Installation of Pipeline End Manifold (PLEM) and Subsea Tie-In of Expansion Spools
Zamri B Ahmad
Petroleum Management (PMU), PETRONAS
2011 PETROLIAM NASIONAL BERHAD (PETRONAS) All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
OUTLINE
Introduction Installation Preliminaries Installation Procedure Conclusion
INTRODUCTION Background Information Scope of Presentation INSTALLATION PRELIMINARIES Pipeline End Manifold (PLEM) Expansion Spools Installation Barge Final Assembly INSTALLATION PROCEDURE Pipeline End Manifold (PLEM) Expansion Spools Final Assembly CONCLUSION
Pipeline End Manifold (PLEM): commonly used for subsea manifold to tie-in of underwater pipelines. used to comingle 2 or more pipelines together and eliminate the need for additional risers.
Installation of PLEM and expansion spools: require great precision sensitive to weather conditions high installation cost
1. 2.
MOPU 2
Introduction
Installation Procedure
Conclusion
Introduction
Installation Procedure
Conclusion
Introduction
Installation Procedure
Conclusion
Introduction
Installation Procedure
Conclusion
10
Introduction
Installation Procedure
Conclusion
DP DLB Lewek Champion 358 person accommodation 1 x 800MT main crane 2 x 30MT secondary crane Dynamic Positioning with 6 Azimuth thrusters (max thrust 378.7kN)
11
Expansion spool
PLEM
Pre-installation:
USBL beacons
PLEM
13
Stage 1
Stage 2
Stage 3
16
Pipeline on an A Frame
Stage 1
Stage 2
Stage 3
19
SPOOL
PLEM
+/- 300mm
21
22
Expansion spool
PLEM
CONCLUSION:
Introduction Installation Preliminaries Installation Procedure Conclusion
Similar approach is used for deepwater installation. However, the challenges are greater. Due to the depth; human divers are out of bound. Thus extensive use of ROVs high-accuracy beacons are needed for positioning. DP vessel are required as apposed to anchor handling.