You are on page 1of 51

Step by Step MM-CIN Training Documentation

Topics covered: 1. 2. 3. 4. 5. Excise Transactions Capital Goods Purchase Returnable/ Non Returnable Gate Pass Import Purchase Cycle Vendor Return & Excise Reversal

1 1.1 1.1.1

COUNTRY INDIA VERSION Procedure for Claiming CENVAT for Raw Materials Create the Purchase Order (ME21N)

Follow standard PO creation process 1.1.2 Gate Entry (/cvs/gnt01)

Enter the PO No in the Field, and then all the items against the Po will be shown. Enter the Relevant Quantity, Enter the LR no, Vehicle No, Vendor Excise No, In the Text Enter the Transporter Name. Security ID Select from the Drop Down Menu.

1.1.3Goods Receipt to Unrestricted (Movement type: 101) Menu Path: Logistics Materials Management Inventory management Goods movement goods receipt for purchase order Purchase order no. Known (MIGO) a. Enter the PO number and click on Execute button as shown below.

b. Enter the Gate Entry No It will show the gate Entry Quantity of the in the Quantity tab in field Quantity in Unit of entry. c. Enter receiving Storage Location in Where tab. Here check the stock type in which material is going to receive. If some text needs to be added regarding the goods receipt enter it in Text field. If it subjected to batch Management then enter the Vendor Batch No as well as In-house batch no. If you want to Split the Quantity then Click on, Then Enter the Batch, Quantity etc. After doing all these thing go to Classification Enter all the Parameter.

d. Click on Item OK Checkbox at this point of time system will show relevant information of excise for which Excise Invoice tab will appear in the Header screen as shown below, select Only Capture Excise Invoice on this tab and put the Vendor Excise Invoice no check the Excise group. e. Check the Excise Details related to the received material in Excise Item tab in Detail Data screen as shown below.

Press Post button to save the Goods receipt, system will generate the Goods receipt Document. System will automatically update the Part I register as soon as the GR is made. 1.1.2 Post the Captured Vendors Excise Invoice

Go to CIN transaction Menu Path: User menu Indirect taxes Procurement Excise invoice Incoming Excise invoice Individual Processing Capture/Display (J1IEX) a. Select Post Excise Invoice and Vendor in windows above the Header.

b. Enter Goods Receipt Document number generated in STEP 2 and press ENTER or Click on Execute button. c. Following screen will appear as shown below.

d. Enter Vendor Excise Invoice Number, Excise Invoice Date, Excise group (or any other appropriate excise group). e. If material had directly came from different vendor, Enter vendor code in Ship from field in miscellaneous tab. If Excise Invoice is faulty and still want to take the credit for the excise invoice, enter the rejection code.

f.

g. Check the Material Chapter Heading, Material type in Item tab in Detail Data screen. h. Check the Quantity in Quantity tab

i.

Check the Duty rate in Duty rate tab.

j.

Check duty values and Tax amount for the material in Duty value tab.

k.

Check the Part I entries, which are created immediately after the GR in Part I tab.

Tick the Item OK check box and Press

button to check the entries.

After Check Click on Simulate Button to check the G/L Entries.

Press save button to post the entry, Excise Invoice will be captured and following screen for information will be displayed.

1.1.3 Display Excise Invoice


Menu Path: User menu Indirect taxes Procurement Excise invoice Incoming Excise invoice Individual Processing Change/Display/Post/Cancel (J1IEX) Select Display and Vendor Excise Invoice in windows above the Header. Here you can display both the Part I and Part II entries in one document only. Check the Excise registers in which entry is made.

1.2 1.2.1

Procedure for claiming CENVAT for Capital Items Create the Purchase Order for Capital goods

Follow standard PO creation process and note the following things In the Account assignment category enter F.

The system will prompt to put the Order no as well as G/L account no in the account assignment tab. All the other details like VAT or CST you will have to maintain. Maintain the Tax code.

Save the purchase order. 1.2.2 Goods Receipt to Unrestricted (Movement type: 101)

Menu Path: Logistics Materials Management Inventory management Goods movement goods receipt for purchase order Purchase order no. Known (MIGO) a. Enter the PO number, Vendors Delivery Challan Number

b. Press Enter at this point of time system will copy all the relevant information from PO and a Excise Invoice tab will appear in the Header screen as shown below, select capture Excise Invoice on this tab and check the Excise group. c. Enter the Received Quantity in the Quantity tab in field Quantity & Unit of entry. Follow above procedure for claiming modvat for raw material. d. Enter receiving Storage Location in Where tab. Here check the stock type in which material is going to receive. If some text needs to be added regarding the goods receipt enter it in Text field. Follow above procedure for claiming modvat for raw material. e. Check the Excise Details related to the received material in Excise Item tab in Detail Data screen as shown above.

f. Check the Item OK check box and press Check button in tool bar to check the entries

g. Press Post button to save the Goods receipt, system will generate the Goods receipt Document. System will automatically update the Part I register as soon as the GR is made. l. Press Enter, following screen will appear Post the Captured Vendors Excise Invoice

1.2.3

Go to CIN transaction Menu Path: User menu Indirect taxes Procurement Excise invoice Incoming Excise invoice Individual Processing Capture/Display (j1iex) a. Select Post the Excise Invoice and Goods Receipt in windows above the Header.

b. Enter Vendor Excise no generated above. If material had directly came from different vendor, Enter vendor code in Ship from field in miscellaneous tab. a. If Excise Invoice is faulty and still want to take the credit for the excise invoice, enter the rejection code.

b. Check the Material Chapter Heading, Material type in Item tab in Detail Data screen. c. Check the Quantity in Quantity tab

d. Check the Duty rate in Duty rate tab.

e. f.

Check duty values and Tax amount for the material in Duty value tab. Check the Part I entries, which are created immediately after the GR in Part I tab.

h.

Tick the Item OK check box and Press

button to check the entries.

i.

Press save button to post the entry, Excise Invoice will be captured and following screen for information will be displayed.

1.2.4Display Excise Invoice Menu Path: User menu Indirect taxes Procurement Excise invoice Incoming Excise invoice Individual Processing Change/Display/Post/Cancel Select Display and Vendor Excise Invoice in windows above the Header. Here you can display both the Part I and Part II entries in one document only. Check the Excise registers in which entry is made.

1.4

Sub-contracting without Payment of Excise Duty

When you issue materials to a subcontractor, you need to keep track of what materials you have issued and when they have to be returned by. The reason for this close monitoring has to do with Indias tax law. Under excise law 57AC, when you send materials to a subcontractor for processing, you are not required to pay any excise duty, even though the materials have left your premises. However, if the materials have not been returned to you within a given length of time specified by the law (in 2000, 180 days), you will have to reverse any excise credit that you posted when you purchased the materials. In the case of materials that you have manufactured in-house, you will have to post credit entries to the extent of the CENVAT rate of the assessable value of the materials. 1.4.1 Create Sub-Contracting Purchase order with Reference of Purchase Requisition To create a subcontract order, proceed as follows: 1. Purchase Requisition will create automatically through Maintenance Order (IW31) 2. Purchase Requisition will have the reference of Maintenance Order. 3. Create Purchase Order with reference of Purchase Requisition (ME21N)

4. Release the Purchase Order (ME28)

4. Check and Save the Purchase Order. 1.4.2 Create Gate Pass (Returnable/ Non Returnable) for the materials sent out for Fabrication/ Servicing/ Irradiation, etc

1. Enter Transaction code ZRGP on comm.-and field

2. Select Create from Pull down list, Issue and Purchase Order from another pull down list. 3. Enter the subcontracting purchase order number 4. Enter all the details in the header 5. After posting Gate Pass, to take Print Out, Choose Display Issue Gate Pass in ZRGP only, here put Gate Pass No. & press Enter then choose Edit Print, Here You can see Print Preview & then take print out.
1.4.3 Post Goods Receipt (MIGO) or Service Entry Sheet (ML81N)

Menu Path: Logistics Materials Management Inventory management Goods movement goods receipt for purchase order Purchase order no. Known (MIGO)

Enter the Purchase Order number & Create Service Entry Sheet as per the Method suggested in User Manual of Services.
1.4.4 Reconcile Gate Pass

1. Enter the Transaction code ZRPP on command field Enter the following data: 1.4.5 Gate Pass Reports

You use this report to get a list of Gate Pass (subcontracting challans). Depending on what selection criteria you enter, you can use it for finding out: Enter Transaction code ZRGP on Command Field a) Which challans are still with the subcontractor and are due back the following week b) Which challans you can make a re credit for c) Quantity issued to Vendor d) Quantity Received from Vendor

1.4.6 Change Gate Pass Enter the Transaction Code ZRGP on Command Field Enter the challan number select The challan is displayed. 1.4.7Display Gate Pass Enter the Transaction Code ZRGP on Command Field Enter the challan number select The challan is displayed. SUBCONTRACTING SCENERIO (SLITTING PURPOSE) Crate a PO putting Item Category L. Put the Material which will come from the Vendor Site. In the Component put the material, which you are providing to the Vendor.

Save the PO. Note the PO no. Then Goto MB1B Transaction Click on to Purchase Order. Put the Purchase Order. Then Click on Adopt Details.

Put The Batch No here, which you are going to provide to the Vendor. Then save it. Note Down the Material Document NO (490000000684)

If it is Excisable then Create a Subcontracting Challan (J1IF01). In Subcontracting challan creation put the Material Document which is created during the MB1B code(490000000684). Enter the Following thing.

If the Material Assessable Value isnt maintained then maintain it on J1ID.

Then Post the Document. After Doing all these thing Repeat the Step for creating a Returnable Gate Pass, which has been already described. Then Perform the Gate Entry as Mentioned above. Do the GR in MIGO (T code). Put the Purchase order no.

Enter the Quantity, Batch no for the Incoming as well as Consumed Material.

After doing all these thing Enter the vendor invoice No. Save the document. Material document will be generated. Note it down.

Reconciliation of Subcontracting Challan (J1IFQ) Enter the Material Document which was created during GR (5000000274)

1.5

Procedure for Claiming CVD benefit for Imported Material.

1.5.1 Create Purchase order for imports

Create a purchase order for the materials that you want to order using the standard procedure as mentioned in above documentation but when you fill out the item information.

Conditions tab Select the countervailing duty (CVD) condition . a. In the Rate field, enter the Rate of CVD that will be levied on the material when it arrives at customs.

b. In the Vendor field, enter the vendor master record that you have created for the customs office. To do this, select the CVD condition, which is marked by arrow, and then press button conditions tab. in the

Enter the custom vendor number in the vendor field.

The vendor ships the goods to you. When the goods arrive in India, they go through customs. The customs officers issue a bill of entry for the goods, which is in effect an invoice for the CVD on the goods. Once they have inspected the goods, they send them on to you. 1.5.2 Entering invoices for Bill of Entry (MIRO)

The goods arrive at your plant, together with the bill of entry. In order to record the bill of entry in the system The excise clerk enters an invoice for the bill of entry.

To enter the invoice for bill of entry follow standard invoice verification procedure but make sure you observe following
Header Data Basic data tab o o In the Amount field, enter the amount of countervailing duty (CVD) stated on the bill of entry in rupees. Also enter the amount of other custom duties if any. Do not enter any other taxes.

Details tab

Assuming you specified in the purchase order that the CVD was to be paid to the customs office, the system shows the customs office as the vendor. If not, enter the customs offices vendor master record in the Inv. party (Invoicing party) field.

Line Items On the PO reference tab, enter data as follows: Enter the number of the purchase order related to this delivery. If you only created one purchase order for the goods, enter the purchase order number and select planned delivery costs. If you sent more than one purchase order to the vendor and it sent you all of the ordered materials together in one shipment: i. ii. iii. iv. Choose .

Enter all of the purchase order numbers in the table. Select planned delivery costs. Select Deliveries and deselect Returns.

v.

Choose

Adopt.

In both cases, the system displays the line items in the line item overview For each line item: In the Amount field, enter the amount of CVD on the item (if you have more than one item, you may have to work the amount out manually). In the Quantity field, enter the quantity of goods on the invoice. Enter a zero-rated tax code.

Choose

Simulate.

A dialog box appears with a list of the postings that will be made to Financial Accounting (FI).

Choose

Post.

Note down the document number (CUSTOM Invoice number) Perform The Gate Entry Process As per above Mentioned 1.5.3 Capturing Excise invoice (Bill of Entry) (J1IEX)

Menu path: India Excise Invoice Procurement Localisation menu (J1ILN) Capture/Display. Individual Processing Incoming Excise Invoice In the top line: Select Capture Excise Invoice Select Purchase Order. Enter the purchase order related to the bill of entry. Choose A dialog box appears.

3. Enter the number of the invoice that you entered for the bill of entry and choose

If you need to enter any other purchase orders, enter the number in the top line as for step 3. Note that this time; you do not need to enter the invoice number. Enter other data as required. Note that the countervailing duty is displayed in the basic excise duty fields.

Enter the bill of entry number and date in the excise invoice number and Doc date field respectively. Capture The Excise Invoice By Entering the Vendor Excise Invoice no at the time of GR Post Cenvat (J1iEX) By Entering the Invoice no

After doing it, do the Simulation

After Simulation, the system posts the CENVAT (CVD Amount) and creates a corresponding entry in Part II or the appropriate excise register. 1.6 Creation of Excise Registers (J1I5)

You follow this procedure to create the excise registers. Three steps are to be followed for creation and printing of the excise registers 1.6.1 Updating of Registers (RG23 A).

The updating of registers includes receipts and issues.

The classification of receipts and issues is done by selecting the appropriate classification as per the table given below.

1.6.1.1 Receipt updating of Registers (RG23A) Menu Path: India Localisation menu (J1ILN) Indirect Taxes -> Registers ->Excise Tax -> Update RG 23A/C Issues and RG 1. On the selection screen, you specify Which documents you want to cover: o o Enter general organizational details in the Company details group box. Enter details about the documents that you want to include in the register, in the Document header and Document details group boxes.

Select movement type 101 and storage location. Also select appropriate classification type (RMA) in case of receipt from manufacture.

Select register RG23 A, in the Registers group box

Select

First select entries & click on Simulate The signal becomes

icon.

Then put tick in checkbox and select

for updating the register.

Register is updated and the screen looks as given below.

1.6.2

Data Extraction J2I5

Menu path: India localization menu Indirect taxes Registers Excise Tax Extract (J2I5)

On the selection screen enter the excise group, start date (of the month) and end date (of the month) and select the registers for which the data extraction is required.

Select

Following screen appears

1.6.3

Register printout J2I6

You use this report to print out your excise registers.

Menu path: India localisation menu indirect taxes Registers Excise Tax Print utility program (J2I6) On the selection screen select the registers which are to be printed.

Select
On the selection screen select the excise group, start date (of the month) and end date (of the month).

Select
Select suitable printer and print the register.

1.7

Procedure for creating Excise Invoice for vendor returns

1.7.1 Create Return Delivery Documents through MIGO


Menu Path: Logistics Materials Management Inventory Management Goods Movement MIGOGoods Movement (MIGO) Indicates the business transaction that you want to enter in the system and give the Original GRN Document number

Enter the Quantity to be return on Quantity Tab

Enter the Reason for movement on where Tab and movement type is 122 for Return Delivery to vendor

Select the Goods Issue Indicator IPD

In Excise Invoice tab Header Level, only Part I Entry will be maintained.

Check and Post the Document

1.7.3 Create and Post Excise Invoice for vendor with ref of Return Delivery Documents
Menu path: India localisation menu Indirect taxes Sales/Outbound Movements Excise Invoice For Other Movements Excise Invoice for Other Movements (J1IS) Here Click on Create Icon first to create Outgoing Excise Invoice Enter the Reference document number, Reference document type, Document year, and Series group, Excise group and Vendor number. For the material the Net Assessable Value, Base Value and all Excise duties will pick automatically from Vendors Excise Invoice captured & posted already at the time of GRN.

Press Enter, you will get next screen as below. Click on Create text icon to maintain following details 1. LR No. 2. Vehicle No.

Here select each option to maintain the desired data as following & click on Details icon. Here maintain desired data as per your requirement & save the text

Same way maintain data for remaining parts & come back also & save the excise invoice.

After saving you will get following result. Note down the Excise Invoice No.

To see the documents already posted, go to Display Mode

Here Enter Internal Doc. Generated in background for the Excise Invoice created.

Here click on accounting tab to see the Accounting Entries generated.

1.7.4 Print out of Excise Invoice (J1IV)


Menu path: India localisation menu Indirect taxes Sales/Outbound Movements Excise Invoice For Other Movements Post and Print (J1IV)

Enter the Series group, Output type JEXC (Standard) and Excise Transaction Type is OTHR and Execute

Select the Excise invoice number to get Print.

Click Print Icon to get the Print out or click display icon to see the Print Preview.

You might also like