Report on

Solar Power in India 2011


Solar PV CSP/Solar Thermal
Sector Overview Recent Developments & Trends Update on JNNSM Policy/Regulation State Initiatives Financing Technology Options Key Projects & Applications Leading Players Global Experience

India Infrastructure Research


www.indiainfrastructure.com

Table of Contents (Release date: April 21, 2011. Number of pages: 316)

SOLAR POWER IN INDIA 2011

SECTION A - OVERALL SECTOR SCENARIO 1. RENEWABLE ENERGY OVERVIEW . . . . . . . . . . . . . . . . - Introduction - Energy Scenario - Size and Growth - Policy - Key Drivers - Renewable Energy Market by Technology - Growth Plans - Issues and Challenges - The Way Ahead 2. SOLAR POWER OVERVIEW . . . . . . . . . . . . . . . . . . . . . - Introduction - Size and Growth - Regulatory Support - Key Trends - Market Structure - Plans and Investments - Issues and Challenges - Outlook 3. KEY RECENT DEVELOPMENTS . . . . . . . . . . . . . . . . . . . - Introduction - Policy and Regulatory Developments - Recent Developments in JNNSM - State Initiatives - Industry Developments - Summing Up 4. SIZE AND GROWTH . . . . . . . . . . . . . . . . . . . . . . . . . . . - Introduction - Existing Capacity - Upcoming Capacities - Future Roadmap - Issues and Challenges 5. JNNSM UPDATE: PHASE I AND BEYOND . . . . . . . . . . . - Introduction - Salient Features of Guidelines - Analysis of Bidding under Phase I

- Projects Selected for Phase I - Roadmap for Phase II - Issues and Challenges - The Way Forward 6. REGULATORY FRAMEWORK . . . . . . . . . . . . . . . . . . . . - Introduction - Regulatory Framework - CERC Regulations - State Regulations - Issues and Challenges 7. STATE POLICIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - Introduction - Gujarat - Rajasthan - Karnataka - Madhya Pradesh - West Bengal - State Tariffs and Renewable Purchase Obligations - Issues and the Way Ahead 8. FINANCING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - Introduction - Sources of Finance - Clean Development Mechanism - Key Investor Concerns - Summing up SECTION B - SOLAR PV 9. TECHNOLOGY OVERVIEW . . . . . . . . . . . . . . . . . . . . . - Introduction - Key Technology Solutions - Domestic Manufacturing Capacity - Market Structure - Cost Economics - Issues and the Way Forward 10. EXISTING SOLAR PV PROJECTS . . . . . . . . . . . . . . . . - Introduction - North Delhi Power Limited

www.indiainfrastructure.com India Infrastructure Research

Table of Contents (Release date: April 21, 2011. Number of pages: 316)

SOLAR POWER IN INDIA 2011

- Tamil Nadu Energy Development Agency - Karnataka Power Corporation Limited (Kolar Project) - Karnataka Power Corporation Limited (Belgaum Project) - Maharashtra State Power Generation Corporation - Azure Power India Private Limited - West Bengal Green Energy Development Corporation 11. UPCOMING SOLAR PV PROJECTS . . . . . . . . . . . . . . . - Introduction - JNNSM Migration Projects - JNNSM Grid Connected Projects - Upcoming Projects Under Respective State Policies 12. OFF-GRID MARKET . . . . . . . . . . . . . . . . . . . . . . . . . . - Introduction - Growth Drivers - Market Size and Growth - Key Players - Case Studies - Future Outlook 13. SOLAR APPLICATIONS IN TELECOM . . . . . . . . . . . . . - Introduction - Energy Needs of Telecom Sector - Solar Energy in Telecom - Experience So Far - Market Outlook 14. GLOBAL EXPERIENCE . . . . . . . . . . . . . . . . . . . . . . . . . - Introduction - Installed Capacity - Major Markets - Policy Experience - Key Trends - Conclusion 15. COMPANY PROFILES . . . . . . . . . . . . . . . . . . . . . . . . . - Introduction - Adani Power Limited - Astonfield Renewable Resources - Azure Power

- Indosolar Limited - Lanco Solar - Maharishi Solar Technology Private Limited - Moser Baer Photo Voltaic Limited - Photon Energy Systems - Solar Semiconductors - Sunedison Energy India - Tata BP Solar - Titan Energy - Websol Energy Systems SECTION C - CSP/SOLAR THERMAL 16. TECHNOLOGY OVERVIEW . . . . . . . . . . . . . . . . . . . . . - Introduction - Key Technology Solutions - Market Structure - Cost Economics - Issues and the Way Forward 17. CONCENTRATING SOLAR POWER PROJECTS . . . . . . - Introduction - JNNSM Grid-connected Projects - JNNSM Projects under Migration Scheme - Projects under Gujarat Solar Policy 2009 18. GLOBAL SCENARIO . . . . . . . . . . . . . . . . . . . . . . . . . . - Introduction - CSP Capacity and Major Markets - Policy Experience - Key Trends - Issues and Challenges 19. COMPANY PROFILES . . . . . . . . . . . . . . . . . . . . . . . . . - Introduction - Abengoa Solar - Acme Tele Power Limited - Dalmia Solar Power Limited - Entegra Limited 20. APPENDIX . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.indiainfrastructure.com www.indiainfrastructure.com

List of Tables

SOLAR POWER IN INDIA 2011

Primary Energy Consumption in India Government's Estimates of Potential and Achievement in Gridconnected Renewable Power Cumulative Achievement in Off-grid Distributed Renewable Power Installed Capacity of Decentralised Renewable Energy Systems Installed Wind Power Capacity as of February 2011 Biomass/Bagasse Cogeneration Capacity as of February 2011 Categories in Small Hydro Power State-wise Potential and Achievement in Small Hydro Power Physical Targets for Key Renewable Sources State-wise Existing Utility Scale Solar Capacity Snapshot of Upcoming Grid-connected Solar Power Capacities across States Summary of Solar Power Policies in Select States Leading in Solar Power Capacity Expansion Underway by Select Solar PV Manufacturers Key Policy and Regulatory Developments during 2010-11 Tariffs Realised in NVVN's Bidding Process Growth in Grid-connected and Off-grid Solar Power Capacity during 2010-11 Installed Renewable Capacity in India Achievements in Decentralised Solar Energy in India Indicative List of State-wise Installed Capacity of Grid-connected Photovoltaic Projects Plan-wise Capacity Addition in Grid-connected Solar Power Status of Key Off-grid Solar Power Applications State-wise Distribution of JNNSM's Off-grid Solar Projects Grid-connected Capacity Selected or Approved under State Policies JNNSM Targets Salient Features of Guidelines for Selection of Grid-connected Projects Bid Bond Based on Discounts Offered on CERC Tariff Capacity Limits for Rooftop Solar Projects Average Discounts Offered by Developers in NVVN's Bidding Process Range of Discounts Offered in NVVN's Bidding Process Company-wise Discount Offered by Selected Solar PV Companies Company-wise Discount Offered by Solar Thermal Project Developers Levellised Tariff (in Rs per unit) for PV Projects under Varying Capital Costs and RoE Assumptions State-wise Capacity Selected under JNNSM List of Solar PV Projects Selected under JNNSM Phase I (Batch I)

List of Solar Thermal Projects Selected under JNNSM Phase I List of Projects Qualified for Migration to JNNSM State-wise Capacity Selected under IREDA's Rooftop Scheme State-wise Capacity Selected under MNRE's Off-grid Scheme CERC Regulations and their Impact on the Solar Power Sector Floor and Forbearance Prices for RECs Technology Parameters in Solar Power for Fiscal Year 2011-12 Levellised Tariff determined by CERC for Solar Projects Levellised Tariff determined by CERC for Solar Projects State-wise RPOs (per cent) Solar Tariff set by Different State Electricity Regulatory Commissions Tariff for Solar Power Projects in Gujarat PPAs Signed under Phase I of Gujarat Solar Power Policy, 2009 Capacity under Phase II of Gujarat Solar Power Policy, 2009 Completion Schedule of Projects under Draft Rajasthan Solar Policy, 2010 State-wise Solar Tariffs and RPOs Key Investments by IFC in Solar Power Projects/Companies during 2010 Key PE Deals in Indian Solar Industry during 2010 Budgetary Allocations to MNRE and IREDA from 2006-07 to 201112 (Rs million) Budgetary Allocation to Various Programmes under MNRE for 201112 (in Rs million) IREDA's Sanctions for Solar Projects (Rs million) IREDA's Disbursements for Solar Projects (Rs million) Efficiency in Different Photovoltaic Technology Modules Worldwide Highest Solar Cell Efficiencies (India) Domestic Module Manufacturing Capacity across Select Major Players Solar Cell Manufacturing Capacity across Select Players Breakup of Capital Costs in Solar PV Projects Trends in Solar Module Prices Worldwide PV Cost Goals towards 2022 Existing Utility Scale Solar Projects in India Select Solar Rooftop Projects in India Brief Status of Upcoming Solar PV Projects under JNNSM's Migration Scheme Status of Upcoming Grid-connected Solar PV Projects under JNNSM Phase 1 Central Financial Assistance for Off-grid Applications List of Off-grid Projects Sanctioned under JNNSM Trend in Off-grid Solar Applications

www.indiainfrastructure.com India Infrastructure Research

List of Tables

SOLAR POWER IN INDIA 2011

Physical Progress of Rural Village Electrification List of Key Players in Solar Lighting Systems and Water Heater Markets Region-wise Distribution of Solar Lighting System Manufacturers Region-wise Distribution of Solar Water Heater Manufacturers Box-type Solar Cooker Manufacturers Power Requirements of a Cell Site Constitution of Energy Bill (Per Month) Power Availability of Tower Sites Trends in Global PV Revenues Regional Distribution Of Installed PV Capacity in 2009 vis--vis 2004 Country-wise Share in Global PV Capacity Addition during 2009 Market Shares of Top 15 Solar PV Manufacturers in 2009 Average Prices of Crystalline Silicon Modules in Major Markets during 2005 to 2009 Installed Production Capacities of Major PV Manufacturers in 2009 Adani Power's Financial Performance Indosolar's Financial Performance Lanco Solar's Ongoing Projects under Various Policies Lanco Infratech's Key Financials Moser Baer Photo Voltaic Limited's Operational Performance Moser Baer Photo Voltaic Limited's Financial Performance Photon Energy Systems Limited's Operational Performance Tata BP Solar's Operational Performance Annual Financial Results of Websol Energy Systems Websol's Quarterly Financial Results for 2010-11 Projected Technology Milestones in Concentrating Solar Power Comparison of Concentrating Solar Power Technologies Key Players in CSP Value Chain Upcoming Solar Thermal Power Projects in India Brief Status of Other Upcoming Solar Thermal Projects under JNNSM's Phase I Status of CSP Projects by Technology CSP Installed capacity: Technology-wise Country-wise CSP Projects under Construction Capacity-wise Analysis of Operational and Upcoming CSP Projects Capacity-wise Analysis of Planned CSP Projects Abengoa's Operational Project Portfolio Abengoa's Upcoming Project Portfolio Key Financials of Dalmia Cements during 2009-10 (Rs million) Entegra Limited's Key Financials as of 2009-10 (Rs million)

LIST OF FIGURES
Distribution of India's Primary Energy Consumption Trends in Grid-connected Renewable Energy Capacity Utility Scale Solar Power Capacity by State Solar Direct Normal Irradiance in India Solar Water Heating Collector Area Production Value Chain in Solar PV Technology Value Chain in Concentrating Solar Power Technology Capacity Awarded in First Phase of JNNSM Projected Grid-connected Solar Capacity State-wise Distribution of JNNSM's Rooftop Solar Projects Production Value Chain in Solar Photovoltaic Year-wise Growth of Solar Water Heating Capacity Distribution of Solar Water Heaters across Various Segments Break-up of Network Operating Costs of Operators Break-up of Operational Cost of Towers Power and Fuel Cost per Site per Month by Tenancy Growth in Global Cumulative Installed Solar PV Capacity up to 2009 Growth in Global PV Capacity Addition by Application Key Applications of Solar PV Systems Worldwide Growth in Annual Solar PV Cell Production Regional Distribution of Solar PV Production in 2009 Module Pricing Trends (for module sizes up to 125 W) in 2010-11 Market Share of Large-scale PV plants in Cumulative Global Installed PV Capacity Projected Market Production Shares of Crystalline Silicon and Thin Film Technology by 2014 Value Chain in Concentrating Solar Power Technology Solar Thermal Project Cost Trends (estimated by CERC) for Existing/Upcoming International Installations Cost Structure in a 50 MW Parabolic Trough Plant with 7-hour Storage Cost Structure for Solar Power Towers Country-wise CSP Installed Capacity (MW) Technology-wise CSP Projects under Construction (MW) Global CSP Planned Capacity (MW)

www.indiainfrastructure.com www.indiainfrastructure.com

ORDER FORM

I would like to purchase the Solar Power in India 2011 report for Rs 40,000 I am enclosing a cheque/demand draft for Rs _____________ vide cheque/demand draft no.___________________ drawn on ________________________________________________________ dated ________________ in favour of "India Infrastructure Publishing Pvt. Ltd.".

Signature

Name (Block Letters) Designation Company Mailing Address

Telephone Fax E-mail Payment Options Wire transfer details Beneficiary Bank Name Address Account No. Swift Code IFSC Code Contact Details Jaya Assistant Manager, Information Products India Infrastructure Publishing Pvt. Ltd. B-17, Qutab Institutional Area. New Delhi - 110 016. India Tel: +91 11 46560418, 41034600, 41034601 Mobile: +91 9899373354 Fax: +91 11 2653 1196 jaya@indiainfrastructure.com

Mobile

: : : : : :

India Infrastructure Publishing Pvt. Ltd. The Royal Bank of Scotland N.V. M-6, Hauz Khas, New Delhi 110016, India 1050338 ABNAINBBDEL ABNA0100327

To buy online please visit www.indiainfrastructure.com

You might also like