Professional Documents
Culture Documents
Preparation
1software toolsT2000Navigator 2Gateway NEGNEcan be managed by T2000 and Navigator; 3new NE has physically connected to the PTN network and the DCN communication between the GNE and the NE is OK; 4BarCode information of the main control boardSCA/CXP of the new NE has sent back from the sites.
Collect NE information
Attention:
to make sure the the SCA/CXP on PTN can be seen clearly in the photo, the photo pattern should be as follow:
PTN912 Whole ViewFor PTN912 CXP Board BarCode Viewplease refer to PTN 910
menu;
3click the
4select IP Address of GNE 5 input the GNE IP in the Search Address; 6then select OK; 7press to start NE search;
when the search for new NE is finished or stop 8select the uncreated NE, and change the GNE ID to the local GNE ID; 9press button to creat the new NE
Double click
1Enter the IP of the Gateway NE to the NE IP Address, then click the connect to the Gateway NE;
button to
2Enter the NE ID of the non Gateway NE, choose the Force Login, then click the button to log in Gateway NE.
After this step, We can enter the command (:cfg-get-nestate) in the command input windows, If the result that displays in the result output windows isNE-STATE:running,then it means the NE is in running state.
4press
3Choose the board of the NE to be query in the NE management tree, 4then press window, 5then press to get the report; to make the board to the Board Manufatureer Information Report
6recoard this BarCode and use this BarCode to find out the site name from the BarCode Information Table.
to open NE explorer;
2enter Communication Parameter page In the left side of the NE Explorer, click the Function Tree, then choose
3change the Subnet Mask Enter new subnet mask according to LLD design then press 4change the IP Enter new IP according to the LLD design, then press 5press successfully. ;
4.2 change NE ID
1Right click the new created NE in the main topology, and select
button;
3change the NE ID and Extended ID according to the LLD design, then press
2press
5.2 creat the NE again follow step 1 5.3 Upload NE datafollow step 3.1