You are on page 1of 12

BTS SITE AUDIT CHECKLIST

Site Code: _______________ Site Address: _______________ Site Type (GF/RT, Indoor/ Outdoor): ___________________ Site Configuration: _______________ Audit Start Date: _____________ Last PM Date: _____________

Date: _________________

Quality Engineer: _______________________ Area: _____________ City: _____________ Region: _____________ Audit Finish Date: _____________ Next PM Date : _____________

CABINETS INSTALLATION
Sr. # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Description of Item Equipment base is properly installed on pad Proper equipment placing on base with proper size bolts Rectifier cabinet installation Batteries installation Rectifier modules according to configuration Rectifier modules are tightened properly Batteries according to configuration Rectifier external cabling Rectifier internal cabling AC supply connected to rectifier Rectifier commissioning DC supply voltages SUMA card installation Combiners Modules installation TRE modules installation Diplexers installations BTS external cabling BTS internal cabling RF connectors connection with modules BTS commissioning Cabinets locks are working properly Cabinet doors are working properly OK Status NOK NA Corrective action if NOK

ELECTRICAL & GROUNDING WORKS


(1)

CABINETS INSTALLATION
Sr. # Sr. # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Description of Item Description of Item AC voltages checked and within limits Shelter internal grounding connected to main earth Temperature sensor is working properly Air-conditioners are working and cooling is checked Supply to rectifier is proper DC supply to BTS Alarms termination panel availability Grounding of rectifier Grounding of BTS Rectifier grounding cables laying BTS grounding cables laying Rectifier grounding terminated at MGB BTS grounding terminated at MGB AC & DC cables are routed properly Cable entry water proofing Feeder grounding terminated properly at all locations Microwave ODU is grounded properly Microwave IDU grounded properly Is lightening arrestor ground terminated properly Lightening arrestors are grounded Transmission rack is grounded Status NOK NA Status OK NOK NA OK Corrective action if NOK Corrective action if NOK

(2)

CABINETS INSTALLATION
Sr. # Description of Item OK Status NOK NA Corrective action if NOK

ENGINEERING SPECIFICATIONS
Sr. # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Description of Item OK Status NOK NA Corrective action if NOK

Are the Fan units working properly Fan units are placed properly and as per the engineering configuration Blower of the Fan Units are working Properly TRE's are installed as per the configuration and as per engineering rule Combiner and TRE's are not placed in the same shelf TRE's are placed in the cabinets designated as per engineering catalougue Synchronization cable needed and installed VSWR alarms on Combiners Hardware degradation alarm on TREs Hardware failure alarm on site TRE's are properly placed and locked after its installation TRE's installation is done in the shelf as per engineering requirments CSO3 cable is used to connect TRE's with Combiner CSO3 cable is properly tapped on the respective terminals CSO4 cable is used to connect Combiner with BTS ports CSO4 cable is properly tapped on the respective terminals Jumper cables are installed propelry Feeders cables are installed properly All external alarms are working and tested Radio link indoor units are properly installed Protected system master/ slave changeover checked ATS is working properly in case of power failure Rectifier modules installed and are in working condition Over voltage protectors are installed with modules Sectors Antennas installed properly Microwave ODU is installed properly ESD strips available on site Loopback of E1's is ok.

ENVIRONMENT
Sr. # Description of Item Status OK NOK NA (3) Corrective action if NOK

CABINETS INSTALLATION
Sr. # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Description of Item BTS modules labeling Transmission card labeling Labeling of RF cables is done Labeling of IF cable is done Labeling of PCM cables is done Labeling of ground cables is done Labeling of all alarms is done on both sides of alarms cables Cable treys are levelled Cable treys are fitted properly Site completion Left-over is removed from the site Site Cleanliness Trimming of cable ties Access to equipments and mounts Security guards availability DG set Exhaust pipe is installed and its in proper working condition DG has proper earthing and lightining protection OK Status NOK NA Corrective action if NOK

(4)

CABINETS INSTALLATION
Sr. # 18 19 20 Description of Item Over Breakage protection is available on MCB/LVDB Site Visit date mentioned on log book EHS procedures available on site OK Status NOK NA Corrective action if NOK

Audit Completed on: Punch List handed over for rectification of snags: All issues in punch list are checked and cleared: Punch List cleared on: Had the site has major snags to effect network KPI's? YES NO

Activity Performed by Auditor

Audited By Name: ________________________________

Signatures: ____________________________

(5)

Equipment Photos

BTS Over View

TRE's connection

Alarm Cables

Rectifier Modules

Battery Bank

Jumpers/CSO3 Connection

BTS grounding

Generator/Fuel Tank

Feeders Labelling

TRE Module LED

Alarm Connection

Shelter

BTS Photos

2.16.6.5 MB02E-Multiband 3+3 Sectors with Twin-TRX

1 S U M 2

FANU

FANU

FANU

FANU

FANU

FANU

AN

AN

AN

AN

AN

AN

3 4 FANU

3 4 FANU

3 4 FANU

3 4 FANU

3 4 FANU

3 4 FANU

POWER SUPPLY

Mobilink BTS Site Labelling


1 Feeders and Jumpers
Steel Tags on feeders end (indoor and outdoor sites) Jumpers labelling at BTS -end. CSO4 cables labelling at Combiners end. 2

Abis Cable
ABIS1 label on 1st Abis on both ends of cable. ABIS2 label on 2nd Abis on both ends of cable.

BTS Alarm Cables (Indoor Site)


Alarm1-8 label on both sides of first alarm cable Alarm9-16 label on both sides of 2nd alarm cable Alarm 1 and Alarm 2 should not be used

BTS Power Cables


Labels of -48V and BTS1 on both sides of BTS Power cable Labels of 0V and BTS1 on both sides of BTS Power cable

BTS Rack
Labels of 900 and BTS-1 on first BTS rack Labels of 1800 and BTS-2 on 2nd BTS rack Label of Base Station on BTS rack at front end

BTS Combiners
Label of 900 on GSM Combiners Label of 1800 on DCS Combiners

7 8

Alarm Box
Label all alarms cables terminating in alarm box , e.g. FIRE, DOOR,TEMPERATURE etc.

IF Cable
Microwave 1 label and far-end site code label e.g. N-HWY-957 on main IF cable Microwave 2 label and far-end site code label e.g. N-HWY-957 on extension IF cable

9 10 11

DDF
Label of site code on top of each DDF , e.g. N-COW-1111

Tributary Cable
Tag on tributary cable with complete information on it.

Battery Banks
Label of Battery Bank 1 on lower battery bank Label of Battery Bank 2 on upper battery bank

12

Rectifier Power Cables


label of 230V/240V whichever available on both sides of rectifier power cable label of 0V on both sides of rectifier power cable

13 14

Rectifier Circuit Breakesr


Label each circuit breaker installed in rectifier.

Earthing
Earthing label on both sides of BTS earthing cable

Earthing label on both sides of MW rack earthing cable Earthing label on both sides of MW IDU earthing cable Earthing label on both sides of ODU earthing cable. Earthing lables on lightening arrestors, at arrestors end. Earthing labels on both sides of rectifier earthing cable