The present document, its content, its annexes and/or amendments (the Document) has been drawn up by GAMESA CORPORACIN TECNOLGICA, S.A. (Gamesa) for information purposes only, and contains private and confidential information regarding Gamesa and its subsidiaries (the Company), directed exclusively to its addressee. Therefore it must not be disclosed, published or distributed, partially or totally, without the prior written consent of Gamesa, and in any case expressly indicating the fact that Gamesa is the owner of all the intellectual property. All the content of the Document, whether it is texts, images, brands, trademarks, combination of colours or any other element, its structure and design, the selection and way of presenting the information, are protected by intellectual and industrial property rights owned by Gamesa, that the addressee of the Document must respect. In particular (notwithstanding the general confidentiality obligation), the addressee shall not reproduce (except for private use), copy, transform, distribute or publish to any other third party, any of the information, totally or partially.
Indice
1.- Introduccin
La Integracin en el Sistema Elctrico de gran cantidad de Generacin Renovable hace que se reduzca la presencia de Generacin Convencional a lmites insospechados y que la Potencia de Cortocircuito del Sistema disminuya. Pudiendo dar lugar a:
Posible fallo en el sistema de protecciones. Profundizacin y extensin espacial adems de temporal de los huecos de tensin. Posible riesgo de desconexin de la Generacin Convencional por mnima tensin temporizada o prdida de estabilidad
Esto obliga a los Operadores de Red a exigir a dicha Generacin, las mismas o similares funcionalidades que a la Generacin Convencional. Se debe disponer de un Sistema de Gestin estructurado para lograr respuestas rpidas al existir muchos puntos de generacin (Despachos Delegados)
03/11/11 Mxico D.F
Estrictamente confidencial & uso restringido / Strictly confidential & limited use Copyright 2009 Gamesa Corporacin Tecnolgica, S.A.
1.- Introduccin
La Energa Elica es una fuente de Generacin muy importante en todo el mundo. Existen pases con una penetracin elica en su sistema muy elevada, como es el caso de Espaa, con una penetracin bastante superior al 15% del total de la demanda y con picos del 60 % durante el periodo valle, asociado a la noche y el fin de semana. Debido a la Integracin de la Energa Elica y motivada por la configuracin de la red , as como del tipo de aerogeneradores instalados en las mismas, est obligando a los Operadores de Red a revisar las Regulaciones Actuales para poder asegurar la estabilidad de la red. Por ello, actualmente se detectan en los Cdigos de Red especficos de Generacin Elica, requisitos tales como: Regulacin de Potencia Reactiva Control de Tensin. Regulacin de Potencia Activa Regulacin de Frecuencia. Huecos de Tensin. Calidad de Energa.
03/11/11 Mxico D.F
Estrictamente confidencial & uso restringido / Strictly confidential & limited use Copyright 2009 Gamesa Corporacin Tecnolgica, S.A.
1.- Introduccin
Estabilidad del Sistema
1.- Introduccin
Estabilidad de la Tensin
1.- Introduccin
Estabilidad de la Frecuencia
1. Curtailment Potencia Activa 2. Regulacin Primaria 3. Inercia Inercia Sinttica
1.- Introduccin
Estabilidad del ngulo de fase
1. Regulacin de Tensin a la salida del Hueco evitando sobre tensiones 2. Reduccin de Oscilaciones de Potencia PSS
Estrictamente confidencial & uso restringido / Strictly confidential & limited use Copyright 2009 Gamesa Corporacin Tecnolgica, S.A.
1.- Introduccin
EL OS recibe en tiempo real informacin desde el Despacho Delegado (wind farms Status) Basado en esta informacin, el OS define distintas consignas (por nodo o Parque Elico)
Gamesa SCADA
System Operator
WF Owner/ Maintenance
El Despacho Delegado recibe seales de consigna y las enva a los correspondientes Parques Elicos Cada Parque Elico aplica su consigna El Despacho Delegado y el OS monitorizan el cumplimiento de los comandos de consigna 03/11/11 Mxico D.F enviados.
Meterological Mast
SCADA Client
Telephone
Fax
Other devices
PDA
Mobile
Electrical Substation
Estrictamente confidencial & uso restringido / Strictly confidential & limited use
1.- Introduccin
GAMESA ha desarrollado su propio Despacho Delegado para poder cumplir con todos los requisitos de seguridad de los operadores de Red. Las funciones principales del Despacho Delegado son: Enviar las seales del Parque Elico al Operador de Redr (P, Q, V, Vviento, etc) y recibir consignas de comandos Enviar ordenes de regulacin a los parques Elicos va SCADA (Potencia Activa , Potencia Reactiva) Recibir/Enviar otras rdenes para colaborar con la estabilidad del sistema. Toda la informacin intercambiada con el Operador de Red es en Tiempo real.
03/11/11 Mxico D.F
Estrictamente confidencial & uso restringido / Strictly confidential & limited use
10
2. Regulacin de Tensin
Debido al reducido nmero de centrales convencionales, al ser desplazadas por el rgimen especial, empieza a ser imposible mantener las tensiones sin la colaboracin activa del rgimen especial.
En el caso de generaciones en lneas largas y sistemas dbiles. Los cambios en la potencia generada ocasionan variaciones muy importantes en las tensiones.
03/11/11 Mxico D.F
Estrictamente confidencial & uso restringido / Strictly confidential & limited use Copyright 2009 Gamesa Corporacin Tecnolgica, S.A.
11
2. Regulacin de Tensin
Se debe dotar a los Parques Elicos de la suficiente capacidad de Potencia reactiva para poder hacer frente a los eventos que puedan darse en el punto de conexin. Control de tensin en rgimen permanente (Con limites fijados) Respuesta dinmica ante transitorios de la red (p.e. LVRT) La capacidad de dicho Control depende de: Caractersticas de la Red: Imax, Iscmax, X/R ratio, Nivel de Tensin Condiciones del Aerogenerador:, Potencia disponible, tensin en terminales, temperatura (PQTV) Los controles de tensin/Reactiva ms comunes son: Cambios de la tensin en un 5% en tiempos entre 1 y 5 s. Rango de Potencia Reactiva: 35% de la potencia Nominal del Parque Elico Funcionamiento en un rango de Tensin (POI): 15% 03/11/11 Mxico D.F Precisin superior al 0,5% en la consigna. 12
Estrictamente confidencial & uso restringido / Strictly confidential & limited use
2. Regulacin de Tensin
Los diferentes Operadores de Red exigen requisitos de Control de Tensin/Regulacin de Reactiva de forma muy diversa.
Pas
Espaa
Requisito
Siguiendo una tabla de Factor de Potencia, definido para los periodos, Valle, Llano y Punta (en un futuro prximo, control dinmico de V) Sistema de control automtico capaz de operar a una tensin en el punto de referencia entre el 95% y 105% con una resolucin de 0,25% de la tensin nominal y los perfiles definidos por la pendiente Parque Elico puede funcionar en retraso (0.925) o adelanto (0,95), factor de potencia en caso de tensiones fuera de los lmites permisibles Parque Elico funciona segn una curva caracterstica PQ para "absorber" y "producir" Q Parque Elico que opera en especfico "V" curvas de retraso (0,835 Max en Pnominal 50%) y en adelanto (0,95 mximo en Pnominal) Sistema de control automtico capaz de funcionar a una tensin de consigna Parque Elico que opera dentro de una "V" de la curva PQ de control con una capacidad total de dinmica de 30% de Qnominal (en Pnominal).
Reino Unido
Dinmica de control V
Alemania
PF de control
Dinamarca Irlanda
Q de control PF de control
EE.UU Canada
03/11/11 Mxico D.F
Dinmica de control V
Dinmica de control Q
Estrictamente confidencial & uso restringido / Strictly confidential & limited use
13
2. Regulacin de Tensin
ESPAA
Estrictamente confidencial & uso restringido / Strictly confidential & limited use Copyright 2009 Gamesa Corporacin Tecnolgica, S.A.
14
2. Regulacin de Tensin
Control de Tensin. Necesidad de Consignas de Tensin en la Red de Transporte. Simulacin de cambio de Factor de Potencia en Galicia. Paso de Valle a Llano
Fuente REE
Estrictamente confidencial & uso restringido / Strictly confidential & limited use Copyright 2009 Gamesa Corporacin Tecnolgica, S.A.
15
2. Regulacin de Tensin
Cosf=0,95 f
La bsqueda de la mxima bonificacin por parte de los generadores de rgimen especial produca tensiones inadmisibles de forma generalizada
Cosf=0,995 f
Admisible
Admisible Tensiones elevadas fuera de lmites Elevada generacin de potencia reactiva Prdidas
03/11/11 Mxico D.F
Estrictamente confidencial & uso restringido / Strictly confidential & limited use
1616
2. Regulacin de Tensin
o Variacin de las tensiones en la RdT en transiciones valle-punta. (9/3/2009)
NUDOS DE 400 kV NUDOS DE 220 kV
17:50
7:56
18:00
8:06
18:10
8:16
17
2. Regulacin de Tensin
18
2. Regulacin de Tensin
Se ha demostrado que la Regulacin por Factor de Potencia, no es una regulacin que permita el control de la tensin de una forma rpida y por tanto de asegurar la estabilidad del sistema. Los nuevos Cdigos de Red se basan en la Gestin de la Potencia Reactiva y en el Control de Tensin, que permiten controlar de una manera ms sencilla y directa la tensin en los nodos del Sistema.
19
2. Regulacin de Tensin
20
2. Regulacin de Tensin
Regulador de Potencia Reactiva
Consigna de factor de Potencia/Q basado en consigna interna, externa o por calendario con valores referidos a Pcc. Limites Parque Elico: Capacidad de Produccin Mquinas Disponibles
Priorizar siempre los equipos de compensacin de reactiva en Subestacin tales como STATCOM/SVC/SR
03/11/11 Mxico D.F
21
2. Regulacin de Tensin
Consigna de V/Q o factor de Potencia basado en consigna interna, externa valores referidos a Pcc. Limites Parque Elico: Capacidad de Produccin Mquinas Disponibles Priorizar siempre los equipos de compensacin de reactiva en Subestacin tales como STATCOM/SVC/SR Limites del Aerogenerador: Curvas PQTV 03/11/11 Mxico D.F
Estrictamente confidencial & uso restringido / Strictly confidential & limited use
22
2. Regulacin de Tensin
Resultados de pruebas: modo control de Q
23
2. Regulacin de Tensin
Modo control QV (UK, Espaa PO12.2)
24
2. Regulacin de Tensin
Modo control V directo (Irlanda)
25
2. Regulacin de Tensin
En la Regulacin de Tensin puede intervenir un componente esencial Regulador de tomas automtico en Carga OLTC La Regulacin de Tensin se puede hacer de tres formas distintas: 1. Los dos Reguladores reciben la misma consigna. 1. OLTC primero a la posicin ms cercana posible 2. Se activa regulador de parque, utilizando las mquinas para ajuste fino. Se emplea siempre que el regulador de tomas no haya llegado a los lmites. 2. Regulador del OLTC a posicin 1pu 1. Activacin regulador de Parque 2. Cuando el Regulador de Parque est activo, el regulador OLTC no se permite cambio tomas. Se emplea siempre y cuando el regulador de parque tenga capacidad de mover la tensin entre el 0,95 y 1,05. 3. Combinacin de las dos anteriores
03/11/11 Mxico D.F
Estrictamente confidencial & uso restringido / Strictly confidential & limited use
26
3. Regulacin de Frecuencia
La Energa Elica no participa actualmente en la regulacin primaria. Podra participar de la regulacin primaria a bajar fcilmente. Debera participar de la regulacin primaria a subir en momentos singulares Su presencia exige un mayor empleo de la regulacin secundaria/terciaria Estabilidad a largo plazo basado en la prediccin para el control de la Potencia Activa
03/11/11 Mxico D.F
Estrictamente confidencial & uso restringido / Strictly confidential & limited use Copyright 2009 Gamesa Corporacin Tecnolgica, S.A.
27