Items that are intended to stay in as part of your document are in bold; explanatory comments are in italic text. Plain text is used where you might insert wording about your project.
This document is an annotated outline for a Software Verification and Validation Plan, adapted from the IEEE Standard for Software Verification and Validation Plans (Standard 1012), and the IEEE Guide for Software Verification and Validation Plans (Guide 1059).
Tailor as appropriate. Where you decide to omit a section, you might keep the header, but insert a comment saying why you omit the element (e.g., This section is not applicable to the plan.)
Q:\IRM\PRIVATE\INITIATI\QA\QAPLAN\SVVPLAN.doc
Version: (n)
Q:\IRM\PRIVATE\INITIATI\QA\QAPLAN\SVVPLAN.doc 2
Date: (mm/dd/yyyy)
01/17/01
TABLE OF CONTENTS
1. PURPOSE
2. REFERENCED DOCUMENTS
3. DEFINITIONS
4. VERIFICATION AND VALIDATION OVERVIEW 4.1 Organization 4.2 Master Schedule 4.3 Resource Summary 4.4 Responsibilities 4.5 Tools, Techniques, and Methodologies
5 5 6 6 7 7
5. LIFECYCLE VERIFICATION AND VALIDATION 5.1 Management of V&V 5.2 Concept Phase 5.3 Requirements Phase 5.4 Design Phase 5.5 Implementation Phase 5.6 Test Phase 5.7 Installation and Checkout Phase 5.8 Operation and Maintenance Phase
7 7 8 9 9 10 11 11 12
6. Reporting
12
Q:\IRM\PRIVATE\INITIATI\QA\QAPLAN\SVVPLAN.doc
01/17/01
7. Administrative Procedures 7.1 Anomaly Reporting and Resolution 7.2 Task Iteration Policy 7.3 Deviation Policy 7.4 Control Procedures 7.5 Standards, Practices, and Conventions 13
13
13 13 14 14
8. Plan Approvals
14
Q:\IRM\PRIVATE\INITIATI\QA\QAPLAN\SVVPLAN.doc
01/17/01
1. PURPOSE
(NOTE 1: THE SOFTWARE VERIFICATION AND VALIDATION PLAN GUIDELINES WERE DERIVED AND DEVELOPED FROM IEEE S TANDARD FOR SOFTWARE VERIFICATION AND VALIDATION (STANDARD 1012) AND THE IEEE GUIDE FOR SOFTWARE VERIFICATION AND VALIDATION PLANS (GUIDE 1059)). (Note 2: The ordering of Software Verification and Validation Plan (SVVP) elements is not meant to imply that the sections or subsections must be developed or presented in that order. The order of presentation is intended for ease of use, not as a guide to preparing the various elements of the Software Verification and Validation Plan. If some or all of the content of a section is in another document, then a reference to that material may be listed in place of the corresponding content.)
(The Purpose section of the Software Verification and Validation Plan defines the purpose, scope, and goals of the plan. The software project must be identified and the specific software product items, covered by the plan, must be identified. The specific goals of the verification and validation effort must be specified. The SVVP purpose section provides the highest level description of verification and validation efforts. The following topics must be addressed: Project identification, Plan goals, Summary of verification and validation efforts, Responsibilities conveyed with the plan, Software to be verified and validated, Identification of waivers and changes to organization standards, and SVVP assumptions.)
Software verification and validation (V&V) is a disciplined approach to assessing software products throughout the software development life cycle. Verification and validation strives to ensure that quality is built into the software and that the software satisfies business functional requirements. Software verification and validation employs review, analysis, and testing techniques to determine whether a software product and its intermediate deliverables comply with requirements. These requirements include both business functional capabilities and quality attributes.
Q:\IRM\PRIVATE\INITIATI\QA\QAPLAN\SVVPLAN.doc 3 01/17/01
The objectives of the V&V effort are to find defects and to determine if required functions and attributes are built into the software system. V&V activities are designed to support: 1. Verification that the products of each software life cycle phase: Comply with previous life cycle phase requirements and products for correctness, completeness, consistency, and accuracy, Satisfy the standards, policies, practices, procedures, and conventions of the phase, and Establish the proper basis for initiating the next life cycle phase.
2. Validate that the completed end product complies with established software and system requirements.
Verification and validation provide management with insights into the state of the project and the software products, allowing for timely change in the products or in the software development life cycle approach.
(Verification and validation effort is typically applied in parallel with software development and support activities. Verification and validation planning may be broken down into the following steps: Identify the V&V scope, Establish specific objectives from the general project scope, Analyze the project input prior to selecting V&V tools and techniques, Select tools and techniques, and Develop the Software Verification and Validation Plan (SVVP)).
2. REFERENCE DOCUMENTS
(This section shall identify the binding compliance documents, documents referenced in the plan, and any supporting documents required to implement, or supplement, the SVVP. Ensure that the reference document list is consistent with other project documentation. Ensure that all documents listed in the plan are referenced. Specify documents completely
Q:\IRM\PRIVATE\INITIATI\QA\QAPLAN\SVVPLAN.doc 4 01/17/01
Software Verification and Validation Plan including the version and date reference.)
Q:\IRM\PRIVATE\INITIATI\QA\QAPLAN\SVVPLAN.doc
01/17/01
3. Definitions
(The definition section provides a reference to the definition of all terms required to properly interpret the SVVP. This section also notes acronyms and notations used in the plan. Include only terms necessary for understanding the SVVP. Refer to other project documentation for a comprehensive list of project definitions (e.g., Software Project Management Plan, Software Quality Assurance Plan). For SVVP purposes, the following definitions apply:) SVVP Software Verification and Validation Plan. Validation The process of evaluating software at the end of the software development process to ensure compliance to software requirements. Verification The process of determining whether or not products of a given phase of the software development process fulfill the requirements established during the previous phase. V&V Verification and validation.
4.1 Organization
(Define the relationship of verification and validation to other efforts such as development, project management, quality assurance, and configuration management. Define the lines of communication within the verification and validation effort, the authority for resolving issues, and the authority for approving verification and validation deliverables.)
Q:\IRM\PRIVATE\INITIATI\QA\QAPLAN\SVVPLAN.doc
01/17/01
Software Verification and Validation Plan (The specific organization structure of the V&V effort will depend on the nature of the system under development, the developing organizations, and any contractual arrangements.)
Q:\IRM\PRIVATE\INITIATI\QA\QAPLAN\SVVPLAN.doc
4.4 Responsibilities
(Identify the organization responsible for performing verification and validation tasks. There are two levels of responsibility general responsibilities assigned to different organizations and specific responsibilities for the V&V tasks to be performed should be assigned to individuals. General responsibilities should be supplemented with specific responsibility for each task in the verification and validation plan.)
Software Verification and Validation Plan Risks and assumptions, and Roles and responsibilities.
(In addition, all sub-sections of this major heading (5) must specifically address all seven of the topics noted above.) (For all software projects, the Management of Verification and Validation section must include the following minimum tasks: Software Verification and Validation Plan Generation, Baseline Change Assessment, Management Review of V&V, and Review Support.)
(Initiate the Software Verification and Validation Plan during the Concept phase of the project life cycle. However, verification and validation planning may be dependent on things outside of your control. Therefore, V&V planning may be most effectively performed in conjunction with the overall software development planning effort. The SVVP is often best developed incrementally.) (Evaluate proposed software changes for effects on previously completed V&V tasks. The request for baseline change assessment should be formally documented in a change proposal.) (Conduct periodic reviews of V&V efforts, technical accomplishments, resource utilization, future planning, and risk management. Management review comprises all of the general responsibilities of management for monitoring, controlling, reporting, and managing the plan.) (Identify key review support milestones. Correlate V&V task results to support project management and technical reviews.)
Software Verification and Validation Plan concept phase should establish that the objectives of the system define the user needs to be addressed and the technical and business advantages to be expected.)
Software requirements traceability analysis, (Trace SRS requirements to system requirements in concept documentation. Analyze identified relationships for correctness, consistency, completeness, and accuracy. Do the requirements completely satisfy the capabilities specified in the concept document?) Software requirements evaluation, (Evaluate SRS requirements for correctness, consistency, completeness, accuracy, readability, and testability. Assess the technical merits of the requirements.) Software requirements interface analysis, (Evaluate the SRS with hardware, user, operator, and software interface requirements documentation for correctness, consistency, completeness, accuracy, and readability Ensure that all external interfaces to the software and internal interfaces between software functions are complete and correctly specified.) and Test plan analysis for - System test, and - Acceptance test.)
Software Verification and Validation Plan (This section of the plan shall address the seven topics identified in section 5.1 of this document. For critical software, design phase V&V will include the following tasks:
Software design traceability analysis (Trace design documentation to requirements. Analyze identified relationships for correctness, consistency, completeness, and accuracy.), Software design evaluation (Evaluate design for correctness, consistency, completeness, accuracy, readability, and testability. Assess the technical merits of the requirements and compliance to organization standards.), Software design interface analysis, (Evaluate design with hardware, operator, and software interface requirements documentation for correctness, consistency, completeness, accuracy, and readability At a minimum, analyze data elements at each interface.) and Test design generation Component test plan, and Integration test plan.)
Source code traceability analysis (Trace source code to design specification and assess correctness, consistency, completeness, and accuracy.), Source code evaluation (evaluate source code for correctness, consistency, completeness, accuracy, and testability. Assess code quality and compliance to organization standards.), Source code interface evaluation (Evaluate source code with hardware, operator, and design documentation for correctness, consistency, completeness, and accuracy.), Source code documentation evaluation (Evaluate draft code-related documents with source code to ensure completeness, correctness, and consistency.), Test case generation for:
11 01/17/01
Q:\IRM\PRIVATE\INITIATI\QA\QAPLAN\SVVPLAN.doc
Test procedure generation for: - Component test - Integration test and - System test, Component test execution.)
Acceptance test procedure generation, (Develop test procedures for acceptance test) and Test execution - Integration test, - System test, and - Acceptance test.)
Installation configuration audit, (Audit installation package to determine that all software products required to correctly install and operate the system are present and correct), and Final V&V report generation, (Summarize all V&V activities and results including the status and disposition of anomalies in the V&V final report).)
Q:\IRM\PRIVATE\INITIATI\QA\QAPLAN\SVVPLAN.doc
12
01/17/01
6. Reporting
(This section describes how the results of implementing the SVVP will be documented. Verification and validation reporting will occur throughout the software life cycle. Specify the content, format, and timing of all verification and validation reports. The required V&V reports include: Anomaly reports, Task reporting, Phase summary reports, and Final report.)
Q:\IRM\PRIVATE\INITIATI\QA\QAPLAN\SVVPLAN.doc
13
01/17/01
7. Administrative Procedures
(This section should identify any existing administrative procedures that are to be implemented as part of the SVVP. Verification and validation efforts consist of both management and technical tasks. At least three audiences should be identified for the V&V information personnel performing the V&V tasks, personnel performing development tasks, and management.)
Software Verification and Validation Plan the plan must also be identified.)
8. Plan Approvals
(Identify the plan approvers. List the name, signature and date of plan approval.)
Q:\IRM\PRIVATE\INITIATI\QA\QAPLAN\SVVPLAN.doc
15
01/17/01