Cognizant 20-20 Insights

Oil and Gas IT Game Plan


How to survive and thrive mergers and acquisitions, divestitures and separation.
Introduction
The challenges and opportunities arising in the oil and gas industry including elasticity in the cost of crude, increased competition, new and unconventional shale gas discoveries and a stringent regulatory environment are forcing companies to merge, invest, divest and swap assets. By realizing that exploration/production and refining/marketing are different businesses that need specific skills and shareholder alignment, companies are now able to chart a course to become stand-alone entities with clear, separate operations. Moreover, the recent discoveries of unconventional shale oil plays and their transformation to major crude oil production centers have led major O&G corporations to acquire assets and merge smaller players to exploit these reserves. These market dynamics have encouraged leading integrated O&G companies to follow a two-fold strategy: This paper discusses our view of the typical challenges faced by IT groups during merger, acquisition, divestiture and separation (MAD&S) scenarios and the best practices to overcome those challenges.

Challenges Faced in the MAD&S Landscape


For the oil and gas industry, the IT issues arising from mergers, acquisitions, divestitures and separations can be immensely complex. Companies within the sector are more vertically integrated and have longer value chains than companies in other industries. Based on our experience working on large-scale programs with O&G clients, some of the key challenges for the IT organization in the MAD&S space are:

More closely align operations to the market and free up shareholder value via a split in their upstream and downstream operations. Acquire the assets of or merge with smaller players that have interests in unconventional sources and upstream assets.

Program management Application and data management Testing and validation TSA and vendor contracts Organization and change management Infrastructure

cognizant 20-20 insights | april 2012

MAD&S Challenges
Impact on business process as part of divestiture and identication of process hand-offs. Incomplete understanding of data requirements and data transformation needs. Segmenting and management of as-is Poor senior executive applications vs. applications that require engagement and/or alignment modications. through the separation phase. Meeting short-term application Lack of rigorous separation and execution needs while transforming Lack of TSA and SLA rigor and formality due to false plans considering Day 1 through Day 3. applications for future state. comfort in same parent relationship between parties. Absence of a dedicated transition/ Application Underestimation of time and effort required to review and program team to drive delivery. & Data renegotiate new contracts. Signicant distraction from BAU activities Absence of strong project management overseeing the and resulting lack of focus on customer. contract separation process critical for Day 1. Weak governance and controls to ensure Poor approach to categorization and visibility and accountability across the program. prioritization of vendor contracts. MAD&S

r ndo Ve and cts As tra TS Co n

Ma Progr nag am em ent

Int Sepa egr rat atio ion n T or est ing

Insufficient focus on business readiness as initiatives near completion and transition to BAU. Unclear future-state design for the separated companies, including decisions regarding shared services. Absence of clear indicators to determine the success of the change management process. Lack of a thorough change management plan and approach. Weakly managed or poorly orchestrated communication strategy. High Complexity Medium Complexity

CHALLENGES

Lack of people bandwidth and knowledge management. Weakly managed communication, underutilization of assets and disruption of existing processes.

Maintaining data and system security. Complicated application and infrastructure environment, with Ineffective tool management and utilization poor understanding of critical aiding in the MAD&S activity. dependencies. New company data center set-up (sizing, capacity, contracts). Indecision regarding business and application changes and subsequent delays to hardware and software orders.

ion zat ani ge Org Chan

Infrastructure

Absence of end-to-end test data management and unpreparedness for the specic data requirements pertaining to MAD&S. Issues with testing infrastructure planning, management and deployment. Absence of a central governance model overlooking the testing for MAD&S activity.

&

Figure 1

Program Management
The success of MAD&S depends on proper planning, an effective program management office (PMO) and clean change management that straddles IT and business needs. In our view, key challenges in running a successful PMO are:

Lack of senior executive engagement throughout the separation/merger phase. Absence of a dedicated transition/integration team to drive delivery. Lack of rigorous separation and execution planning, coupled with diminished focus. Following the deal announcement, a lack of focus on keeping the current business running. Weakly managed/orchestrated communication.

Transparent review and reporting: Tracking the status of the program and providing a consolidated view of progress is of great importance during execution of MAD&S activity due to the complexities involved. Maintaining key management information from the board level down and reporting on key actions and decisions enable an open and consistent information flow within the organization and hence are imperative for successful operation of the program management function. Budget tracking: The scale of the MAD&S activity and the intricacies of the transactions make it necessary to ensure proper management, tracking and reporting of program finances and making certain that all projects remain within budget and that remedial actions are taken when budgets are under threat. Planning and tracking: A consistent approach to program planning and tracking provides a consolidated view of the program roadmap and enables full control over outcomes. Proactive risk and issue management: For any MAD&S activity, a speedy and robust mechanism for dealing with program-wide risk and issue planning is highly recommended for successful execution of the initiative.

Success Factors and Best Practices Governance & organization: First and foremost to IT program management success is a pragmatic and structured framework for driving decisions and providing strategic direction. Project/workstream owners need to be brought together to ensure that projects are properly set up and benefits are clearly articulated.

cognizant 20-20 insights

Dependency management: Proactive mitigation of the risks arising due to project delays can be achieved by identifying, tracking and managing cross-project and cross-workstream dependencies. Change control: A robust change control mechanism for tracking changes to project plans, estimating the impact and taking action not only minimizes delays to the program but also provides consistency in information and decision flow within the organization. Project assurance: Key issues of individual projects and common concern across the program can critically affect the progress of the program; hence, an independent challenge and assurance function that helps identify and resolve these issues is of paramount importance. Project standards: Ensuring adherence to standard approaches, tools and techniques to support project delivery not only provides great economies of scale in the long run but also provides certainty of quality outcomes at every step of the program. Benefits management: Value-to-business is the key driver behind any program. Hence, planning and tracking the delivery of benefits and results arising from the program and ensuring that the investment delivers the required return to the business is critical to the evaluation of such initiatives.

Communication and stakeholder management: With multiple stakeholders and more than one organizational entity involved in the MAD&S activity, consistent flow of information not only guarantees faster decision-making but also removes ambiguity of actions and outcomes. Implementation of a proper communication plan disciplines the engagement and management of stakeholder inputs to the program. Resource management: Availability of the right people at the right place and the right time is vital to a successful PMO. This is why an overall resource plan is needed that aligns the supply of resources and skills with the demands of the program. Vendor management: The involvement of multiple parties in the program with hand-offs at different milestones makes vendor management an integral facet. This is to ensure a rigor in the procurement and management of subcontracted third-party products and services and streamlined communication and engagement. Delivery: Iterative development ensures rapid delivery and risk minimization, as well as factor learning and improved re-usability.

Application and Data Management


MAD&S introduces many challenges with respect to migration of applications, data and functionality changes to incorporate the organizations goals (see Figure 2).

Data Management Challenges


Knowledge of the System
Understanding the data and the underlying business rules are proving to be the primary reasons for delays and the resulting escalating costs.

Short Turn-around Time


Typically, there is a need to freeze the data entry in the production system while separation is being performed; as a result, there is a need to minimize downtime as much as possible.

Managing Sensitive Data


Data separation activities may require movement of sensitive data. Security and legal requirements may prevent sharing of sensitive data with an oshore IT partner.

Data Separation Challenges


Ensuring Data Integrity

Multiplicity of Interfaces
This is the main challenge of an integrated separation effort. If n application systems must be directly interconnected, it will produce n*(n-1) connections, or interfaces.

There is a need to ensure data integrity, as the database schemas will change; business entities will change to portray different functional meaning; and the format and usage of data captured in the new system can be totally different.
Figure 2

cognizant 20-20 insights

Business vs. IT
Business Point of View Degree of business process shared between upstream and downstream companies Functional dependencies between the two entities Common roles (business and IT staffs performing job functions for both companies) Common customers
Figure 3

IT Point of View Shared infrastructure Shared applications Number of interfaces between applications Shared data between upstream and downstream business entities (i.e., enterprise BI)

Based on our experience with O&G clients, key challenges for application and data management include:

Success Factors and Best Practices There are four key steps to successful data management in a typical MAD&S scenario (see Figure 4):

Impact on business process as part of a split or merger and identification of process hand-offs. Segmenting and management of as-is applications vs. applications that require modifications (projects). Impact of data requirements and data transformation. Meeting short-term application needs while transforming applications for future state. Establishment of standards through a homogeneous representation of data across various data sources.

Analysis and strategy for data separation Preparation Execution Stabilization

Key considerations for data management include: Source application availability and criticality Target application Process complexity involved Volume of data Data quality

Business and IT groups have different points of view for data separation complexity (see Figure 3).

Data Migration Framework


Assess & Profile Assessment study Source and target study and gap analysis Extensive data profiling Sensitive data masking and split Early detection and removal of redundancies Assured data quality Steps Involved Cleanse Identify and plug data inconsistencies Data quality checks Fill data gaps to enable data split Minimal data volumes Assured data quality Evolution of standards if none exist Data profiler Transform As-is and to-be mappings and templates Usage of migration tool Load & Verify Initial bulk load Validation of the migrated data Delta-load the spilled or missed data Assured load completeness

Benefits

Faster template-driven design Rapid script development Faster execution of one-time data migration tasks Code generator Code reviewer

Figure 4

Value Creators

Data profiler Data generator Metadata manager

Data comparator Data reconciler

cognizant 20-20 insights

Separation/Integration Testing
MAD&S requirements introduce the need for considerable changes in applications (multiple small projects) and thus the requirement for testing various components/applications of the entire IT portfolio. The different types of testing involved in typical MAD&S scenarios include:

Success Factors and Best Practices The key to address the above challenges lies in the following best practices:

Building a scalable testing model to cater to the needs of separation or integration testing built on goals, KPIs and metrics to determine the progress and health of the program. Implementation of consistent and repeatable testing processes. Identifying structured methods to determine the amount of testing. Adoption of solution accelerators and techniques to streamline and enhance the testing process. Implementation of tools and infrastructure to provide greater business value while significantly reducing the time and effort involved, as well as the amount of manual errors.

Business scenario/process end-to-end testing, including integration with non-SAP applications. Functional testing of core ERP transactions. Testing of interfaces between ERP and other applications. Security/role-based testing. Break-point testing. Supporting user/business acceptance testing. Automation assessment, recommendation, development and execution. Performance testing. Data conversion testing.

Figure 6 illustrates a core-flex resourcing model, along with the various critical elements to address the separation/integration testing scenario.

In our view, the typical challenges in separation/ integration testing are around the six components of people, process, governance model, infrastructure, data and tools (see Figure 5).

TSA and Vendor Contracts


The IT organization faces multiple challenges in building Transition Service Agreements (TSA) and

Testing Challenges
People
Availability of SMEs and over-allocation of business users. Flight of knowledge risk. Scales of economy not exploited. Possibility of disruption of existing processes due to organizational/BU reprioritization. Variation in test coverage and risk prioritizations. Unidentified and unutilized accelerators and best practices. Weakly managed /orchestrated communication. Absence of a centralized testing body. Lack of single ownership and accountability due to BAs and developers focus on separation-related activities. Downtime of test environments. Constant struggle to get infrastructure teams attention on a priority basis for non-production environments. Capacity planning issues when it comes to multiple test environments. Lack of planning separation-specific test requirements around infrastructure. Unavailability of test data. Absence of data migration/validation tools. Unpreparedness for separation-specific test requirements (data migration). Lack of interactive and effective medium for sharing and collaboration. Absence of an integrated 24x7 testing delivery dashboard/analytics. Absence of regression/risk-based testing tools that can accelerate rate of testing. Lack of on-demand ad hoc automation tools/utilities to expedite testing process. Unavailability of updated test scripts for less frequently used applications.

Process

Governance Model

Infrastructure

Data

Tools

Figure 5

cognizant 20-20 insights

Core-Flex Resourcing Model


Core-Flex Staffing Model
Test analysts Package experts Test manager and functional consultant Automation/ performance Integration, automation and functional testing teams

Lower costs and faster time-to-market through optimized utilization of offshore resources. Dedicated team builds expertise over time.

Ramp-up (with an induction program) Cognizant Resource Pool

Cognizant Flex Team Ramp-down

Inputs

PApplication PProduct PIntegrating systems PRequirements specifications PHardware/software needs PEnvironment set-up details

>
Cognizant Core Team Knowledge Repository Common Tools & Infrastructure Reduced effort through reuse
of common frameworks, templates and data repositories Maximize test automation Optimize tool licensing requirements

>

Outputs

P Test process models P Benchmarks P End-of-test reports P Metrics reports P Causal Analysis & Report P Learning (CARL)

Central Repository Build and retain knowledge


leveraging the central repository Institutionalize knowledge Better regression test coverage Efficient knowledge transfer

Standard Processes Higher system quality Better planning and estimation Rigorous metrics collection Continuous process improvement

Figure 6

contracts during MAD&S scenarios. Based on our experience, the key challenges faced include:

Determine criticality of the contract and estimate time to complete necessary actions. Identify appropriate negotiations structure (owner rep, user rep, etc.) and decision-makers for each contract. Determine roles and responsibilities (legal review, structuring and negotiation, business review, etc.). Establish timeline for required actions. Execute contract split/merger. Track progress of all applications/projects with respect to the agreed-upon TSAs.

A poor approach to categorization and prioritization of vendor contracts. Underestimation of time and effort required to review and negotiate new contracts. Absence of strong project management overseeing the contract separation/merger process. Lack of TSA and SLA rigor and formality in a separation scenario due to false comfort in same parent relationship between parties.

Success Factors and Best Practices We follow a structured approach to managing the TSA and contracts, which is critical to the successful delivery of any MAD&S program. Ideally, a project manager with significant sourcing experience should lead the overall contract separation/merger effort, focusing on the following key activities:

Organization and Change Management


Organizations have to adapt to multiple changes during the MAD&S initiatives. Based on our experience, the IT department faces the following challenges:

Develop an inventory of contracts/TSAs. Review terms and conditions and categorize contracts into logical groups (i.e., unnecessary, covered under affiliate agreement, new contract required, etc.).

Unclear future-state design for the separated/ merged companies, including discussions regarding shared services. Weekly managed or poorly orchestrated communication strategy. Lack of a thorough change management plan and approach.

cognizant 20-20 insights

A Pragmatic Approach to Change


Plan for Change
Change Management Change Management Stakeholder Identification and Analysis Business Change and Readiness Assessment As-Is Organization Review

Analyze/Syndicate Organization
Key Outcomes:
Stakeholder assessment matrix Change readiness survey HR policies and procedures Summary Matrix Communication Analysis, Planning and Content Development Business Change Impact Assessment Organization Model/ Structure Asessment To-Be Organization Design and Governance

Key Outcomes:
Communication plan Business change impact assessment results To-be organization structure To-be governance model

Organization Design

Implement Organization/Change
Change Management Change Management

Organization Design

Sustain and Monitor


Ongoing Communication and Communication Evaluation

Key Outcomes:
Launch & Execute Communications Communication materials Organization transition materials (organization transition plan and organization transition tracking) Performance support materials

Key Outcomes:
Support plan Communication evaluation report Deployment evaluation report

Organization Design

Organization Design

Deploy New Organization

Monitor, Support and Evaluate

Figure 7

Absence of clear indicators to determine the success of the change management process. Insufficient focus on business readiness as initiatives near completion and transition.

Downstream data center setup (sizing, capacity, contracts). Disaster recovery and business continuity services (to prevent potential loss of important assets such as data, hardware and software).

Success Factors and Best Practices/Approach A pragmatic approach to planning, analyzing, implementing and sustaining/monitoring of the organization and change management process is necessary for the successful delivery of the programs (see Figure 7).

Figure 8 displays the scenario in terms of separating the legacy environment into two separate companies. Success Factors and Best Practices/Approaches

Implementing the Infrastructure


The backbone for a successful MAD&S planning is implementing a robust infrastructure. There are multiple challenges in infrastructure planning during a MAD&S scenario:

Assess infrastructure dependencies.

> > > > > > >

Start with TOGAF-based reference framework. Develop infrastructure dependency list. Eliminate redundant hardware and software.

Business and application changes/indecision. Safeguarding information security by aligning security policies. Complicated application and infrastructure environment. Consolidation of technical architectures to reduce cost and complexity of IT environment. Delayed hardware/software orders (due to late placement or late delivery). cognizant 20-20 insights

Consider migration alternatives. Single greenfield. Dual greenfield.

Develop phased migration plan. Technology dependencies. Regulatory constraints.

Separation into Two Companies


Current Production Environment Downstream Company Upstream Company Downstream Company

Retire Legacy Servers Develop New Environment SAN Establish Core Services Migrate Dedicated Servers Migrate Virtualization Candidates

End-State Goal > Separate Infrastructure

Figure 8

Implement transition plan.

and licenses to ensure compliance.

> > >

People. Process. Technology.

Management of the creation, execution and extrication of TSAs between the upstream and downstream companies. Provision of resources (consulting and technical) across different skill sets required to deliver projects or manage the overall program. Management of critical dependencies/impact on in-flight projects and smooth execution without interruption. Provision of expertise in defining and executing data separation strategies, testing factories and other core technical concepts. Empowerment of the CIO to proactively support and communicate with the C-suite regarding critical MAD&S issues related to IT.

Conclusion
MAD&S poses multiple IT challenges for O&G companies; however, taking a structured approach and engaging the right partners to bring in learning and best practices can guide organizations through those challenges and help in successful delivery of the initiatives. The key areas of action when embarking on an MAD&S endeavor are:

Definition of scope, identification of projects and development of plans for the MAD&S program. Enablement of the IT PMO in orchestrating split/MAD&S in a challenging environment and integration with enterprise goals while minimizing risk. Guidance, prioritization and management of the separation/integration of all IT contracts

It is vital for organizations engaging in MAD&S activities to work with trusted partners with industry knowledge/expertise and experience from previous IT MAD&S projects to ensure greater transparency, increased reliability and efficient execution of the programs.

cognizant 20-20 insights

About Cognizant
Cognizant (NASDAQ: CTSH) is a leading provider of information technology, consulting, and business process outsourcing services, dedicated to helping the worlds leading companies build stronger businesses. Headquartered in Teaneck, New Jersey (U.S.), Cognizant combines a passion for client satisfaction, technology innovation, deep industry and business process expertise, and a global, collaborative workforce that embodies the future of work. With over 50 delivery centers worldwide and approximately 137,700 employees as of December 31, 2011, Cognizant is a member of the NASDAQ-100, the S&P 500, the Forbes Global 2000, and the Fortune 500 and is ranked among the top performing and fastest growing companies in the world. Visit us online at www.cognizant.com or follow us on Twitter: Cognizant.

World Headquarters
500 Frank W. Burr Blvd. Teaneck, NJ 07666 USA Phone: +1 201 801 0233 Fax: +1 201 801 0243 Toll Free: +1 888 937 3277 Email: inquiry@cognizant.com

European Headquarters
1 Kingdom Street Paddington Central London W2 6BD Phone: +44 (0) 20 7297 7600 Fax: +44 (0) 20 7121 0102 Email: infouk@cognizant.com

India Operations Headquarters


#5/535, Old Mahabalipuram Road Okkiyam Pettai, Thoraipakkam Chennai, 600 096 India Phone: +91 (0) 44 4209 6000 Fax: +91 (0) 44 4209 6060 Email: inquiryindia@cognizant.com

Copyright 2012, Cognizant. All rights reserved. No part of this document may be reproduced, stored in a retrieval system, transmitted in any form or by any
means, electronic, mechanical, photocopying, recording, or otherwise, without the express written permission from Cognizant. The information contained herein is subject to change without notice. All other trademarks mentioned herein are the property of their respective owners.

You might also like