You are on page 1of 5

BSS 512- COSTING AND ESTIMATING 1 AP229 3B

Table of content
no 1 2 3 content acknowledgement literature review introduction page 2 3 5

BSS 512- COSTING AND ESTIMATING 1 AP229 3B

ACKNOWLEDGEMENT
Alhamdulillah, praise to Allah because of His bless, we can finish our report successfully. Special thanks to our beloved lecturer, Dr. Salisma Binti because of her patient and dedication in spreading her knowledge and experiences in BSS 518 Costing & Estimating 1. We really appreciate and thankful to your cares and responsibility in teaching and give us lectures as well as advices that really help in our live. We found that this course really tough at the beginning, slowly we learn it to gain our knowledge and our aim in this campus.

Unforgettable, special thanks and loves to our beloved parents and family who were always by our side and became a main factor for us study harder and harder to achieve a good result and be a good child to them. Without them, we were no body and not existence in this beautiful world. They are our life, they are our truly love before All The Almighty. No one can replace them. When we were down, they always give us advices and make us smile. When we were happy, they become the happiest person this world. There are no words can describe how much their love towards us. Only All The Almighty know their sacrifices in raising up a child.

Thankful to our fellow friend who were involved directly or non directly in this process of report. They were always support and give some advices to improve our report make it more info and tersusun. Your helped and ideas really awesome. We appreciate it.

Thank you.

BSS 512- COSTING AND ESTIMATING 1 AP229 3B

INTRODUCTION
Costing and Estimating 1- BSS 518 is a course which provide student dealing with measurement, theory and estimating base on construction, drawing and also rate of prices in construction material and labour. More than that, this coursework aims to provide study on the pre contract and post contract stage of development process which has been teach in last semester teaching plan in cost studies. In another way, this course will provide student with knowledge in the development and who were involved related to this course.

Other, this coursework provide the understanding of the theory part such as feasibility study. It also provides the practice in the development stage which dealing the measurement and estimating for the work process and construction process as well as the selected materials.

In another hand, it also provides the student with a thorough understanding on the important factors to be taken during design stage of the project. For an example the selection of material must be suitable for the project and knowing the overall costing of the project to ensure the project will not be over budget. It also should fulfil the requirements and specifications have been mentions in the contract of document.

BSS 512- COSTING AND ESTIMATING 1 AP229 3B

OBJECTIVES

1) Understand the principles and application of detailed specifications.

2) Provides a thorough understanding on the important of specification and bill of quantities.

BSS 512- COSTING AND ESTIMATING 1 AP229 3B

LITERATURE REVIEW

Bill of quantities is a

You might also like