You are on page 1of 6

SKILL & PROJECT SUMMARY

6.8 years of learning 4 years of managerial experience as project Coordinator, Project Manager, and project Head. 1.5 years of experience in retail & Marketing 2 years of experience in Food Safety Management as Management Representative Had course on Project Management, Production & Operation Management Rice Milling Training at Buhler India Ltd On job training of Rice variety identification and Quality, at KRBL Ltd, Ghaziabad Practical experience of MS Project, Auto Cad, Pro E, Windows XP, M S Office. Smart work with convincing, problem-solving, self-initiated resourceful and committed. Able to coordinate and communicate with Large production Team and project team Fluency in English Typing speed of 40 wpm

Professional Qualifications:
KRBL Ltd: (2007-2010) KRBL one of the largest Basmati Rice exporter (11 times APEDA Golden Trophy) and with Le livre Guinness des records for worlds biggest kabsa, Bahrain in 2002, stand Indias first integrated Rice company. KRBL provided the opportunity to exercise 1. Contract Farming and Extension activities 2. Seed Distribution 3. Preharvest & Post Harvest Seminars 4. Undertaking Quality Analysis 5. Supervision of Rice Production Plant (300 Mt/day) 6. Final Quality Inspection 7. Technical Assistance and Training 8. Interaction & Guidance to farmers 9. Direct Crop Purchase 10.Storage activities 11.Pest control activities 12.Parboiling, Drying, Dehusking and Milling activities 13.Polishing Grading & Sorting and Packing 14.3.5 MW cogeneration 15.Implementation of HACCP, ISO, BRC,SQF, ISO:22000 FSMS 16.Research & Development of Rice Milling & Parboiling Processes 17.Supplier audits to keep track of project schedule

Bush Foods P Ltd (2010-till date) Bush Foods have been awarded UDC Global Business Awards "Asia Best Food Product of the Year 2011". With a turnover of US $ 170 Million and Production capacity of approximately 600 MT bush Foods Stands among the leaders in the Basmati Export. With a customer base of West mill Foods (UK), Loblaw Group, Costco Super Market, Metro Super Markets (Canada), Sobeys (Canada), BJs Club Bush Foods allowed to exercise 1. Predictive & Pro-active Maintenance (Machine breakdown time reduced) 2. GMP, Lean, poka-yoke, TPM, 5S, SA8000 (Plant efficiency improved 7%) 3. Project Management Activities (8 Erection Projects in 1 year) 4. Production & Operation Management of Rice milling (600 MT/day), Parboiling (240 Mt/day) Packing (100 Mt/day), Project, Maintenance and Electrical Departments 5. Plan, Direct, Monitor, audit and Report daily activities 6. Strategically implement Plant Allocation as per production invoice and monitor progress 7. Production Yield analysis (Broken Saved 2%) 8. Maintenance Scheduling implementation 9. Strategic cost control (15% saved by grader adjustments) 10.Manage and Audit Production & Technical Manpower 11.Conduct training regarding Production, maintenance, Food safety 12.Rice Milling innovations and BPR activities (Ageing of Rice with Kilburn Engineering) 13.Work efficiency improvement by time-motion study 14.Machinery Purchases, inventory of Control spares & consumables 15.Strategic supervision and auditing of Engineering staff of 100 (Employee of the month Award implemented) 16.Developing vendors for procurement of Engineering components 17.Coordinating Dispatch activities in meeting daily targets (Appreciated by CMD for Highest Dispatch of the month) 18.Control in process quality of Product

Project Summery
Project Time Span Technologie s Role Installation of FFS Plant (90 Mt/Day)-Bush Foods Overseas P Ltd, Sonipat
Dec 2011 March 2012

Nichrome Form Fill Seal Machine (90 Mt/day), Techno four Metal Detector Project Head

Proposal with comparative statements, supplier negotiations. Monitor Erection & commissioning of the Packing unit Preparing of Project Plan, Engineering drawings, Resource arrangement. Team coordination. Preparation of Schedule. Conducting Construction Quality Audit, monitoring and corrective actions Identification and removal of bottlenecks Monitoring overall commissioning schedule and independent assessment Installation of Rice Packing Unit (100 Mt/Day)-Bush Foods Overseas P Ltd, Sonipat

Project

Jan 2012 March 2012 Time Span Technologie ATC Rice Grading & Packing Plant (100 Mt/day) s Role Project Head Monitor Erection & commissioning of the Packing unit, supplier negotiations. Preparing of Project Plan, Engineering drawings, Resource arrangement. Team coordination. Preparation of Schedule. Conducting Construction Quality Audit, monitoring and corrective actions Identification and removal of bottlenecks Monitoring overall erection & commissioning schedule and independent assessment Pre-commissioning and commissioning procedures and support

Project

Installation of Rice Milling Unit (100 Mt/Day)-Bush Foods Overseas P Ltd, Sonipat

Dec 2011 March 2012 Time Span Technologie Buhler Rice Milling Plant (100 Mt/day) s Role Project Head Erection & commissioning of the Milling unit, supplier negotiations. Preparing of plant layout and drawings, Resource arrangement. Team coordination. Preparation of Schedule, its monitoring & reporting. Vendor follow-ups.

Project Time Span Technologie s Role

Installation of Rice Milling & INDUSS Parboiling Unit (160 Mt/Day)-Bush Foods Overseas P Ltd, Sonipat
August 2010 Sept 2011

Buhler Rice Milling Plant (160 Mt/day), Indus Parboiling Plant and Dryers (150 Mt/day), Kilburn FBD (400 MT/day) Project Head

Erection & commissioning of the Dehusking and parboiling unit, preparation of Gantt charts and supplier negotiations. Preparing of plant layout and drawings. Costing of Project and Resource arrangement. Project team coordination. Preparation of project Schedule, its monitoring & reporting. Vendor audits to meet the dead lines. GSI Bulk Grain Storage & Handling(10000 Mt )-Bush Foods Overseas P Ltd Project May 2011 till now Time Span Technologie GSI bulk grain silo 2500 Mt x4, Cleaning and conveying System, HSF s Dryers Role Project Head Preparation of proposal, Calling of quotations, Preparation of Project schedule, resource arrangement, monitoring of regular proceedings, Engineering solutions, Costing, verification of project objectives timely basis Automation of Production Plant (5 Mt/hr) -Bush Foods Overseas P Ltd Project August 2010 March 2011 Time Span Technologie Schneider SCADA System, PLC Control, Software and hardware systems s Role Project Lead Proposal, Costing, negotiations, Process Layout and synchronization sequencing, Resource arrangement, reviewing of process growth, deadline monitoring and regular analysis, scheduling Glucose Production Plant (20 Mt/day)- KRBL Ltd, Ghaziabad Project March 2009 April 2010 Time Span Technologie Hydraulic Filter Press, Fermentation Unit, Stem Jet Cooker, Condensation s Unit, Heat Exchangers, Hammer Mill Role Project Manager Proposal, Costing, Engineering, Drawings and Layouts, Routings of the Pipeline, Team Management, Scheduling, Resource Coordination, Erection & Commissioning, Vendor Communications, Vendor audits for meeting the Deadlines, Project reviews, Progress Reporting Rice Production Plant (300 Mt/day) - KRBL Ltd, Ghaziabad Project March 2008 - March 2009 Time Span Technologie Buhler Rice Milling Plant, Carter day length graders, Satake Polisors, Color s Sorter Machines Role Project Manager Erection & commissioning of the Dehusking unit, preparation of Gantt charts and supplier dealings, Verification of plant layout and drawings, Costing of Project and Resource arrangement including machine receipt, Project team coordination. Preparation of project Schedule and its monitoring and control. Vendor audits to meet the dead lines, Team Management, Regular reviews

Packing Plant (600 Mt/day) - KRBL Ltd, Ghaziabad Project August 2009 - February 2010 Time Span Technologie Lee pack PFS Machine, Hassia FFS, Kirby PFB s Role Project Manager Layout Drawings, Civil construction, Erection and commissioning of Plant, Scheduling, monitoring, team management, schedule verification Vapor Absorption Machine Project- KRBL Ltd, Ghaziabad Project Time Span Jan 2010 - April 2010 Vapor absorption Refrigeration System, Cooling Tower, Chilling line, Blowers Technologie s Role Project Manager Supervision of Contractual Work, Commissioning of Plant, Routing of Chilling line, Scheduling, reviews of the contractual work, regular progress reporting and monitoring Road Safety System- KRBL Ltd, Ghaziabad Project Time Span March 2010 July 2010 Technologie Road Safety System s Role Project Coordinator Supervision of Contractual Work, Commissioning of Delineators, Routing of Chilling line, Project Scheduling, progress reviews of the contractual work, Monitoring of regular progress and reporting Fire Safety System- KRBL Ltd, Ghaziabad Project Time Span October 2009 Jan 2010 Technologie Hydrants, High Pressure water line, Ash Silica Filter s Role Project Coordinator Fire safety analysis, Proposal, Design of layout, Costing, vendor detailing, Plant layout and pipe routing Erection and commissioning of pressure line Rice Parboiling - KRBL Ltd, Ghaziabad Project Time Span November 2008 Sept 2009 Technologie Dryer, Plate Heat Exchangers, Steam Boiler s Role R & D Engineer Trial and testing of minimal soaking time to reduce the parboiling time for rice by 6 hrs, commercial application of developed method, monitoring the results and handover to the production unit

Rice Ageing - KRBL Ltd, Ghaziabad Project Time Span Sept 2007- Sept 2008 Technologie Rice Ageing, Glazing Cylinder, Hot Air Oven, Boiler, s Role R & D Engineer Trial and testing of minimal Ageing time to reduce the Rice Ageing time for rice 3 hrs, commercial application of developed method, monitoring the results and handover to the production unit Project Reengineering of Flour Milling Plant (100 Mt/Day)- Flour Tech Engineers (Naga Mills, Chennai

May 2007 August 2007 Time Span Technologie Buhler Flour Milling Plant (100 Mt/day) s Role Erection Engineer Preparing day to day activity plan of erection and commissioning and follow up with contractor. Material & man power requirement planning as per schedule. Preparation of Daily progress report of Erection, Testing & Commissioning. Organize daily progress meeting with in order to follow up of daily progress of Erection, Testing & Commissioning. Monitoring Site installation activities and dealing with technical issues. Preparation and follow up of Non Conformance Report. Owner for Inspection of equipment before hand over. Supervision of Erection Activities. Preparation and follow up of Warranty Defect Notification Sheet.

You might also like