You are on page 1of 3

MECHANICAL COMMISSIONING STATION: NTPC-RAMAGUNDAM SYSTEM : PLANT ITEM : :PNEUMATICALLY ACTUATED VALVE REF : SHEET 1 OF 3 1 X 500 MW UNIT :7

LOCATION:

PLANT NOMENCLATURE: _________________________________________________ MANUFACTURER ___________________ SERIAL NO. __________________________ LOCATION: _______________________________________________________________ NO. ACTIVITY STATUS (YES/NO) REMARKS

1.

General conditions satisfy the site Standing Instructions as listed in the Plant Item Commissioning Essential Prerequisites (SCL MS 1/1). The Name Plate legend agrees with the approved NTPC Plant Nomenclature is clearly visible, securely fixed, is durable and correlates with remote labels. Installation is correct and complete to latest drawings. Direction of flow marked and correct. Access adequate for adjustment, maintenance and repairs. Valve gland and packing suitable and satisfactory. Lubrication of valve and Actuator Suitable and sutisfactory.

2.

3. 4. 5. 6. 7.

NAME MECH.ERECT. NTPC ELECT.ERECT. COMMNG. C&I BHEL ERECT. COMMNG.

SIGNATURE

DATE

CONTRACTOR

MECHANICAL COMMISSIONING STATION: NTPC-RAMAGUNDAM SYSTEM : PLANT ITEM : :PNEUMATICALLY ACTUATED VALVE REF : NO. ACTIVITY SHEET 2 OF 3 STATUS REMARKS (YES/NO0 1 X 500 MW UNIT :7

LOCATION:

8.

Freedom of operation, fully open to fully closed. Manually operate and physically check if possible. Position indicator visible and indicating correctly. Limited switches mounted securely and set correctly. Remote operating mechanism or extended valve spindly is securely installed and operates correctly. Adoquate clearance to wall/steel work around handwheel and actuator for operation. Actuator isclating facility operable. Leave isolated. Power air supply and control signal modium available and isclated. Adequate mechanical stops fitted to prevent overtravel on open or close operation.

9. 10. 11.

12.

13. 14.

15.

NAME MECH.ERECT. NTPC ELECT.ERECT. COMMNG. C&I BHEL ERECT. COMMNG.

SIGNATURE

DATE

CONTRACTOR

MECHANICAL COMMISSIONING STATION: NTPC-RAMAGUNDAM SYSTEM : PLANT ITEM : :PNEUMATICALLY ACTUATED VALVE REF : NO. ACTIVITY SHEET 3 OF 3 STATUS REMARKS (YES/NO) 1 X 500 MW UNIT :7

LOCATION:

16.

Connect actuator isolator. Establish power air and control signal medium supplies. Drain or blowout airlines and reconnect.

17.

Operate actuator and valve on opening, closing and, if applicable, partial operation, in response to control signal. Operate 6 times or more. Check that air leasage if any is acceptable at all valve positions. Valve reverts to pre-determined position when power air supply fails. When control signal supply fails the valve remains in presont position or reverts to the pro-determined position as specified. Leave valve in closes position

18.

19.

20.

NAME MECH.ERECT. NTPC ELECT.ERECT. COMMNG. C&I BHEL ERECT. COMMNG.

SIGNATURE

DATE

CONTRACTOR

You might also like