JOB HAZARD ANALYSIS

DATE: JOB/TASK DESCRIPTION:: PROJECT NUMBER:

Keephills 3 COMPANY: CHEMCO ELECTRICAL CONTRACTORS


REVIEWED BY: NAME (PRINT):

JHA for crates/boxes with potential hazardous substances CRAFT(S) PERFORMING JOB: ELECTRICAL
SUPERVISORS INVOLVED:

Page 1 of 3

MEETING & REVIEW ATTENDANCE ATTACHED


APPROVED BY: PRINT: SIGNATURE:

Risk Category Low / Medium / High


POSITION: DATE:

Superintendent
RECOMMENDED HAZARD CONTROLS/OR SAFE JOB PROCEDURES

SEQUENCE OF BASIC JOB STEPS/TASKS

HAZARDS/POTENTIAL HAZARDS

A) Orientation & Training

Personal injury, property or equipment damage due to non-compliance practices, hazards, and/or legislated government regulations.

B) Wear appropriate PPE prior to removing contents.

Injury to personnel.

Chemco Electrical Contractors Revision 0

All personnel to have valid CSTS training and client/Chemco orientation. All personnel to have area specific training to client standards. No work within the area will be started without a valid hazard assessment in place. HART card shall be completed & reviewed by all employees involved in task. All equipment and materials to be used must conform the Chemco/Client standards & specifications. Completed documentation shall be reviewed prior to task and retained by site safety. / Foreman Be careful when removing covers/plastic from crates/boxes. Wear rubber gloves and respirators upon initial opening. Identify suspect material, if possible, and report findings to Chemco/Epcor HSE department. All workers to potentially be exposed must wear tyvex disposable coveralls. All workers involved with cleaning out the crate will wear a respirator with the appropriate style of filter for the hazard at hand. All workers will wear latex/rubber gloves for handling material. All workers will wear boot covers when handling material. Mono goggles, face shield may be required. Use proper handling & storage methods. For hazardous materials follow WHMIS standards.

JOB HAZARD ANALYSIS

DATE:

JOB/TASK DESCRIPTION::

JHA for crates/boxes with potential hazardous substances


SEQUENCE OF BASIC JOB STEPS/TASKS HAZARDS/POTENTIAL HAZARDS

Page 2 of 3

RECOMMENDED HAZARD CONTROLS/OR SAFE JOB PROCEDURES

C) Containing/wetting down the suspect area & material for safe handling. Containers only.

- Injury to personnel, possible airborne material/contaminants.

D) Removing contaminant/waste material. Injury to personnel. -

Chemco Electrical Contractors Revision 0

Ensure all PPE is in place & working effectively. Do not use a broom or vacuum to clean up suspect area. This will cause the contaminants to become airborne. Use appropriate means of completing job safely after assessing. i.e.: Wet down suspected area to keep down dust and airborne particulates. Utilize a 10% bleach solution. Assess electrical equipment to ensure no water is to enter this equipment. Remove all suspect material after treating appropriately. i.e.: Remove all waste material with a wet cloth/towel. Once finished mop & sponge down area with disinfectant solution. Utilize a drop sheet under the crate to capture contaminants. If any animals/rodents/unidentified substances, etc. exist, spray down with disinfectant solution liberally prior to removing. Dispose of all cleaning materials in a double bag, including drop sheet, while still wearing PPE. Dispose of all donned PPE in the required method or as above mentioned. All plastic bags must be identified as hazardous waste. Contact CMT Tony Kafer #4308/EPCOR for safe disposal of bagged substances. Site phone 4400, offsite phone 780-731-4400. Radio CMT#1.

JOB HAZARD ANALYSIS


Olaf Palutke #4306 CMT #1.

NOTE: Ensure work crew understands scope of work and lockout procedures.

Job Hazard Analysis Development


JHA for crates/boxes with potential hazardous substances

Page 3 of 3

Name
1 2 3 4 5 6 7 8

Company

Craft/Trade

Date

Job Hazard Analysis Development


JHA for crates/boxes with potential hazardous substances

Name
1 2 3
Chemco Electrical Contractors Revision 0

Company

Craft/Trade

Date

JOB HAZARD ANALYSIS


4 5 6 7 8

Chemco Electrical Contractors Revision 0