8.
Step No 1&2
1. Create A Direct Item (Non Stock Item). Navigate to Item Master Window, and select the Template Non-Stocked Item.
2. Save the same. We can observe that the Stockable check box is unchecked, and the Pirchasable is checked. Assign it to a Organization.
Page 27 of 51
Step No 3& 4
3. Add the Direct Item to the Maintenance BOM (Activity BOM). Navigation Activities > Maintenance BOM.
4. Create a Work Order with the Activity, which has the Direct Item.
Step No
5. Check the Materials tab and you will find the Direct Item already associated with the work order. This has been imported from the Maintenance BOM.
6.Ensure that the WIP Parameters is set to At Job Schedule release for the outside Processing Parameter. This is required when we release the work order for the Purchase Requisition to be created automatically.
5&6
Page 28 of 51
Step No
8. If we check the requests Navigation View > Requests, we can see 2 requests getting launched Requisition Import and Create Releases. Ifwe click on the output of Requisitions Import we can see the Number of Approved requisitions created as 1.
7&8
Step No 9 & 10
9. Navigate to Purchasing > Requisitions > Requisitions Summary. Query with Item = Direct Item (Grease in this case)
Page 29 of 51
Step No
11. Since the Direct Item is included in the Materials of the Work Order it is included within the Estimaterd Material Costs of an Activity and Work Order. Navigation > Work Order > Costs > Value Summary > Details > Detailed Estimates. We can see below that the Direct Item is included in the Cost Estimation. Here the cost is zero as we havent defined the cost for the direct item.
11
Page 30 of 51
1&2
Step No 3& 4
Page 31 of 51
Step No 5&6
5. Navigate to Purchasing > Requisitions > Requisitions Summary. Query with Description = Description Direct Item (Descp Direct Item in this case)
6. This shows the Requisition Number created. This can then be Autocreated to a Purchase Order where the Destination would be Shop Floor.
Step No
7. Since the Direct Item is included in the Materials of the Work Order it is included within the Estimaterd Material Costs of an Activity and Work Order.
Navigation > Work Order > Costs > Value Summary > Details > Detailed Estimates. We can see below that the Direct Item is included in the Cost Estimation. Here the cost is 100 as we had given the price for the direct item.
Page 32 of 51
9.
Page 33 of 51
Enhancements:
1. Ability to create Work Requests for Capital Assets and Rebuildable inventory. 2. Ability to capture contact information (such as E-mail and Phone Number) about the originator reporting the problem.
Step No 1&2
1. Create a Work Request. Resp: Maintenance Super User > Work Request tab > Click on Create Work Request.
2. Give all the details as shown below. If we see below we can see that we can capture information such as E-Mail and Phone Number. Click on Apply.
Step No 3
Page 34 of 51
3. Ability to change the Asset Number and assigned department during Work Request update.
Step No 1&2 1. Open the Work Request, which is already created. In this case it is 19212. 2. Click on the Work Request number. This will open up the details for the Work Request.
Step No 3& 4
3. Change the Asset Number to All Lifts. The Assigned departement is changed to W-Maint. Click on Apply.
4. You get the Confirmation message that the Work Request is successfully updated.
Page 35 of 51
4. Enable descriptive flex fields for Work Requests to capture additional information.
Step No 1. Navigate to Responsibility System Administrator > Application > Flexfield > Descriptive > Segments. Query for Work Request. 2. Unfreeze the Flexfield, unchecking the check box Freeze Flexfield Definition. Click on Segments and define 2 segments as shown below. Ensure that they are enabled. Freeze the Flexfield definition by checking the same check box and save the Flexfield.
1&2
Step No 3& 4
3. Navigate to Maintenance Super User and click on Work Request Tab. Click on Create Work Request.
4. Give the Details as shown below. Observe that the Flexfield descriptive information is available. Enter the details for the same. Click on Apply.
Page 36 of 51
Step No 5&6
Step No 7
Page 37 of 51
1&2
Step No
3. Check for Department Approvers. Departments are specified. So Notifications will be sent to all the users who have this responsibility. If the Primary Approver is specified then the notification will go only to that Primary Approver.
4. Check for the User ABC in the Notifications page, which is the home page. We can see the Work Request 1000613.
3& 4
Page 38 of 51
Step No
5. Login with User XYZ. Ensure that this User has the same responsibility as the user ABC. In the Home page we can see the Request 1000613.
6. Open the Request 1000613 by Clicking on the same with the same User XYZ. The details are shown below. Click on Reject. Here XYZ has rejected the Request.
5&6
Step No
7. The Work Request is rejected and we can see that the Work Request is no longer there in the notification page.
8. Log in as User ABC and we can see the Request 1000613 with the Subject Work Request # 1000613 has been Rejected. So the Originator of the Work Request has got the Notification, when the Status got changed.
7&8
Page 39 of 51
6. Ability for a Work Request to be associated to a Work Order with different Asset Number/Serial Rebuild.
Step No 1. Query for a Existing Work Request which is at a status of Awaiting Work Order. The Asset Number here is ST0001. The Work Request Number is 9206. 2. Query a Work Order, which is already Created. Here the Asset Number is All Lifts. Associate the Work Request with this Work Order under the Maintenance Request Tab. Save the Work Order.
1&2
Step No 3
3. We get the Confirmation in the status bar. The work order is successfully saved.
So here we see that the Work Request of Asset Number ST0001 is associeated with the Work Order of Asset Number All Lifts.
Page 40 of 51
1&2
Step No 3& 4
3. If we see below the Asset Number the mandatory star is not there, which shows that it is not mandatory. Give all the other details and click on Apply.
Page 41 of 51
Step No 5&6
5.Query the Work Request # 19214 created above. Click on the Work Request Number for details.
6. We can see that the Asset Number is blank. So we can create Work Request without Asset number as mandatory.
Page 42 of 51
1&2
Step No 3& 4
3. Change the Requested For field value to MFG3. Fill in other details and click on Apply
Page 43 of 51
Step No
5.Query the Work Request # 19215 created above. Click on the Work Request Number for details.
6.If we see the Work Request details, the Requested For Field is MFG3. So we can see that the enhancement allows to Create Work Requests for others, basically report problems for others.
5&6
Page 44 of 51
10.
Page 45 of 51
1. Users can forecast Preventive Maintenance work orders for multiple capital assets or rebuildable inventory. 2. Within the Forecast Work Order Page, users can choose to include the children of capital assets or rebuildable inventory in the forecast of work orders search. 3. Work orders can be associated to an Oracle Project/Task or Seiban number at the time of implementing PM suggestions to work orders.
Step No 1&2 1. Navigate to Resp > Enterprise Asset Management > Work Order Planning > Maintenance Workbench 2. There is a Third Tab introduced called the Forecast Work Order Tab. This allows the user to Forecast Multiple Assets at the same time.
Page 46 of 51
Step No
3. Click on the Asset numbers you want to Forecast at the same time. You can click on Control Key when selecting Asset Numbers in the left Pane. Give the horizon at the right pane and click on Run. This will Forecast for all the assets you have choosen.
4. You can then Select the Check box and click on Implement to Implement the Work Orders. Alternatively you can also check the Include Children Check box to Forecast the Children of Capital Assets and Rebuildable Inventory.
3& 4
Step No 5&6
5. When you select a Work Order for Implementing you can associate the Work Order with a Project and Task.
Page 47 of 51
4. Suppression templates can be defined at the capital assets or rebuildable inventory group/activity association level. 5. When new capital assets or rebuildable inventory items are created in an organization, the corresponding suppressions are automatically associated based on the template associations.
Step No 1&2 1. Navigate to Resp > Enterprise Asset Management > Preventive Maintenance > Suppression Template. 2.The Suppresion Template window opens up where you can define them at the Asset Activity Level.
Page 48 of 51
Step No 3& 4
4. To check out the same we created a new Asset number for the Asset Group LDL-Asset-group-B.
Step No 5&6
5.The activities are automatically associated as there was a Activity template associated.
6.If we Navigate to the Suppression window and query for the Asset Number we had created and the activity we can see the suppression already created.
Page 49 of 51
6. A new type of meter called a Change Meter can be used as a counter to track incremental usage.
Step No 1&2 1. Navigate to Resp > Enterprise Asset Management > Meters > Meter Definition. 2. Define a Meter with type as Change as shown below.
Step No
4. If we observe the Reading Value it will show the actual increment Reading and not the abolute value. This can be used to track the incremental Readings wherever required.
3& 4
Page 50 of 51
Enterprise Asset Management (eAM) New Features in Release 11.5.10 with Demo Test Cases October 2006 Author: Vinay Srinath Contributing Authors: N/A Oracle Corporation World Headquarters 500 Oracle Parkway Redwood Shores, CA 94065 U.S.A. Worldwide Inquiries: Phone: +1.650.506.7000 Fax: +1.650.506.7200 www.oracle.com Oracle Corporation provides the software that powers the Internet. Oracle is a registered trademark of Oracle Corporation. Various product and service names referenced herein may be trademarks of Oracle Corporation. All other product and service names mentioned may be trademarks of their respective owners. Copyright 2006 Oracle Corporation All rights reserved.
Page 51 of 51