You are on page 1of 5

AHMAD ZAKY Hp : 081363 209 264 e-mail : adzkiy_m2k@yahoo.com Home : Puskopkar Blok C16. No.18 Batu Aji.

Batam

Date of Birth: June 22nd 1981 Marital Status: Married Nationality: Indonesian Education: Bachelor Degree in Mechanical Engineering of Andalas University (GPA: 3.06) Qualifications: CSWIP 3.0 (Cert. No. 38343 Exp. Date : May 29th 2013) Certified Radiographic Interpreter ASNT Level II (Cert. No. RI09049 Exp. Date May 15 2014) Project Records: Anchor Handling Supply Vessel 120 ton BP; Shell Eastern Petroleum Co. Methyl Ethylene Glycol; Exxon Mobils Singapore Parallel Train; SAIPEM Installation Aids Chimsao Project; and Van Oord Dreging Sand Carrier Modification #106. Proficient in Isometric reading, Auto Cad and Microsoft Office.

OBJECTIVE Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people from all over the world, to achieve the goals as a key player in challenging & creative environment independently as well as a team. SUMMARY Having more than 3 years experiences of inspection, testing and documentation involving in Shipyard Industries, Petroleum Refineries (Piping Process) and Pressure Vessel Fabrication. Quality Assurance/Quality Control inspection activities (from PQR-WPS-WQT and any method of NDT and NDE required for client satisfaction), monitoring under spec of project. Well Versed with various fabrication codes and Standards such as AWS D1.1, ASME B31.3, ASME VIII and ASME IX. Conversant with fabrication, welding and inspection (before, during and after welding) requirements of various materials like Carbon Steel (common CS and LTCS), Stainless Steel and Chrome-Molly. Well understanding of various kind of drawing, like : Isometric, Key Plan and Elevation. Familiar in using several kind of welding and measurement tools (such as: Welding Gauge, Hi-lo Gauge, Water level, Vernier Caliper, Micrometer, Pressure Gauge and Densitometer). Good Installation knowledge of several kind of valve based on Isometric (Gate, Globe, Ball, Butterfly and Check valve) and Pipe Supports (Dummy, Trunnion, Shoe and SPS).

PROFESSIONAL TRAINING AND SEMINAR No 1. 2. 3. Description ERP System Safety Stand Down : Fire Hazard Identification and Prevention Radiographic Interpreter ASNT Level II. Duration 8 Hours 6 Hours 1 Months (60 Hours) Conducted By PT. Ninda Pratama Vriesindo PT. Mc Connell Dowell Services Indonesian Institute for Non Destructive Testing, Batam PT. Dua Utama Jaya, Batam PT. Batamec Shipyard PT. Batamec Shipyard PT. Nippon Steel QC Engineer (Mr. Novwan Nazar) Remarks In House In House Certified Cert. No: RI09049 Exp. Date: May 15th 2014 Certified Cert. No: 38343 Exp. Date: May 29th 2013 In House In House Certified

4.

CSWIP 3.0 TWI Visual Welding Inspector

4 Days (20 Hours)

5. 6. 7.

Ship Building System and 40 Hours Process Internal Auditor ISO 20 Hours 9001 Piping Inspector Seminar 3 Days (24 Hours)

WORKING EXPERIENCES Last Company Company : PT. Ninda Pratama Vriesindo Period : Since February 2010 until July 24th 2010 Position : QC Engineer Projects (Client) : 1. Installation Aids Chimsao Project (SAIPEM APAC) 2. Sand Carrier Modification #106 (Van Oord Dredging) Duties and Responsibilities : Welding Procedures Review, Inspection Test Plans, and Quality Assurance Procedures as per Client specification. Fit Up and Visual Welding Inspection complete with reporting. NDT Mapping, Welding Traceability recording. Dimensional Check and Reporting. Review NDT Reports (Radiographic Testing), interpret the RT Film and release the tracing if necessary. Witnessing Hydro test activity, and document completion for client.

Company : PT. McConnell Dowell Services Period : May 2009 till February 2010 Position : QC Inspector Project : Exxon Mobils Singapore Parallel Train. Client : FWP Duties and Responsibilities : Check the material used like Carbon Steel (common CS and LTCS), Stainless Steel and Chrome-Molly as stated in Isometric. Fit-up Inspection using Isometric. Visual welding inspection as per client spec and ASME B31.3 acceptance criteria. Daily Progress Reporting and documentation for Fit-Up and Visual welding inspection. Reason for leaving is Job Completion. Company : PT. Rotary Engineering Indonesia Period : May 2008 to May 2009 Position : QC Inspector Project : Shell Eastern Petroleum Co. Methyl Ethylene Glycol Client : FW Energy Ltd. Duties and Responsibilities : Establishing Welding Procedures, Inspection Test Plans, Quality Assurance Procedures as per Client and Project requirements. The Implementation of welding procedures and project specifications controlling. Fit-up And Visual welding inspection as per client spec and ASME B31.3 acceptance criteria. Reviewing PMI, NDT and PWHT reports. Preparation and qualification of WPS according to ASME IX. Welder & Welding operator qualification (WQT). Welding consumables control (reviewing test certificates, storage and quivers) Documents completion coordinator. Reason for leaving is Job Completion. Company : PT. Batamec Shipyard Period : May 2007 to May 2008 Position : Management Trainee (Asst. QC Engineer) Project : 120 Ton BP AHSV, African Fjord Accommodation Barge Client : Robert Knutzen Offshore Duties and Responsibilities : Inspection & Test Plan preparation documents and propose to QC Engineer. Running PQR data preparation, records and witnessing mechanical test. WPS release form preparation as per PQR approved by QC engineer, client and third party. Fit Up and Visual Welding Inspection (under AWS D1.1 Welding Code). Welder and welding operator qualification (Witnessing and database record) until release the Certificates and ID cards.

Design and witnessing of hydro / Air test. Reason for leaving: Get more challenge in more welding codes environment. Company : PT. Skemanusa Consultama Teknik Period : Aug 2006 to May 2007 Position : Plumbing Engineer Duties and Responsibilities : Plumbing and Fire fighting System Design, Calculation and Estimating. Plumbing and Fire fighting Equipments Sizing and selection (Pumps, PFE, Sprinklers). Check and propose the Design (drawing) from Design Concept, Design Development and Design for Construction. Brainstorming activity on site of project about Plumbing Installation constraints.

Expected Salary is 2000 SGD REFERENCES 1) Bimo Lawaning P Senior QC Inspector PT. McConnell Dowell Service HP: 08566713006 2) M. Agus Suherman Client Inspector Foster Wheeler UK for SEPC MEG Project HP: 0811698797 3) Mike Tan Senior QA/QC Inspector Rotary Engineering Ltd HP: +6596615963 4) Ahmad Syarifuddin QA/QC Manager PT. Rotary Engineering Indonesia HP: 081364694551 5) Heri Rudianto QC Engineer PT. Batamec Shipyard HP: 08127009367 I hereby certify that all the information above is correct to my knowledge and experience.

You might also like