PARTICULAR Quantity
UNITS OF PAYMENT
SUB-HEAD I EARTH WORK: 6.6 Excavation for foundation 6.13(a) Earth filling under floor SUB-HEAD II CONCRETE 10.34 Base Concrete 1:5:10 Damp Proof Course 10.114 H.D.P.C 4 cm thick 1:2:4 with the two coats of bitumen laid hot SUB-HEAD III BRICK WORK: 11.2 Ist Class brick work in cement mortar 1:6 in foundation and plinth 11.7 Ist Class Brick work in cement mortar 1:6 in super structure SUB-HEAD V FLOORING WORK 14.48(b)(ii) TILES FLOORING SUB-HEAD VI FINISHING : 15.52 Cement
AMOUNT Rs.
187.332
% cu.m
1108.10
350%
934121.65
379.89
% cu.m
343.40
300%
521816.90
62.44
Per cu.m
354.05
370%
103893.54
106.11
Per sq.m
35.05
340%
16364.28
73.32
Per cu.m
393.45
400%
144238.77
213.61
Per cu.m
414.45
400%
442653.32
1233.66
Per sq.m
251.35
120%
682176.97
1233.66
Per
12.65
340%
68665.51
15.6
15.11
17.18(a)(i)
plaster 1:4(10 mm thick) under ceiling Cement plaster 1:5(12 mm thick)on inner walls Cement plaster 1:5(15 mm thick)on outer walls SUB HEAD VII WOOD WORK Shutters SUB-HEAD VIII PAINTING Two coat white wash SUB-HEAD IX STEEL Steel reinforcing bars including bending in R.C.C. work TOTAL Add 13% water supply and sanitary installation Add 13% electricity installation Add 5% architectural design and drawing
sq.m
584.4
Per sq.m
11.60
340%
29827.77
2267.74
Per sq.m
14.25
340%
142187.29
483.97
Per sq.m
404.90
250%
685858.08
16.50
4085.80
Per sq.m
0.90
140%
8825.32
18.22
816.61
Per quintel
917.05
450%
4118662.36
7899291.76 1026907.93
1026907.93
394964.58
10348072.18 517403.60
10865475.78 10865480
AKNOWLEDGEMENT
To the accomplishment of any feat is require a motivation & an extreme of guidance & knowledge.
Behind the successful completion of our project. There are number of people , whom we would like to thanks. With immense pleasure & deep sense of gratitude. We would like to express our to sincere thanks to man behind the certain Mr. Ashwani helping us with Mrs. Lakhwinder Kaur The submissions of project under guidance of Mr. Tarsem .
Design of a beam
span = 8.2 m b = 400 mm d = 500 mm M20 & Fe 415 [ - sigma] Self weight = 0.4 0.5 25 = 5 KN / m Load of 0.2 R.C.C slab of 8.20m = 0.2 8.2 25000 = 41 KN / m Load of 0.08 m thick mud mortar = 0.08 8.20 16000 = 10.4 KN /m Total Load = 5 + 41 + 10.4 = 56.4 KN / m Factored Load = 1.5 56.4 = 84.6 or 85 KN/m Max. factored beam = 85 (8.2)2 / 8 = 714 KN /m Let effective cover = 0.1 D 0.1 500 = 50mm d = 500-50 = 450mm and Xm = 0.48d = 216 mm Limiting bending moment Mlim = 0.138 ck bd2 = 0.138 20 400 (450) 2 = 223.56 KNm Area of tension steel corresponding to their moment, 0.87 y At1 = 0.36 ck b.m At1 = 0.36 ckb.m / 0.87 y = 0.36 20 400 216 / 0.87 415 = 1722.91 mm2 If d/ d = 0.1 sc = 353 N / mm2 M - Mlim = (sc Asc cc Sc ) ( d d ) Asc = ( 716 223.56 ) 106 / ( 353 0.446 20 ) (0.9 450 ) = 3533.78 mm2
corresponding tension steel At2 0.87 y At2 = sc Asc At2 = sc Asc / 0.87 y = 353 3533.78 / 0.87 415 = 3454.99 mm2
Total tension steel ,At = At1 + At2 = 1722.97 + 3454.99 = 5177.96 mm2 Asc = 3533.78 mm2 At1 = 1722.97 mm2 At2 = 3454.99 mm2 At1 + At2 =5178 mm2 At = 5178 mm2 Asc = 3533.78 mm2 Max. tension in steel 8000 mm2 > 5178 mm2 hence our calculation is correct Spacing between bars Tension spacing 55mm = 5 bars 16 mm diameter compression zone spacing 60 mm = 5 bars 12 mm diameter = 0.04 b d = 0.04 400 500 = 8000 mm2
Known data [ - Sigma] Breadth = 400 mm Depth =500 mm length = 3.5 m or 3500 mm it is a short column ( 3.5 / .50 < 12 ) live load = 56.4 KN / m }Total designed load 614 KN/ m dead load = 5 KN /m factored load = 1.5 61.4 = 92.1 KN / m Gross Area of concrete provided = 40 50 = 2000 cm2 Longitudinal Area of steel = 0.008 2000 = 16 cm2 =1600 mm2 Use 6 bars of 18 mm dia. giving total area = 1526.04 mm2 Diameter & pitch of lateral ties t l/g ( =18/4 = 4.5 ) 6 mm Adopt 6mm ties pitch P 600 mm ( least lateral dimension ) 16 l ( 16 18 = 288 mm ) 300 mm Adopt a pitch of 300 mm C/C
REFERENCES :
Codes of practice 456: 2000 Reinforced concrete by A.K.Jain Haryana Shedule Rate (H.S.R) PWD B And R (Haryana) Reinforced Concrete by B.C.Purnia Building Bye Laws (HUDA)
Effective Span :
In two directions will be x = 5.60 + 0.173 = 5.773 m ( Effective depth = 200 - 20 - 12 / 2 174 mm ) x = 5.60 + 0.200 = 5.80 m ( Bearing of slab = 200 mm ) x = 5.773 m ( Least value )
Consider 1m wide strip of slab in both the direction of slab I. self weight of slab = 0.200 1 25000 = 5000 N / m . II.Load of 0.08 thick mud mortar = 0.8 1 16000 = 1280 N / m Live Load = 2000 1 = 2000 N / m
S.F at short edge = 1 / 3 w x ( r / 2 + r ) = 1 / 3 8280 5.78 = 15952.8 N Nominal shear stress at long edge, v = V / bd = 18316.178 / 1000 173 = 011 N / mm2 Area of steel at supports, As = 761.414 / 2 = 380.707 mm2 Anchorage value Lo = 8 12 = 96 mm % of steel = 100st / bd = 100 380.707 / 1000 173 = 0.22 % Check for shear : c = 0.20 N / mm2 Hence, v< c No shear reinforcement required Check for development length at the support M1 = st Ast j d = 230 380.707 0.90 173 = 13633498.38 N mm Assume development length = 65 mm Lo = 65 mm M1 / V + Lo = 13633498.38 + 65 / 18316.178 = 809.34 mm Ld = st / 4bd = 12 230 / 4 1.28 = 539.06 mm Since, M1 / V + Lo > Lo , then code requirement is satishfied
Summery of Design :
Overall thickness of Slab = 200 mm Effective Thickness of slab = 170 mm Reinforcement Along short span = 12 mm bars @ 200mm C/C Along long san = 12 mm bars @ 150mm C/C
RESIDENTAL
(a) Permissible Maximum Coverage Area of site Maximum permissible coverage On ground (including ancillary And residential zone ) 60% of the such portion Of the site Maximum permissible coverage on the 1st floor 55%
For the first 225 sq. mtrs. Of total area Of the site
For the next 225sq. mts. Ie. Portion of the Area between 225 And 450 sq. myrs. For the reamaing Portion of the site i.e. for the portion of the area exceeding 450sq. mtrs.
35%
25%
(b) Permissible FAR and maximum height Area of site/category of plot permissible 6 Marla 10 Marla 14 Marla 1 Kanal 2 Kanal Maximum permissible FAR Maximum Height 11 mtrs. 11 mtrs. 11 mtrs 11 mtrs. 11 mtrs.
Building zone
As shown on zoning plan site allotted to cooperative Society/organization as per zoning plan or the BIS code as the case may be
Max. permissible 33.33% of the site on ground and subsequent floors Coverage on ground or 35% of the site on ground floor and 30% on Subsequent floors Max FAR Population density unit Super area of General DUs Super area of EWS Dwelling unit Max height of Building 175% of the site area 100 to 300 persons per acre @ 5 persons per dwelling
The limit of the maximum height of the building has been removed. Above 30 mts height clearance from national Airport Authority of India wil be required. More than 60 mts Height regarding structural stability the clearance from the Recognized insitutions like ITTs Punjab Engineering College (PEC) regional Engineering college/National Institute of Technology etc. and for the fire safety clearance from institute Of Fire Engineers Nagpur will be required.
Covered parking
In addition to open parking provided,if any the covered parking Per dwelling unit shall be as follows : Upto 75 sq. mts. Above 76 sq.mts. = 06 sq. mts. = 35 sq. mts.
Building more than 15 mts high shall have provision of lifts As per BIS Building code in addition to stairs. For Continous running of lift system provision of power generator run On diesel/petrol or other such fuel shall be made. The height of the machine room of lift shall be sufficient to allow any portion of equipment to be accessible and removable for repair and replacement and shall be not less than 2.0 mts. From the floor or the plateform of machine. Ramp shall be optional. If constructed in addition to the lifts And stair cases(as per NBC)will not be counted towards FAR Subject to the condition that ground coverage shall not exceed 35% Of the site. A four level basement is permitted within zoned Area. About 15% Zoned area may be reserved for generator set for the captive power generation and electrical sub station. The basement area is segregated form the main block of building trough permanent wall. Rest of the area can be used for basement parking purpose only. Entry to basement shall be from inside of building 1.5 equivalent Car Space (ECS) for each dwelling until will be required. Also minimum 75% of car parking is provided in the form of covered parking basement shall not be covered in FAR and shall further be subjected to restrictions stipulated in the zoning
Ramps
Basement
Meeting place
provision of meeting place may be allowed within prescribed FAR and ground coverage not more than the size of one dwelling unit being constructed by the society/organization. At least equal to 15% area of the site
The group housing societies / organization shall be responsible for making arrangement of boosting of water for their group housing for drinking and fire purpose. This shall include the construction of water storage of tank at any level and on top of building as per standard public health norms to be approved by Executive engineer, HUDA
Provision of letter boxes for each dwelling unit Proposed in the scheme shall be made at ground floors at entrance of their respective blocks. All building shall conforms to the provision of part IV of the BIS (National Building) Code, and shall be provided wit h adequate arrangements to over come fire hazards to the satishfication of concerned authorities. HUDA (Erection of building) Regulations ,1979 (as amended from time to time) shall apply. The Provisions of BIS (National Building Code) shall apply wherever HUDA (Erection of Building) Regulations, 1979 and zoning clauses are silent on any aspect.
Fire safety
Building
BUILDING REGULATIONS
Haryana urban development authority is a prime agency of the State Government engaged in the planned development of urban areas in the state. It undertakes development of land after the same is acquired by the Govt. of Haryana through its Urban Estates department for specipic land uses,like residential,commercial and Industrial etc. in accordance with the provisions of the Development Plans of a particular area. The Development Plans are prepared and published by the Director Town & country planning Haryana,in exercise of the powers conferred by subsection 7 of section 5 of the Punjab Scheduled Roods and Controlled areas (Restriction of Unregulated Development) Act,1963. After acquisition of land,a layout plan is prepared on the basis of a plane table survey of the acquired land,and in accordance with the norms & standards evolved by HUDA for providing a congential living environment. For the purpose of ensuring health and safety of the allottees and for proper aesthetics and a desirable street picture,Haryana Urban Development Authority (Erection of Building) Regulations,1979 have been framed. Which besides other design/structural requirements,specify the proportion of the site which may be covered with building,F.A.R. Max height etc. in the case of different types of buildings.
INDUSTRIAL
Maximum permissible Coverage on ground 60 percent of area of The site Maximum coverage on Ground (percentage of site area) Maximum permissible floor area ratio 125 per cent Maximum height of the industrail building 21 meters
40% for new units and 60% for existing industry Converting into information Technology units
250
150%
150%
.(ii)
C = 1/2kbd c cos + .c k d 6 C = ()0.28950070.85d + 3600 70.289d d 6 = 780.67d ....(iii) L.A. for the section = 957.98d 780.67d = 0.88d Hence lever arm factor j = 0.904 Alternatively taking the section to be an equivalent rectangle of width = b +(1/8) (B b) = 500+(1/8) (3400 500) = 860 mm Mr = Qbd = 0.914800d = 786.04d Hence we can take the traperodial section to be a rectangle. Mr = 780.67d = 780.67d 372 10^6 d = (37210^6)/780.67 = 690 mm Effective depth at end = 0.2d = 0.2690=138 mm
Check for shear The sections is to be checked for beam shear is at distance d = 700 mm from column face were shear force is given by V= pB[1/2(B-b)-d] = 104 3.4{1/2(3.4-0.5)-0.69} = 104 3.4{0.58-0.69} = 104 3.4{-0.11} V = 526.86 KN Effective depth at location = 140 + 700-140 (1450-700) 1450 = 430 mm Top width of section = 500 + 3400-1900 174 290 =2800 mm v = V/b.d = 526.86 1000 2800 430 = 0.22 Nmm c = 0.35 Nmm Design is safe , A B C D = 2[(a+d) + (b+d)] = 4[a+d] = 4[500+690] = 4760 mm A B C D =[area] = 1.21.2 = 1.44m Punching shear=104[3.43.3-1.44] =1052.5KN v=1052.5 1000 = 0.32 N/mm 4760690 c= 0.16fck = 0.1620 =0.72N/mm Ks = (0.5+c) = (0.5+1) =1.5 Hence Ksc = 10.72 =0.72N/mm
Hence safe. Steel reinforcement Ast = M/stjd Where j = 0.904 = 372/(2300.904690) = 2592.8mm Using 16 mm dia bars A =201 mm No. of bars =2592.8 =13 201 A2 = 500 400 =200000 A1 = {500+2(2690)} =10627600mm A1/A2 = 12816400/200000 =8 Permissible bearing stress = 0.25fckA1/A2 = 0.25208 = 40 N/mm Actual bearing stress = (1210^5)/500400 = 6 N/mm Hence satisfactory.
DETAILED ESTIMATE
DETAILS OF MEASUREMENT ABSTRACT OF COST
Required Formule For Designing The slab taken from IS 456 : 2000 ANNEX D (Clauses 24.4 and 37.1.2)
The maximum bending moments per unit width in a slab are given by the following equations: Mx = x w lx My = y w lx Where x and y are coefficients Mx,My = moments on strips of unit width spanning lx and ly respectively lx and ly = lengths of the shorter span and longer span respectively Mx = x w lx My = y w lx
Required Formula For Designing The slab taken from IS 456 : 2000 ANNEX E (Clauses 25.2)
The effective length of columns in framed structures may be obtained from the ratio of effective length to unsupported length 1 and 2 are equal to Kc/(Kc+Kb) Q = Pu u/(Hu hg) where Pu = sum of axial loads on all column in the story, u = elastically computed first order lateral deflection, Hu = total lateral force acting within the storey, and Hg = height of the storey
ITEM NO
PARTICULAR
N O
MEASUREMENTS L m B m H m
QUANTITY
EXPERIMENTAL NOTES
5
LxB R.C.C slab end to end over entire building : NET TOTAL 1266.33 sq.m 0.2 253.27
As the covered area of the building is 1266.33 sq. m As per design slab thickness is 200 mm 253.27
6.
Lintel over door and window : Over door D Over door D1 Over door D2 Over door D3
12 2 12 2
29
2.50 1.10
0.3 0.3
0.115 0.115
2.50 0.189
Over windows
5
Over ventilator
TOTAL 3.96 Cu. M
7.
R.C.C staircase Inclined slab Base slab Landing middle Landing slab 1st floor R.C.C steps TOTAL
1 1 1 1
33
0.91
0.91
0.15
4.09 4.9869
Cu. M
ITE
PARTICULAR
MEASUREMENTS
QUANTITY
EXPERIMENTAL
M NO
O SUNSHADES: Survey Lab S.O.M Lab C.T Lab Over door D3 Store Rooms And Bath Rooms Account & Chairman Room their Side Front of Account office & Chairman office Over Front windows Over girls Toilet H.O.D Room Seminar Hall Boys Toilet 1 1 1 2 2 11 6.16 7.26 2.1 4.07 0.6 0.6 0.6 0.6 0.6 0.5 0.5 0.5 0.5 0.5 3.3 1.85 2.178 1.26 2.44
NOTES
8.35
0.6
0.5
5.01
6.85
0.6
0.5
4.1
0.6
0.5
2.46
1 1 1 1
TOTAL
cu.m cu.m
9. 10
R.C.C beam in entire building TOTAL R.C.C Column in entire building TOTAL
77
3.50
0.4
0.5
Cu. m
53.9
11
: 1st class brick work in cement mortar 1:6 in Foundation and plinth : For long wall 1st footing 2nd footing 3rd footing with plinth For short wall 1st footing 92.12 2 footing 92.12 3 footing with plinth For Partition wall 1st footing 2nd footing 3rd footing with plinth 36.54 36.54 36.54 TOTAL Deduction for column from main wall Brick work in Foundation NET TOTAL PARTICULAR 0.15 0.07 0.21 0.07 0.35 0.14 0.38 0.89 1.07 83.82 10.50
rd nd
92.12
75
0.5
0.4
0.69
ITEM NO
N O
MEASUREMENT L m B M H M
73.32 QUANTITY
EXPERIMENTAL NOTES
1st class brick work in cement mortar 1:6 in Super structure: For Long wall For short wall Brick work in main wall For partition wall TOTAL Deduction : For column For window For Door Main door D D1 D2 D3 For lintels For ventilater TOTAL 5 0.9 0.23 0.75 1 12 2 12 2 6.00 1.23 1.00 0.9 2.00 0.23 0.23 0.23 0.115 0.115 3.0 2.70 2 2 2.70 4.14 9.16 0.92 3.24 4.86 3.96 0.77 75.55 Cu.m 75 29 0.4 2.3 0.23 0.75 3.50 1.80 36.54 0.115 3.50 19.18 289.18 Cu.m 243.3 92.12 0.23 0.23 3.50 3.50 195.85 74.15
24.15 27.61
ITEM NO.
PARTICULAR
NO
MEASUREMENT L m B m H m
QUNTITY
EXPERIMENTAL NOTES
HP=0.69-0.23/2 =0.23m 1 1 28.56 35.36 0.69 0.69 0.69 0.69 13.60 36.74 Length of long wall = Out to Out length of wall +H.P of one side + H.P of other side
29.06
0.69
0.69
11.95
Partition wall in A Partition wall in A12 Front long wall of A6+A8 Short wall of A1+A2 Short wall of A4+A8 Short wall of A12 Back long wall of A3,A5,A7 Partition wall at door opening Long wall in A9 Short wall in A9 Long wall of A13,A15 including A9 Short wall in A13,A19 Partition wall in A15 PARTICULAR
1 1 1 3 3 1 2
0.48 0.48 8.36 11.05 11.19 3.11 22.90 Length of partition wall = foundationthickness of wall /2 Length of short wall = In to In length-( H.P of one side + H.P of other side)
2.23
0.35
0.69
1.09
1 2 1
1 1 NO
1.02
0.69
0.69
ITEM NO.
EXPERIMENTAL NOTES
Long wall in A15 including A13 Front long wall in A15 &A14 verandah including Long wall in A16 & A17 Short wall in A16 & A17 Partition wall in A16 &A17 Wall l l to 3.51m main wall Wall l l to long wall Two partition wall chairman office Long wall of A16,17,18,19 Front long wall in A18 &A21 with verandah Long wall back A19,A20 &A21 Partition wall A19 & A20 11 to main other wall Short wall l l to main wall Short wall in A18 &A21 Short wall in A21 Short wall on A15 PARTICULAR
m 8.81
m 0.69
m 0.69
4.19
10.81
0.69
0.69
5.14
1 1
6.85 3.05
0.69 0.69
0.69 0.69
3.26 1.45
3.05
0.35
0.69
0.73
1 2
3.05 1.02
0.35 0.35
0.69 0.69
0.73 0.49
7.79
0.69
0.69
3.70
10.81
0.69
0.69
5.14
8.81
0.69
0.69
4.19
1 2 1 1 1 NO
ITEM NO.
EXPERIMENTAL NOTES
17.15
Short wall inA10 Partition wall in A10 Long wall in A10 Long wall in A22 Short wall in A22 Long wall l l to A22 Long wall in A11 partition wall l l long wall in A11 In A11 partition wall l l partition wall to A10 Short wall at entry Total
1 1 1 2 1 1 1 2
3.79
0.35
0.69
0.91
13.94
0.69
0.69
2.
Earth filling under floor 1 1266.33 0.30 379.89 cu.m As the covered area of the building is 1266.33 sq. m 0.30 earth filling height Cu.m
Toal
379.89
3.
ITEM NO.
SUB-HEAD II CONCRETE: Cement concrete 1:5:10 in foundation Quantity = 1/3 of excavation = 187.332 / 3 PARTICULAR
NO
MEASUREMENT L m B m H m
D.P.C 4cm thick 1:2:4 with two coats of bitumen laid hot : Total long wall 243.3 0.35 85.16
D.P.C taken = 0.35 m wide / partition wall taken 0.35 m wide Sq.m
92.12 36.54
0.35 0.30
Door :
D D1 D2 Main D Total Column Total deduction 12 2 12 1 1.23 1.00 0.90 6.00 0.35 0.35 0.35 0.35 5.166 0.7 3.78 2.1 11.75 10.50 22.25 Sq. m Sq. m Sq. m
75
0.4
0.35
NET TOTAL
106.11
Sq. m
ITEM NO
PARTICULAR
N O.
MEASUREMENT S L B H
QUANTITY
NET TOTAL
213.61
12.
13.
SUB-HAED V WOOD WORKDOORS WINDOWS AND VENTILATER S: D D1 D2 D3 W V 12 2 12 2 29 5 1.23 1 2 0.9 2 2 2.30 0.9 2.7 0 1.8 0.7 5 TOTAL 199.687 Cu. m Cu. m 77 3.4 3.4 0.69 614.46 10.8 120.06 3.375 21.6 2.7 0 39.852 4
14.
15
SUB-HEAD VI FINISHING :
12 mm thick cement plaster 1:6 inside : Plaster of inside wall : Inner long wall of mechanical lab Inner short wall of mechanical lab Inner long wall of F.M lab Inner short wall of F.M lab Inner long wall of survey lab Inner short wall of survey lab Inner long wall of S.O.M lab Inner short wall of S.O.M lab Inner long wall of C.T lab Inner short wall of C.T lab Outside of left hand side of inner long wall Outside of left hand side of inner Short wall Inner long wall of store room 2 13 3.5 91
8.20
3.5
57.4
13.8
3.5
96.6
8.2
3.5
57.4
9.56
3.5
33.4
8.20
3.5
86.1
5.60
3.5
39.2
8.20
3.5
86.1
6.70
3.5
46.9
8.20
3.5
54.6
8.66
3.5
60.62
2.96
3.5
10.36
6.39
3.5
44.73
3.51
3.5
36.85
Inner long wall 4 of account office Inner short wall 3 of account office Inner long wall of boys toilet Inner short wall of boys toilet Inner long wall of seminar hall Inner short wall of seminar hall Inner long wall of H.O.D room Inner short wall of H.O.D room Inner long wall of girls toilet Inner short wall of girls toilet Outside of right hand side long wall 2
6.30
3.5
88.2
8.20
3.5
86.1
3.5
49
2.48
3.5
20.04
13.17
3.5
92.19
8.30
3.5
87.15
8.20
3.5
57.4
3.35
3.5
37.17
3.5
49
3.35
3.5
35.17
8.66
3.5
60.62
Outside of right hand side of short wall A10,A11,2 bathroom set long wall length A10,A11,2
2.96
3.5
10.36
6.39
3.5
89.46
3.51
3.5
73.71
bathroom set short wall length Inner length of a long wall of guest room Inner length of a Short wall of guest room Inner length of long wall of chairman office Inner length of short wall of chairman office Main door Inner length of wall Inner length of long wall of store room A10 Inner length of short wall of store room A10 Wall between store room A10 & water cooler 4 4.5 3.5 63
4.75
3.5
66.5
4.90
3.5
34.3
6.30
3.5
44.1
2 4
4 3.3
3.5 3.5
28 46.2
1.8
3.5
25.2
10
3.5
70
3.3
3.5
34.65
Inner length of long wall of water cooler & kitchen Inner length of short wall of water cooler & kitchen Inner length of long wall of
1.8
3.5
37.8
3.3
3.5
46.2
1.8
3.5
25.2
Inner length of short wall of store room A22 Length of staircase wall Inner length of long wall of balcony Parapet wall of the building
10
3.5
70
1.8
3.5
12.6
3.3
3.5
23.1
146.4
584.4
TOTAL
2852.14
16.
SUB-HEAD VII PAINTING DOORS & WINDOWS Door D 12 2 1.23 2.70 29.70
Door D1
2 2 12 2 2 2 29 2 5
Door D2
0.9
43.2
Door D3
2.70 21.6
Window
2.80
1.80 292.32
Ventilator
0.9
0.75 39.15
2 TOTAL 17. White washing in 2 coats ceiling white washing 3 coats(same as calculated in Item no. 15 ) Total 1233.66 2852.14 483.97 Sq.m
4085.80
Sq. m
ITEM NO
PARTICULAR
NO.
MEASUREMEN TS L B H
QUANTIT Y
EXPERIMENTAL NOTES
18.
SUB HEAD VIII STEEL WORK : Steel reinforcement bars including bending in R.C.C work : R.C.C slab (Item no. 5) Lintels over doors and windows ( Item no. 6) Sun shades ( item no.8) R.C.C Staircase (item no. 7) R.C.C Column (Item no. 10) R.C.C Beam (Item no. 9) R.C.C Column footing (Item no. 14) TOTAL 253.27 Cu. m
3.96
Cu. m
29.725
Cu. m
4.986
Cu. m
53.9
Cu. m
79.98
Cu. m
614.46
Cu. m
1040.27
Cu. m @1% of R.C.C work density of mild steel Density of mild steel =78.5 q /cu. m
ABSTRACT OF COST
CONTENTS
CONTENTS NAME BUILDING BYE LAWS DETAILED SPECIFICATION EARTHQUAKE PREVENTIONS DESIGN OF SLAB DESIGN OF BEAM DESIGN OF LINTEL DESIGN OF STAIRCASE DESIGN OF BRICK FOUNDATION DETAILING OF COLUMN DESIGN OF ISOLATED COLUMN MEASUREMENT OF QUANTITY ABSTRACT OF COST REFERENCE
PAGE No.
6 - 11 12 20 21 23 27 - 38 39 43 44 55 56 - 60 61 67 68 74 75 80 81 - 96 97 - 100 101
Required formula for designing the beam taken from IS 456 : 2000 ANNEX G
(Clause 38.1) The moment of resistance of rectangular sections without compression reinforcement should be obtained as follows : (a) Determine the depth of natural axis from the following
equation
Xu /d = 0.87fy Ast
0.36fck b.d If the value of xu/d is less than the limiting value.Calculate the moment of resistance by the following expressions. Mu = 0.87 fy Ast d {1-Ast fy/ bd fck } c) If the value of xu/d is equal to the limiting value, the moment of resistance of the section is given by the Following expression: Mu,lim = 0.36 Xu max[ 1-0.42(xu, max/d)]bd fck Where the ultimate moment of resistance of section exceeds the limiting value Mu, lim compression reinforcement may be obtained from the following equation Mu Mu,lim = fsc Asc(d-d) Ast = Ast1 +Ast2 Ast2 = Asc fsc /0.87fy
0.70 l
0.80 l
1.00 l
1.00 l
1.00 l
1.20 l
Effectively held in Position and restrained Against rotation in one End,and at the other Partially restrained Against rotation but Not held in position
-----
1.50 l
Effectively held in Position at one end But not restrained Against rotation and At the other end Restrained against Rotation but not held In position Effectively held in Position and restrained Against rotation at one End but not held in position Nor restrained against rotation At the other end
2.00 l
2.00 l
2.00 l
2.00 l
MULLANA AMBALA
( HARYANA STATE BOARD OF TECHNICAL EDUCATION )
PROJECT PREPARED ON DESIGN OF ADMINISTRATIVE BLOCK OF S.D POLYTECHNIC SESSION 2009-2012 CIVIL ENGINEERING
SUBMITTED BY:-
Mr. TARSEM