Construction of back-up facilitates for NCT berths No. 4 & 5. Capital dredging and Bank Protection Work with jetty facilities in Karnaphuli River from 3rd Karnaphuli Bridge to Sadarghat jetty. Construction of Inland Container Terminal at Pangaon. Replacement of River Mooring No. 4 by Dolphin Jetty.
B. MID TERM
Construction of Exposition-cum-Convention Centre. (Land acquisition under process). Construction of Karnaphuli Container Terminal at Jetty No.11,12, & 13. Construction of Multi-storied Staff Quarter (Consultant submitted design, drawing and estimate. DPP under preparation). Replacement of River Mooring -3 by Dolphin Jetty. Construction of Laldia Bulk Terminal. Procurement of one Floating Crane. Procurement of one Dredger (DPP under Preparation). Procurement of One Rescue-Cum-Ambulance Ship(DPP under Preparation). Replacement of Tugboat Kandari-6 (DPP under Preparation). Replacement of Pilot Vessels (P.V. Dishari and Prahari). Construction of CPA Hospital Complex. Construction of Multi-storied Officers Quarter. Construction of CPA new Rest House beside the existing Rest House.
C. LONG TERM
Construction of Multi-purpose Berth with Backup facilities in place of Jetty No.7-10. Construction of Over Flow Yard at New Mooring Area. Construction of Overflow Yard in Place of CPA South Residential Area.
Introduction of Computerized ContainerTerminal Management Estate Management System. System(CTMS). Personnel Management (Under trial run.) Information System (PMIS).
--
--
initiatives
Appointment of Private Terminal Operator for Operation & Management of NCT on SOT basis. Appointment of Private Terminal Operator for Operation of Pangaon ICT.
--
Feasibility Study for Construction of one new ICD near Dhirasram Railway Station in Gazipur District. Port Efficiency Improvement Plan (PEIP). Techno-Economic Feasibility Study for Deep Sea Port in Bangladesh.
Feasibility Study for Construction of Karnaphuli Container Terminal(KCT) Awaiting Financial offer from BRTC/BUET for appointment as consultant. Feasibility Study for Construction of Laldia Bulk Terminal (Consultant will submit final report shortly).
A. SHORT TERM
Carry out Hydraulogical/Geomorphological Study and Preparation of a Strategic Master Plan jointly by CPA and ADB. (Coordination with ADB is in progress) Study for Construction of Exposition-cumConvention Centre. (TPP sent for Govt. approval. Land acquisition under process). Feasibility Study for Procurement of one Floating Crane (TPP prepared).