Substation Grounding- Sahadeo

Latchmepersad, T&TEC 1
T&T Subsection
Local IAS Chapter
GROUNDING-DESIGN AND CONSTRUCTION
Saturday 12
th
November 2005
Presented by
Eng. Sahadeo Latchmepersad, MIEEE, MAPETT, R. Eng.
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 2
ACKNOWLEDGEMENT
The Trinidad and
Tobago Electricity
Commission
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 3
Range of Large Industrial
Customers
Rate D3- 4-25 MVA at
33, 66 or 132 kV
Rate E > 25 MVA at
66 or 132kV
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 4
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 5
Transmission
B.C/Union Estate
Schematic
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 6
Objectives of Grounding
To provide means to carry electric
currents to earth under normal and
fault conductors without exceeding any
operating and equipment limits or
adversely affecting continuity of service.
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 7
Objectives of Grounding-
To ensure that a person in the vicinity
of grounded facilities is not exposed to
the danger of critical electric shock.
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 8
Basic Shock Situations
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 9
BRIGHTON 66kV
SUBSTATION
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 10
Ventricular Fibrillation
The most dangerous consequence of
electric current passing through the
vital parts of a human body is a heart
condition ventricular fibrillation
immediate arrest of blood circulation.
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 11
Design Algorithm
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 12
Measuring Soil Resistivity
Procedure depends on the instrument
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 13
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 14
Soil Resistivity Calculation
= 2 x Pi x a x R
Where R is Maximum
measured Value
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 15
Tolerable Step Voltage
Step Voltage Limit 50 kg
E
Step 50
= (1000 + 6 C
s

s
) 0.116
t
s
E
Step 70
= (1000 + 6 C
s

s
) 0.157
t
s
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 16
Tolerable Touch Voltage Limit
E
touch50
= (1000 + 1.5 C
s

s
) 0.116
t
s
E
touch70
= (1000 + 1.5 C
s

s
) 0.157
t
s
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 17
Constants
C
s
= 1 [0.09 (1 - /
s
)]
[2 h
s
+ 0.09]
= soil resitivity

s
= surface layer resistivity
T
s
= duration of shock current in
seconds including clearance time of
circuit breaker plus relay
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 18
Conductor Sizing
I = A
mm
2
[TCAP.10
-4
] Ln K
o
+ T
m
[t
c

r

r
] K
o
+ T
a
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 19
Grid Resistance
burial of depth the is h
conductor of length total the is
/ 20 1
1
1
20
1 1
T
T
g
L
y resistivit soil the is Where
A h A
L
R

|
.
|

\
|
+
+ + =
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 20
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 21
Calculated Step Voltage
E
s
= K
s
K
i
I
G
L
s
L
s
= 0.75L
c
+ 0.85 L
R
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 22
Calculated Mesh Voltage
E
m
= K
m
K
i
I
G
Where
L
M
L
m
= L
c
+ 1.55 +1.22 L
r
L
R
L
X
2
+ L
y
2
L
R
= total length of ground rods
L
c
= length of conductor
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 23
Earthing Designs
Nitrogen 2000 66kV Substation
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 24
Output file
Nitrogen 2000 substation
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 25
Exothermic Joints
Step 1
Position clean, dry cables in mold and
close clamp.
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 26
Insert disk, insert pour weld metal and
starter material into crucible, and ignite to
form the weld.
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 27
Remove finished connection.
Clean mold
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 28
FENCE EARTHING
1. Inclusion of the fence within the
ground grid area. Under this
philosophy, the perimeter conductor of
the grid will parallel the fence at a short
distance of 1.0m outside. The crushed
rock covering will also be required
outside the fence.
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 29
FENCE EARTHING
2. Placement of the fence outside the
ground grid area with close electric
coupling between fence and adjacent
earth along its length, but with no
electrical tie between the fence and the
main station grid
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 30
ANSI STANDARD 80-2000 Date: November 11, 2005
Date:
Line-to-line Voltage V 66000 Volts Touch voltage limit E touch 70 1792 Volts
Maximum fault curent HV side 20000 Amps Step voltage limit E step 70 5678 Volts
Maximum Fault Current LV side 20000 Amps
Soil resistivity
15

m Touch voltage limit E touch 50 1324 Volts
Substation Length L 34 metre Step voltage limit E step 50 4195 Volts
Substation Width W 30 metre
Spacing D 4 metre GPR = 4944 Volts
Number of ground rods 28 Ea Em= 606 Volts
Length of ground rod 2.44 metres Es= 619 Volts
Depth of grid burial h 0.5 metres
Fault Duration t
f
0.1 s Length of 4/0 Copper Required 574 metres
Current Division Factor S
f
1 Size of Copper d = 0.01 metres
X/R Ratio 7.20 No. of Copper Rods 28 Ea
Crushed Rock Resistivity

s
2500

m
Ambient temp T
a
40
o
C
Grid Resistance 0.23

Thickness of crushed rock h
s
0.102 metres
Grid shape (Square=S,
Rect.=R, L- shaped=L) r
Substation L-shape Length l 0 metre
Substation L-shape width w 0 metre
50kg Design O.K
70kg Design O.K
INPUT DATA RESULTS
T&TEC Grounding Program
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 31
Development Program
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 32
AutoGrid Pro
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 33
Connection to Customers
Substation
Fence eathing
Number of Tails
Increased area-lower Rg
Increased amount of copper
Substation Grounding- Sahadeo
Latchmepersad, T&TEC 34
The End
Questions?
Thank You