Oil Sands Company Name Project Description Project Location

RM of Wood Buffalo (S of Ft McMurray) RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo (S of Conklin) RM of Wood Buffalo (N of Ft McMurray) RM of Wood Buffalo (SE of Conklin) Lac la Biche County RM of Wood Buffalo (E of Conklin) RM of Wood Buffalo (S of Ft McMurray) RM of Wood Buffalo MD of Bonnyville (N of Barbara Lake) RM of Wood Buffalo (SE of Conklin) RM of Wood Buffalo (W of Ft. McMurray)

Cost in $ Construction Millions Schedule

Remarks

Alberta Oilsands Inc. BP Canada / Value Creation Inc. Canadian Natural Resources Ltd. (CNRL) Canadian Natural Resources Ltd. (CNRL) Canadian Natural Resources Ltd. (CNRL) Canadian Natural Resources Ltd. (CNRL)

'Clearwater West' SAGD Production 'Terre de Grace' SAGD Oil Sands Project 'Horizon' Oil Sands Project Phases 3 and 4 'Kirby South' In - Situ Oil Sands Project Phase 1 'Project Horizon' Mining and Drilling Project phase 2 / 3 KIRBY EXPANSION PHASE 1 OIL SANDS PROJECT (KIRBY NORTH PHASE 1 or KN1) 'Telephone Lake ' SAGD Project Phase 1 Christina Lake Thermal Expansion Project Phases 1E, 1F and 1G 'Foster Creek' Oil Sands Project Phases F, G and H 'Narrows Lake' In Situ Oil Sands Project using Solvents 'Great Divide' SAGD Expansion Phase 1 'Surmont Phase 2' Oil Sands Development

$415.0 $3,500.0 $200.0 $1,250.0 $1,080.0 2010-2013 2012-2014

Proposed. Application filed January 2010. On hold pending financing. Proposed for 2012 - 2013. EPC Technip. Under construction. Application approved Q3 - 2010. Announced. Approved Jan 2004. EPC Technip.EPC froth treatment plant SNC Lavalin. Proposed for 2014 - 2015. Application filed December 2011. Proposed for 2014 - 2018. Owner expects construction start 2014, pending approvals. Announced. Application approved April 2011. Estimated construction Phase 1E 2012 - 2014; Phase 1F 2012 2015; Phase 1G 2014 - 2016. Announced. ERCB approval September 2010. Site preparation underway.

$1,200.0

Cenovus Energy

$1,000.0

Cenovus Energy Inc. Cenovus Energy / ConocoPhillips Cenovus Energy Inc. / ConocoPhillips

$2,700.0 $2,000.0

2012-2016 2012-2017

$1,600.0

Proposed. Application filed early February.

Connacher Oil & Gas Ltd. ConocoPhillips Canada / Total Canada

$600.0 $2,000.0 2010-2015

Proposed for 2012 - 2013. Under construction. Bantrel Inc.

Devon Canada Corp.

'Walleye' Oil Sands Projects (SAGD)

$450.0

Proposed for 2013 - 2015, pending approvals. Under construction. Application approved by ERCB November 2011.

Devon Canada Corp. Dover Operating Corp. (/MacKay OPCO)

'Jackfish' Oil Sands Project Phase 3 'MacKay River' Commercial Oil Sands Project Phase 1

$1,300.0

2012-2014

$1,300.0

2012-2014

Announced. EP services for Central Plant SNC-Lavelin.

Inventory of Major Alberta Projects by Sector

January 2012

Dover Operating Corp. (Dover OPCO)

'Dover' Commercial Oil Sands Project Phase 1 Terminal Tankage (Storage Capacity) Expansion Phases 1 and 2 'Poplar Creek' Bitumen Extraction Project

RM of Wood Buffalo

$2,500.0

2012-2014

Announced. Application filed February 2011. Five phases in total.

Enbridge Inc. E-T Energy Ltd.

Strathcona County RM of Wood Buffalo RM of Wood Buffalo (Ft McKay) RM of Wood Buffalo RM of Wood Buffalo (SW of Ft McMurray) RM of Wood Buffalo (SE of Conklin) RM of Wood Buffalo (SE of Conklin)

$260.0 $103.0

Proposed for 2012 - 2013, pending regulatory approval. Proposed for 2011 - 2013. Planned construction start late 2011, pending regulatory approvals.

Finning (Canada) Ltd. Fort Hills Energy Corp. (Suncor Energy Inc. / Total SA / Teck Cominco)

Service Facility

$110.0

2011-2012

Under construction Proposed. Corporate approval for construction expected by end of 2012. Planned to come onstream in 2016.

'Fort Hills' Oil Sands Mine 'Algar Lake' SAGD Oil Sands Project Phase 1

$9,600.0

Grizzly Oil Sands ULC

$220.0

2012-2013

Under construction. SNC - Lavelin, Ledcor Alberta.

Harvest Operations Corp.

'BlackGold' Oil Sands Project Phase 2 'BlackGold' In Situ Oil Sands Project Phase 1

$540.0

Proposed for 2013 - 2015, pending approvals. Under construction. GS Engineering and Construction Corp. Announced Under construction. SaipamSpA. Application approved. Corporate approval Nov 2010. WorleyParsons Canada EPC field facilities. On hold pending review of costs and project optimization Proposed for completion by late 2015. Proposed. Planned on - stream by 2015. Corporate decision by end of 2011. Under construction. Three production trains / phases in total. Application approved (both phases). AMEC (EPC). Fluor Corp infrastructure and facilities. Proposed for 2012 - 2013. Application filed November 2010.

Harvest Operations Corp.

$300.0 $40.0

2011-2012 2012

northern Alberta RM of Wood 'Sunrise Thermal Project' SAGD Oil Buffalo (N of Ft Husky Energy Inc. / BP PLC Sands Project Phase 1 McMurray) RM of Wood Buffalo Husky Energy Inc. / BP Plc. 'Sunrise Thermal Project' Phase 2 'Kearl Lake' Oil Sands Project Phase 2 RM of Wood Imperial Oil Limited of 2 Buffalo MD of Bonnyville Imperial Oil Ltd. 'Nabiye' Oil Sands Project (Cold Lake area)

Horizon North Logistics Inc. Camp Construction Project

$2,500.0 $1,900.0 $8,900.0 $1,300.0

2011-2013

Imperial Oil Resources / ExxonMobil Canada

Ivanhoe Energy Japan Canada Oil Sands Limited (JACOS) / Nexen Inc.

'Kearl Lake' Oil Sands Mine Phase 1 of RM of Wood 2 Buffalo RM of Wood Buffalo (near Ft 'Tamarack' Bitumen Project Phase 1 McMurray) RM of Wood Hangingstone SAGD Commercial Buffalo (SW of Ft Production Project McMurray)

$10,900.0 2009-2012

$1,250.0

$1,200.0

Proposed for 2011 - 2014. Application filed.

Inventory of Major Alberta Projects by Sector

January 2012

Kinder Morgan Canada Laricina Energy Ltd.

Laricina Energy Ltd.

Laricina Energy Ltd.

MEG Energy Corp.

MEG Energy Corp. MEG Energy Corp. North West Redwater Partnership (Canadian Natural Resources Ltd. (CNRL) / North West Upgrading Inc.) OPTI Canada / Nexen Inc. Osum Oil Sands Corp. Pengrowth Energy Trust Petrobank Energy and Resources

Edmonton Terminal Storage Expansion Strathcona County 'Saleski' Oil Sands Pilot Project Expansion MD of Opportunity 'Germain' Commercial Demonstration Project (Solvent - Cyclic SAGD) Phase 1 MD of Opportunity RM of Wood 'Germain' Commercial Demonstration Buffalo (SW of Ft McMurray) Project Phase 2 RM of Wood Buffalo (Christina In Situ Oil Sands Project Phase 2B Lake) RM of Wood Buffalo (near Christine Lake SAGD Project Phase 3 Conklin) Stonefell Terminal (Bitumen / Diluent Storage Facility) Strathcona County

$210.0 $400.0

2012-2013

Announced Proposed for 2012 - 2014

$250.0

2011-2013

Under construction Proposed for 2013 - 2015. Application for phase 2 to 4 filed November 2011. Under construction. Flint Energy Services Ltd. Corporate approval December 2010.

$1,100.0

$1,400.0

2011-2014

$500.0 $150.0 2011-2013

Proposed. ERCB approval January 2012. Under construction

Sturgeon County Bitumen Upgrader Phase 1 (near Redwater) 'Long Lake South' SAGD Project Phase RM of Wood 2 (Kinosis) Buffalo MD of Bonnyville 'Taiga' Oil Sands Project (N of Cold Lake) RM of Wood SAGD Pilot Project, Lindbergh Buffalo RM of Wood 'May River' Commercial Bitumen Buffalo (W of Project Phase 1 Conklin) 'Orion' Heavy Oil SAGD Facility (Phases 1 and 2) MD of Bonnyville (Hilda Lake) RM of Wood Buffalo / Strathcona County

$4,000.0 $2,790.0 $1,570.0 $50.0

2012-2014

Announced. EPC SNC-Lavalin, PCL Industrial Management. Site preparation complete. On hold. Cost estimates are preliminary. Corporate approval deferred. Proposed for 2013 - 2018. Application filed January 2010. Nearing completion Proposed for 2012 - 2013. Application filed December 2008. FEED underway. ERCB hearing Ft McMurray begins March 6, 2012. On hold. Phase 1 completed, phase 2 on hold pending review. Approved Oct 2004. Phased development, building to 20,000 bpd.

2011-2012

$250.0

Royal Dutch Shell

$340.0

2005-2010

Shell Canada

Athabasca Oil Sands Project Debottleneck Phase 1

$2,000.0

Proposed. Muskeg River Mine, Jackpine Mine and Scotford. Corporate decision in 2011.

Inventory of Major Alberta Projects by Sector

January 2012

Shell Canada / Chevron / Marathon Oil

'Quest' Carbon Capture and Storage Project

near Ft Saskatchewan to Thorhild Cty Northern Sunrise County (NE of Peace River)

$900.0

Proposed for 2012 - 2015. Pending corporate approval. Application filed November 2010. Public hearing Redwater beginning March 6, 2012. EPC capture facility Fluor. EP pipeline Tri - Ocean Engineering. Public hearing begins in Redwater March 6, 2012.

Shell Canada Ltd. SilverBirch Energy / Teck Resources Ltd. SilverBirch Energy / Teck Resources Ltd. Southern Pacific Resource Corp. Southern Pacific Resource Corp. Suncor Energy Inc. Suncor Energy Inc. Suncor Energy Inc.

'Carmon Creek' Bitumen Project

$3,450.0

Suncor Energy Inc. Suncor Energy Inc. / Total SA Sunshine Oilsands Syncrude Canada Ltd. Syncrude Canada Ltd.

Syncrude Canada Ltd.

'Frontier' Oil Sands Mine Phases 1 and RM of Wood 2 Buffalo RM of Wood 'Equinox' Oil Sands Mine (Lease 14) Buffalo RM of Wood 'McKay' SAGD Oil Sands Project Phase Buffalo (N of Ft 1 McMurray) RM of Wood 'McKay' SAGD Project Phases 2A and Buffalo (NW of Ft McMurray) 2B RM of Wood North Steepbank Mine Extension Buffalo 'Voyageur South' Oil Sands Mining RM of Wood Operation Buffalo RM of Wood 'Firebag' Oil Sands Project Phase 4 Buffalo RM of Wood Buffalo (NW of Ft MacKay River SAGD Expansion McMurray) 'Voyageur' Oil Sands Third Upgrader RM of Wood (U3) Buffalo 'West Ells' Oil Sands Project Phase 1 of 2 MD of Opportunity Mature Fine Tailings Processing Plant RM of Wood (Demonstration Plant) Buffalo Composite Tailings Plant, Aurora North RM of Wood Mine Site Buffalo RM of Wood Two New Mine Trains, Mildred Lake Buffalo (N of Ft Mine Site McMurray)

$14,500.0 $2,500.0

Proposed for 2011 - 2016. Two central processing facilities and three co-generation units. Proposed construction start phase 1 in 2016. Application filed November 2011. Approval expected in 2014 / 2015. Four phases in total. Proposed. Application filed with Frontier application in November 2011. Under construction. Application filed May 2009. Approval October 2010. Proposed for 2013 - 2015 (phase 2A) and 2014 - 2016 (phase 2B). Application filed Novemebr 2011. On hold, but planned in-operation late 2012. Application approved November 2006. On hold. Application filed July 2007. Corporate approval January 2008. 2011-2013 Under construction. ERCB approval March 2010. On hold pending owner's decision to proceed. Application filed Dec 2005. Under construction. Project does not include bitumen feed to upgrader. Announced Proposed for 2012 - 2014. Newalta Corporation. 2012-2013 Announced

$415.0

2011-2012

$1,140.0 $400.0 $4,400.0 $2,000.0

$1,000.0 $11,600.0 2011-2016 $385.0 $25.0 $300.0 2012-2013

$3,600.0

Proposed for 2012 - 2014

Inventory of Major Alberta Projects by Sector

January 2012

Total E&P Canada Ltd. / Suncor Energy Inc.

Value Creation Inc.

Williams Canada

RM of Wood Buffalo RM of Wood Buffalo (S of Ft McMurray) 'TriStar' SAGD Pilot Project RM of Wood Off- Gas Extraction Plant Modifications Buffalo and Redwater and Construction of De - Ethanizer Joslyn North Mine

$8,900.0

Proposed for 2013 - 2017. ERCB conditional approval January 2011, federal approval December 2011. Corporate approval expected by end of 2012. FEED underway.

$100.0

Proposed

$311.0

2012-2013

Announced

Inventory of Major Alberta Projects by Sector

January 2012