You are on page 1of 3

[ This form should be submitted along with Common Application Form in Annexure I ]

Annexure XIX

Application for Building Completion Certificate and Drainage Completion Certificate * *

1.

Details I/We hereby certify that the erection / re-erection or development work

in / on building / part building _____________ on Plot No. ________ of ____________ Zone situated at ______________________ Road / Street

_____________________ in ____________________ Industrial Area has been supervised by me/us and has been completed on _______________ according to the plans sanctioned vide office communication No. _________________________, dated ____________. The work has been completed to my/our best satisfaction, the workmanship and all materials (type and grade) have been used strictly in accordance with general and detailed specifications. No provisions of the Act or the Building Bye-laws, no transgressed in the course of the work. I/We am/are enclosing three copies of the completion plans, one of which is cloth mounted. The building is fit for occupancy for which it has been erected / re-erected or altered, constructed and enlarged. I/We hereby request you to arrange for the inspection, issue Building Completion Certificate, Drainage Completion Certificate and give permission for occupation of the building.

2.

Documents 2.1 Amendment Plan in Metric System, if the changes are made during

construction as per D. C. Rules. 2.2 2.3 Consent / NOC from MPCB for air and water. Copy of letter from Regional Officer / Area Manager, if Extension of

time limit is given.

2.4

True copy of Approval of Factory Inspector / Undertaking of the

Allottee to that effect. 2.5 2.6 work. 2.7 Certificate of Structural Engineer stating the quality, soundness and True copy of valid License of Architect. Certificate of Licensed Architect about satisfactory completion of

certifying that structure is constructed as per approved design. 2.8 certificate. 2.9 Certificate of the Owner stating that the provision of 24 hour water Copy of Drainage Approval Plan along with the licensed plumber

storage is made. 2.10 2.11 2.12 applicable. 2.13 2.14 2.15 Copy of Approval of Explosive Department, if applicable. Copy of Approval of Civil Aviation Department, if applicable. Rain Water Harvesting Completion Declaration. Plantation of minimum No. of trees Certificate (as per D. C. Rules). Copy of Final NOC from Fire Department, MIDC. Copy of Locational NOC from Technical Advisor, MIDC, if

Encl.: As above.

Signatures Sr. No. Agency Address License No. & valid up to Signature Date

Name of Architect-

Name of Structural Engineer-

Name of Plumber

Name of Allottee

--

Declaration :

I/we hereby declare that, following documents as per the above mentioned list are not applicable in our case, hence the same are not enclosed. However we hereby undertake to produce the same, if required as per the rules and we shall be responsible for the same.

Signature of Architect / Allottee

Note :- 1. 2.

Document with one star (*) is acceptable under self certification. * * indicates that the Silence is Consent principle is applicable.

You might also like