CONTENT
IntroductiontoEarnedValue ApplyingEarnedValueManagement Experiences
Specialtopic:EarnedSchedule
23/06/2009
EV
FORECAST
PMBOKGuide,FourthEdition
VARIANCE ANALYSIS ScheduleVariance=SV=EV PV<0=delay>0=ahead SchedulePerformanceIndex=SPI=EV/PV<1=delay>1=ahead S h d l P f I d SPI EV / PV <1 d l >1 h d Appliedontothecriticalpath ???
FORECAST
23/06/2009
EV
23/06/2009
EV
SV
200 300 400 400 500 600 1.00 0.95 0.90 0.85
SPI
0.80 0 5 0.75 0.70 23/06/2009 EV 5
Provides foundation for further development of and research intended to result in Earned Schedule acceptance as a valid extension to EV
23/06/2009 EV 6
PV
SV EV
time AD ES SV(t) PD
23/06/2009
EV
23/06/2009
EV
1.000 200 1.500 300 2 000 2.000 400 2.500 500 SV SV(t)
3.000
600
3.500
23/06/2009
EV
23/06/2009
EV
10
AD ES PD PD/SPI / PD/SPI(t)
23/06/2009
EV
11
23/06/2009
EV
12
ESResearch ES Research
Emperical evidence:
Vandevoorde St., Vanhoucke M., International Journal of Project Management, May 2006 A Comparison of different project duration forecasting methods using p p j g g earned value metrics
State of the Art Report on Forecasting Duration Methods Earned Schedule provide schedule metrics which behave correctly during the whole project life Earned Schedule forecasting is more reliable, and usefull to sanity check schedule expectations
23/06/2009
EV
13
ESResearch ES Research
Academical Research:
Funded by PMI Belgium & FWO, Vlaanderen
Vanhoucke M., Vandevoorde St., Journal of the Operational Research Society, October 2007 A simulation and evaluation of earned value metrics to forecast the project duration
IPMA Research Award 22nd World Congress Rome Earned Schedule is the better performer for forecasting
23/06/2009 EV 14
ESResearch ES Research
23/06/2009
EV
15
ESResearch ES Research
23/06/2009
EV
16
Information
A Belgian Research Effort
23/06/2009
EV
17