ASME Professional Development 1-800-THE-ASME Eastern Regional Office 8996 Burke Lake Road - Suite L102 Burke, VA 22015-1607 703-978-5000 800-221-5536 703-978-1157 (FAX) Midwest Regional Office 1117 S. Milwaukee Ave. Building B - Suite 13 Libertyville, IL 60048-5258 847-680-5493 800-628-6437 847-680-6012 (FAX) Northeast Regional Office 326 Clock Tower Commons Route 22 Brewster, NY 10509-9241 914-279-6200 800-628-5981 914-279-7765 (FAX) International Regional Office 1-800-THE-ASME Southern Regional Office 1950 Stemmons Freeway - Suite 5037C Dallas, TX 75207-3109 214-746-4900 800-445-2388 214-746-4902 (FAX) Western Regional Office 119-C Paul Drive San Rafael, CA 94903-2022 415-499-1148 800-624-9002 415-499-1338 (FAX)
You can also find information on these courses and all of ASME, including ASME Professional Development, the Vice President of Professional Development, and other contacts at the ASME Web site... http://www.asme.org
Copyright 1999 by
TABLE OF CONTENTS
Part 1: PARTICIPANT NOTES.3 Part 2: BACKGROUND MATERIAL36 I. Introduction .... 37 II. Inspection and Testing Practices ....40 III. Inspection Frequency and Extent .45 IV. Evaluation and Analysis of Inspection Data ....49 V. Repairs, Alterations, and Rerating ....55 VI. Inspection of Buried Piping .....65 VII. Summary ..68 VIII. Suggested Reading ......69
Notes:
Course Outline
Introduction General Inspection and Testing Practices Inspection Frequency and Extent Evaluation and Analysis of Inspection Data Repairs, Alterations, and Rerating Inspection of Buried Piping Closure
2
Notes:
Notes:
Notes:
Definitions
Alteration - Physical change affecting pressure containing capability or flexibility - Work to restore piping system to be suitable for design conditions - Maximum permitted internal pressure for continuous operation at design temperature
Repair
MAWP
Notes:
Definitions (Cont.)
Rerate - Change in design pressure, design temperature, or both
Piping Circuit - Pipe section exposed to similar corrosivity, with similar design conditions and material
Notes:
Deadlegs Soil-to-air interfaces Erosion and corrosion/erosion Corrosion under linings and deposits Creep cracking Freeze damage
Notes:
* = Typical T M L
Figure 1
Notes:
CS systems operating in range 25-250F CS systems in intermittent service over 250F Deadlegs and attachments protruding from insulation
9
Notes:
Notes:
Insulation termination points Jacket seams on top of horizontal piping or improperly lapped/sealed jacket Bulges or staining of insulation or jacketing, or missing bands Carbon or low-alloy steel components in high-alloy systems
Notes:
Inspection Types
Internal visual Thickness measurement External visual Vibrating piping Supplemental inspection
Radiography AET
12
Thermography UT
Notes:
Misalignment Support condition Insulation condition Unrecorded field modifications or temporary repairs
Notes:
Notes:
10
Notes:
TML Selection
More TMLs:
Leak has high risk potential High potential for localized corrosion High CUI potential Higher corrosion rates Complex system
Fewer TMLs:
Low risk if leak Long, straight piping Relatively non-corrosive service
No TMLs:
Extremely low risk if leak Non-corrosive service
16
Notes:
11
Notes:
Pressure Testing
Normally not part of routine inspections
Some jurisdictional exceptions
Done per ASME B31.3 Normally a hydrotest Special considerations for stainless steel piping
18
Notes:
12
Other Inspections
Material verification and traceability Valve inspection Weld inspection Flanged joint inspection
19
Notes:
2 3
20
Services not in other classes Includes most process unit piping and selected off-site piping Flammable services that do not significantly vaporize when leak Services harmful to human tissue but located in remote areas
Notes:
13
Inspection Intervals
By Owner-user or inspector based on:
Corrosion rate and remaining life calculations Piping service classification Applicable jurisdictional requirements Judgment based on operating conditions, inspection history, current inspection results, conditions warranting supplemental inspections
21
Notes:
22
Notes:
14
Notes:
Insulated piping
Assess insulation condition Additional inspection if susceptible to CUI
24
Notes:
15
Notes:
75%
50%
50%
33%
3
26
25%
10%
Notes:
16
Notes:
Notes:
17
29
Notes:
Where: RL = Remaining life, years tact = Minimum measured thickness, in. (May average at test point) tmin = Minimum required thickness for location, in. Per B31.3 or detailed calculations.
30
Notes:
18
31
Notes:
CR (LT) = ( years between last and initial inspection s) CR (ST) = ( years between last and previous inspection s)
32
t initial t last
t previous t last
Notes:
19
Notes:
Example 1
Pipe treq tmeas = NPS 16, tinitial = 0.375 = 0.28 = 0.36, 0.32, 0.33, 0.34, 0.32
In operation 10 years
34
Notes:
20
Example 1 (Cont.)
Service Class 1 5-year interval CR/Maximum = CA/Available
0.375 0.32 = 5.5 x 10-3 in./yr. 10
= (0.32 - 0.28) = 0.04 in. 0.04 Maximum Interval = = 3.6 years 2 x 5.5 x 10 3 < 5 years Maximum thickness measurement interval = 3.6 years
35
Notes:
MAWP Determination
Based on applicable code (ASME B31.3) MAWP of system based on weakest component (e.g., pipe, flanges, valves, fittings, etc.) Unknown material - Calculate based on lowest grade material and joint efficiency of code MAWP calculation based on:
Actual measured thickness Double estimated corrosion until next inspection Allowances needed for other loadings
36
Notes:
21
Example 2
DP = 500 psig, DT = 400F
Pipe = NPS 16, STD weight, A-106 Gr. B, OD = 16 in. S CR = 20,000 psi, = 0.01 in./yr. E = 1.0 tmeas = 0.32 in. Next planned inspection - 5 years
37
Notes:
Example 2 (Cont.)
Estimated thinning until next inspection 5 x 0.01 = 0.05 in. MAWP = 2 S Et/D = 2 x 20,000 x 1 x [0.32 - 2 x 0.05]/16 = 550 psig > 500 psig OK
38
Notes:
22
Example 3
Same system as Example 2 Change next planned inspection to 7 years Estimated thinning until next inspection 7 x 0.01 = 0.07 in. MAWP = 2 S Et/D = 2 x 20,000 x 1.0 [0.32 - 2 x 0.07]/16 = 450 psig
39
Notes:
Example 3 (Cont.)
Not acceptable. Must either:
Reduce inspection interval Confirm maximum operating pressure will not exceed 450 psig before 7th year Renew pipe before 7th year
40
Notes:
23
Consider general and localized corrosion Consider increasing calculated value if high potential failure consequences
Unanticipated/unknown loads Undiscovered metal loss Resistance to normal abuse
41
Notes:
Notes:
24
Notes:
Recordkeeping Requirements
Owner-user responsibility Permanent/progressive records required To include:
Service Identification Inspection and test details and responsible individual Repairs (temporary and permanent), alterations, reratings done Maintenance and other events affecting system integrity
44
Classification Inspection interval Results of thickness measurements and other inspections and tests done Pertinent design information and piping drawings Date and results of external inspections
Notes:
25
Approval
Design, execution, materials, welding procedures, examination, testing to be approved by inspector or piping engineer Owner-user to approve on-stream welding Consult piping engineer before repairing service-induced cracks Inspector to approve all repairs/alterations at hold points and after completion
45
Notes:
Welded Repairs
Follow principles of ASME B31.3 or original construction code Temporary repairs
Full encirclement split sleeve or box-type enclosure (generally not for cracks) Fillet welded split coupling or lap patch if:
Localized deterioration SMYS < 40,000 psi Material matches base metal unless otherwise approved
46
Notes:
26
Defect repair
Remove defect to sound metal Deposit weld metal
47
Notes:
Notes:
27
Field Weld C L ts ts Backing Strip t Detail " 1 " Fillet Girth Weld Detail 2 Butt Weld for Seam
F ield Weld
Notes:
C L
Typ.
Typ.
Notes:
28
Notes:
Notes:
29
Non-Welded Repairs
Temporary onstream repairs of locally thinned sections, circumferential linear defects, flange leaks, etc. Bolted leak clamp or box Design must consider:
Control of axial thrust load if piping may separate Effect of clamping forces on pipe component Need for and properties of leak sealing fluids
53
Notes:
Notes:
30
Notes:
56
Notes:
31
PWHT
Per applicable code and welding procedure May be needed due to service Local PWHT may be possible
57
Notes:
Materials NDE
58
Notes:
32
Pressure Testing
Done if practical and deemed necessary by inspector Normally required after alterations and major repairs May use NDE instead after consultation with inspector and piping engineer
59
Notes:
Notes:
33
Rerating
Requirements to be met: Design calculations Inspection verifies condition and CA provided Safety valves reset All system components acceptable Records updated Meet original or latest code
61
Must be pressure tested unless already done at sufficient pressure Acceptable to inspector or piping engineer Piping flexibility adequate for design temperature changes Temperature decrease justified by impact test results
Notes:
Notes:
34
63
Notes:
Summary
Inspection, repair, alteration, rerating of inservice piping systems are normal activities Requirements and procedures are necessary to maintain piping system integrity API 570 is industry standard to be used
64
Notes:
35
36
I. Introduction
The structural integrity of piping systems must be maintained after they have been placed into service so that they will provide safe, reliable, long-term operation. Therefore, existing piping systems require periodic inspection to determine their current condition and permit evaluation of their structural integrity to permit future operation. Should unacceptable deterioration or flaws be identified, pipe repairs may be required. Existing piping systems might also require alterations or rerating to accommodate new operational needs (or to accommodate deterioration that cannot or will not be repaired). Process plants must adopt and follow established procedures for the inspection, repair, alteration, and rerating of piping systems after they have been placed into service. API 570, Piping Inspection Code Inspection, Repair, Alteration, and Rerating of In-Service Piping Systems, provides the basic procedures to be followed by process plants. This course is based on API 570. Scope of API 570 API 570 was developed for the petroleum refining and chemical process industries. But since most of its requirements have broad applicability, it may be used for any piping system. It must be used by organizations that maintain or have access to an authorized inspection agency, a repair organization, and technically qualified piping engineers, inspectors, and examiners (as defined in API 570). While API 570 applies to all petroleum refineries and chemical plants, its scope defines both specific included fluid services, and excluded and optional piping systems. Thus, API 570 requirements do not necessarily have to be applied to every piping system in a refinery or chemical plant. Included Fluid Service Unless identified by API 570 as being an excluded or optional system, API 570 applies to piping systems for process fluids, hydrocarbons, and similar flammable or toxic fluid services. Examples of these are the following: Raw, intermediate, and finished petroleum or chemical products. Catalyst lines. Hydrogen, natural gas, fuel gas, and flare systems. Sour water and hazardous waste streams or chemicals above threshold limits, as defined by jurisdictional regulations.
37
Excluded and Optional Piping Systems API 570 permits the following fluid services and classes to be excluded from its specific requirements. This is done to focus attention (with associated manpower and budget expenditures) on applications that would have the most significant consequences should a pipe failure occur. However, any of these excluded systems may be included in a plants API 570 program at the option of the owner. Fluid services that are excluded or optional include the following: Hazardous fluid services below threshold limits, as defined by jurisdictional regulatories. Water (including fire protection systems), steam, steam condensate, boiler feedwater, and Category D fluid services (as defined by ASME B31.3).
Classes of piping systems that are excluded or optional are as follows: Piping systems on movable structures covered by jurisdictional regulation (e.g., piping systems on trucks, ships, barges, etc.). Piping systems that are an integral part or component of rotating or reciprocating mechanical devices (e.g., pumps, compressors, etc.) where the primary design considerations and/or stresses are derived from the functional requirements of the device. Internal piping or tubing of fired heaters or boilers. Pressure vessels, heaters, furnaces, heat exchangers, and the fluid handling or processing equipment (including internal piping and connections for external piping). Plumbing, sanitary sewers, process waste sewers, and storm sewers. Piping or tubing with an outside diameter not exceeding that of NPS Nonmetallic piping and polymeric or glass-lined piping.
API 570 permits these services and systems to be excluded from its specific requirements to focus inspection, engineering, and maintenance resources on areas that would have the largest potential effect should leakage or failure occur. However, this should not be interpreted that these excludable or optional systems should be completely ignored. Furthermore, the consequences of a failure in some of these systems could be dangerous or unacceptable in particular circumstances. Therefore, owners may wish to include some of these services or systems in their API 570 program in all respects, and different requirements and procedures may be used for other services or systems. For example:
38
The failure of a high pressure steam or boiler feedwater system could have significant personnel safety consequences. An owner might include such services in his API 570 program. The failure of an NPS vent connection in an included fluid service could have significant personnel safety and economic consequences. An owner might wish to include such systems in his API 570 program.
Definitions API 570 contains definitions of technical terms that are used in the standard. The following are several of these terms used in this course: Alteration A physical change in any component that has design implications affecting the pressure containing capability or flexibility of a piping system beyond the scope of its design. The work necessary to restore a piping system to a condition suitable for safe operation at the design conditions. The maximum internal pressure permitted in the piping system for continued operation at the most severe condition of coincident internal or external pressure and temperature (minimum or maximum) expected during service. A change in either or both the design temperature or the maximum allowable working pressure. A section of piping that has all points exposed to an environment of similar corrosivity and that is of similar design conditions and construction material.
Repair MAWP
39
Several of these items are briefly discussed below. Injection Points Portions of a piping system that are in the vicinity of injection points may be subject to accelerated or localized corrosion. Such regions should be treated as separate inspection circuits and be thoroughly inspected periodically. API 570 provides suggested lengths of pipe upstream and downstream of the injection point that should be included in the injection point circuit. Figure 1 illustrates a typical injection point circuit.
40
Overhead Line
Greater of 3D or 12"
* * Injection point * * * Distillation Tower Injection point piping circuit * Overhead Condensers *
* = Typical TML
Typical Injection Point Circuit Figure 1 Systems Susceptible to CUI Piping systems may be subject to external corrosion under insulation (CUI) in situations where the integrity of the insulation system has been compromised. Therefore, special inspection attention should be paid to situations where CUI might be a concern. The following highlights areas and types of piping systems that might be more prone to CUI: Areas exposed to : Mist overspray from cooling towers Deluge systems Steam vents Process spills, moisture ingress, acid vapors
Carbon steel piping operating in the range 25F to 250F. Carbon steel piping operating intermittently above 250F. Deadlegs or other attachments protruding from insulation and at a different temperature than the active line. Austenitic stainless steel piping operating between 150F and 400F. Vibrating piping that may damage insulation jacketing. 41
Steam traced piping that may have leaking tracers. Piping with deteriorated coating or wrapping.
Locations Susceptible to CUI For systems that are susceptible to CUI, inspection efforts should be focused first on the most likely locations where corrosion might be found. The following summarizes such locations: Penetrations through or breaches in the insulation jacketing. Insulation terminations at flanges and other piping components. Damaged or missing insulation jacketing. Insulation jacket seams located on the top of horizontal piping. Improperly lapped or sealed insulation jacketing. Insulation termination points in vertical pipe. Caulking that has hardened, separated, or is missing. Bulged or stained insulation or jacketing, or missing bands. Piping low points in systems that have a breach in the insulation system. Carbon or low-alloy steel flanges, bolting, or other components under insulation.
Types of Inspection The particular type of inspection that is used depends on the details of the piping system, the service, and the type(s) of deterioration expected. Internal Visual. Only applicable for large diameter piping, by using remote inspection techniques, or at local areas that are accessible at openings. Thickness Measurement. Used to determine the extent of pipe thinning and may be done with the system either in or out of service. External Visual. Done to determine the condition of the pipe exterior, insulation, paint and coating systems. Also used to check for misalignment, leakage, or vibration.
42
Vibrating Piping. Excessive piping vibration should be reported to engineering for evaluation. Excessive pipe vibration or other line movement could result in leakage at flanged joints or threaded connections, or a fatigue failure. It should be remembered, however, that some amount of pipe vibration is normal. Supplemental Inspection. Other inspection methods may also be used based on the specific situation. These include radiography, thermography, acoustic emission testing (AET), or ultrasonic thickness surveys.
Thickness Measurement Locations (TMLs) TMLs are the specific areas in a piping circuit where inspections are made. TML locations and their number are selected based on the potential for localized or service-specific corrosion and the consequences should a failure occur. Pipe wall thicknesses are measured at test points within the TMLs, and the thickness readings may be averaged to arrive at a composite thickness reading at the TML. A test point is a circle having the following maximum diameters. Pipe Size NPS 10 > NPS 10 TML Selection The number and location of the TMLs must be based on the expected types and patterns of corrosion expected in the particular service. More TMLs Leak has high potential to cause damage High potential for localized corrosion High CUI potential Fewer TMLs Low risk if leak Large, straight piping No TMLs Extremely low risk if leak Non-corrosive service Relatively non-corrosive service Complex system Higher corrosion rates Circle Diameter 2 3
43
Thickness Measurement Methods The following thickness measurement methods are normally used. UT for pipe over NPS 1 RT for pipe NPS 1 Pit depth measurements for pitted areas using pit depth gauges
In all areas, appropriate inspection procedures must be used to obtain reliable results. Pressure Testing Except where local jurisdictions require it, pressure tests are not normally done as part of a routine inspection. When pressure tests are done (e.g., after alterations) they should be based on the following: Must meet ASME B31.3 requirements. Test fluid must be water unless this would have adverse consequences (e.g., freezing, process contamination, water disposal problem). Stainless steel piping requires special attention (e.g., potable water and blown dry).
Other Inspections Other inspections may also be required. Material verification and traceability. When alterations or repairs are made on low or high-alloy piping systems, the inspector must ensure that the correct materials are used. Valve inspection. Inspect valves for any unusual corrosion patterns or thinning. Valves in high temperature cyclic service might be subject to fatigue cracking. All subsequent pressure tests should be per API 598. Weld inspection. Welds are always inspected as part of new construction, repairs, and alterations. They are also sometimes inspected for deterioration as part of the normal inspection activity if problems are suspected. Flanged joint inspection. Flanged joints should be examined for signs of leakage. The cause of any leakage found should be determined. Special attention should be paid to flanges that have been clamped and pumped with sealant to stop leaks since the bolting might corrode and/or crack with time.
44
Inspection Intervals Inspection intervals are determined based on the following: Corrosion rate and remaining life calculations Piping service classification Jurisdictional requirements Judgment of inspector and piping engineer based on experience
The maximum interval between thickness measurements should be the lower of half the remaining life or what is specified in the following table:
45
The inspection intervals must be reviewed and adjusted as necessary based on the results of the thickness measurements that are made. Extent of Visual External Inspection External visual inspection should also be conducted at the same maximum intervals as are used for thickness measurements. Bare piping should be checked for: The condition of paint and coating systems External corrosion Other deterioration (e.g., leakage, damaged supports, etc.)
Insulated piping should be checked for: Damaged insulation or jacketing Signs of CUI for systems that might be subject to this
CUI Inspection Considerations After external visual inspection, additional inspection must be done for systems potentially subject to CUI. The additional inspection required depends on the pipe class and whether the insulation is damaged, as specified in the following table:
46
Pipe Class 1 2 3
Amount of follow-up NDE or insulation removal where insulation is damaged 75% 50% 25%
Amount of NDE at suspect areas on piping within susceptible temperature ranges 50% 33% 10%
The inspection may be expanded as necessary based on the initial results. Systems with a remaining life of over 10 years, or that are adequately protected against external corrosion, need not be included in the CUI inspection program. However, the condition of the insulation system should be periodically checked by operating personnel to identify signs of deterioration. Extent of Thickness Measurements Each thickness measurement inspection must obtain thickness readings from a representative sampling of TMLs in each circuit. The sampling should include data from the various components in the circuit and in different orientations (i.e., horizontal and vertical). TMLs with the shortest remaining life must be included. The inspection should obtain as many measurements as necessary to accurately assess the condition of the piping system. Extent of Other Inspections Other inspections are also required to adequately assess the condition of a piping system. Small-Bore Piping (SBP) [ NPS 2] Inspect SBP per the following: Service Primary Process Piping Secondary Process Piping Deadlegs Class All 1 2&3 2&3 Inspection Requirement Inspect per all requirements of API 570 Inspect per all requirements of API 570 Inspection is optional Inspect where corrosion was experienced or is anticipated
Note that while inspection is optional for Class 2 or 3 SBP, the owner must always consider the potential consequence should a leak develop in SBP that has not been inspected.
47
Secondary, Auxiliary SBP Inspection is optional for SBP associated with instruments and machinery. Consider the following in determining whether inspection will be done: Piping system classification Potential for environmental or fatigue cracking Potential for corrosion based on experience with adjacent primary systems Potential for CUI
Threaded Connections Threaded connections are inspected based on the same criteria as other SBP. TMLs for threaded connections should only include those that can be radiographed during scheduled inspections. Threaded connections that might be subject to fatigue damage (e.g., those associated with machinery systems) should be periodically assessed. Consideration may be given to using a thicker wall, adding bracing, and/or using a welded connection in situations where the potential fatigue damage is a concern.
48
Equation tact = Actual minimum thickness, in inches, determined at inspection tmin = Minimum required thickness, in inches, for the limiting section or zone
D1 = Time (years) between last and initial (nominal) inspections D2 = Time (years) between last and previous inspections
The long term and short term corrosion rates should be compared and the higher value used in the remaining life calculations. If there is a significant difference between the two corrosion rates, further evaluations should be made in an attempt to determine the cause. The remaining life of the circuit should be based on the shortest calculated remaining life.
Corrosion Rate Estimation
The expected corrosion rate must be estimated for new piping systems or for systems whose service has been changed. One of the following methods must be used to determine the probable corrosion rate. Data collected from other piping systems fabricated of similar material and in comparable service. Estimate based on the owner-users experience or from published data for similar material in comparable service. Make initial thickness measurements after no more than three months of service. Corrosion coupons or probes may be useful to help determine when thickness measurements should be made. Make additional thickness measurements as necessary until the corrosion rate is determined.
49
Based on the information provided, what maximum thickness measurement interval should be used for this system?
Solution:
The pipe service places this system into Class I. Therefore, the maximum interval cannot be more than 5 years based only on the service. Now check the remaining life criterion. CR/Maximum =
0.375 0.32 = 5.5 x 10-3 in./yr. 10
The MAWP of a piping system must be determined based on the requirements of the applicable piping code (i.e., ASME B31.3 in the case of process plant piping systems). The MAWP of the system is that of the weakest component within the system. Thus, in addition to the pipe itself, all other system components must be considered (e.g., flanges, valves, etc.). If the pipe material is unknown, the MAWP calculations must be based on the lowest grade (i.e., weakest) material and lowest weld joint efficiency that would be permitted by the code. The MAWP calculation is based on: The actual thicknesses determined by inspection. Double the estimated corrosion loss until the next inspection is done. Additional allowances that might be necessary in specific cases to account for applied loadings other than pressure.
The following examples illustrate calculation of the MAWP. Note that in both cases, only the pipe thickness is considered. 50
500 psig 400F A 106 Gr. B NPS 16 20,000 psi (from B31.3) 1.0 (A 106 Gr. B is seamless pipe) 0.32 in. 0.01 in./year 5 years 5 x 0.01 = 0.05 in. (from B31.3)
MAWP =
MAWP = 550 psig > 500 psig Since the MAWP exceeds the system design pressure, the system may remain in service at the design pressure without repairs, replacements, or rerating.
51
(from B31.3)
MAWP =
MAWP = 450 psig The MAWP is less than the design pressure. Therefore, either the inspection interval must be reduced, the operating pressure must not exceed 450 psig, or the pipe must be repaired or replaced.
52
The minimum required thickness of a piping system (i.e., the retirement thickness) must be determined considering all applicable design loads. The design pressure of the system will normally govern the minimum required thickness. However, local loading conditions (e.g., wind or earthquake, valve weights, local thermal displacement stresses, etc.) might govern the minimum required thickness in particular situations. Both general and localized corrosion must be considered. In cases where there are significant safety or economic loss consequences should a failure occur, it is prudent to increase the minimum required thickness above the calculated value. This additional allowance is meant to account for unanticipated or unknown loads, undiscovered metal loss, tolerance in the thickness measurements, and resistance to normal abuse. In all cases, the normal code design formulas and allowable stresses must be used.
Local Thin Area Evaluation
Local areas of a pipe may have thinned much more than the surrounding region. A conservative evaluation approach for such regions is to consider the locally corroded region in isolation and determine the minimum thickness there. If this approach produces an acceptable MAWP, then there is no need to go further. However, if the resulting MAWP is not acceptable, then a more detailed evaluation approach using one of the following methods may be used. ASME B31.G criteria. This simplified approach considers the maximum depth and length of the locally thin area, the pipe diameter, and nominal thickness to determine whether the thin area is acceptable. It intrinsically accounts for the additional strength that the surrounding uncorroded pipe provides to the thin area. ASME Section VIII, Division 2, Appendix 4 criteria. This is a detailed numerical stress analysis approach that permits a more exact calculation and evaluation of the local stresses. The basic code allowable stress (rather than the Division 2 allowable stress) is used in this analysis, but not less than 2/3 of the specified minimum yield stress (SMYS). Additional considerations are required if the design temperature is in the creep range of the material. Weld joint efficiency considerations. If the pipe has a longitudinal weld seam and its joint efficiency is less than one, the proximity of a thinned area to the weld is relevant.
53
If the thinned area is more than the larger of 1 inch or twice the measured thickness away from the weld, then weld joint efficiency does not need to be considered. If the thinned area is closer to the weld, then weld joint efficiency must be considered.
If a pipe cap is corroded, the location of the corrosion is relevant (i.e., in the knuckle region or central portion). The knuckle region of a cap requires a larger minimum thickness than the central portion.
Performing a piping stress analysis is not normally a part of inspection and maintenance. However, stress analysis considerations must still be kept in mind. The pipe must be adequately supported to carry its weight. Locations where supports have become damaged or are otherwise ineffective should be identified for further evaluation or repair. Adequate flexibility to accommodate thermal displacements must be provided. Identify situations where thermal expansion might be restricted (e.g., due to interference by adjacent items). The pipe must not vibrate excessively, since this could cause leakage at flanged joints and threaded connections, or cause a fatigue failure. A new stress analysis may be required if the design conditions are changed (e.g., due to equipment rerate) or if the system is modified (e.g., adding a new equipment item with associated piping to the system).
Recordkeeping Requirements
The owner-user is responsible for maintaining permanent and progressive records for all piping systems covered by API 570. These records form the basis for developing a cost-effective inspection and maintenance program. The records must include the following information: Service Identification Inspection and test details and responsible individual Repairs (temporary and permanent), alterations, reratings done Maintenance activities and other events affecting system integrity 54 Classification Inspection interval Results of thickness measurements and other inspections and tests done Pertinent design information and piping drawings Date and results of external inspection
All repairs and alternations must be done by a qualified repair organization (defined in API 570) and must be authorized by the inspector before beginning. Alterations must also be approved by a qualified piping engineer. The inspector may designate hold points during repairs and alterations to permit sufficient time for inspection. Additional approvals are required as follows: The inspector or piping engineer must approve the design, execution, materials, welding procedures, examination, and testing. The owner-user must approve all on-stream welding. The piping engineer should be consulted prior to weld repair of any cracks that occurred in-service. The purpose of this is to attempt to identify the cause of the crack and correct it. The inspector must approve all repairs and alterations at the designated hold points and at completion of the work.
Welded Repairs
Welded repairs are preferably done while the piping system is out of service. However, it may be possible to make weld repairs while the piping system is in operation in particular situations provided appropriate inspections, precautions, and hot work permit procedures are used. API 570 does not distinguish between shut down and on-stream repairs with respect to the specified requirements, and the owner must develop appropriate on-stream repair procedures. API 570 recognizes that it may be necessary to temporarily repair a piping system to permit its continued operation as fast as possible. Thus, a distinction is made between temporary and permanent repairs.
55
Temporary Repairs
A full encirclement welded split sleeve or a box-type enclosure may be installed over the damaged or corroded area (See Figures 2 through 4). The sleeve or box must be welded to the pipe at locations that are thick enough to remain intact during welding. A piping engineer must design these repairs. This method will typically not be used to repair longitudinal cracks in the pipe wall unless the piping engineer is convinced that the crack will not propagate from under the repair. A fillet-welded split coupling or a lap patch may be used to repair localized deterioration (e.g., pitting or pinholes) if the SMYS 40,000 psi (See Figure 5).
Temporary repairs should be removed and replaced with permanent repairs at the next available maintenance opportunity. However, temporary repairs may remain longer if the piping engineer approves this and documents it. In most situations, temporary repairs should generally be designed as if they will remain installed for a long time.
56
ts MT or PT See Detail 1
C L
Field Weld C L ts ts Backing Strip t Detail " 1 " Fillet Girth Weld Detail 2 Butt Weld for Seam
Field Weld
57
Typ.
C L
Typ.
Typ.
58
See Detail 1
A relatively small defect may be repaired by completely removing it and then filling the resulting groove with weld metal. Locally corroded areas may be repaired by first removing any surface irregularities and contamination, and then restoring the thickness with weld metal. This approach is only practical for relatively small areas. If the system can be taken out of service, a cylindrical section of pipe that contains the defective area can be removed and replaced.
59
An insert patch (i.e., flush patch) may be used as a repair if: Full penetration groove welds are used. The welds are 100% radiographed or ultrasonically examined for Class 1 or 2 piping systems. The patches have rounded corners with a 1 inch minimum radius.
Care must be taken to ensure that insert patches conform to the pipe curvature to avoid local geometric discontinuities that could act as stress concentration points. In all cases, appropriate NDE should be done of the final welds to ensure that they are high quality. Butt welds will typically be 100% radiographically (RT) or ultrasonically (UT) examined, along with either liquid penetrant (PT) or magnetic particle (MT) examination. Other welds will typically be PT or MT examined.
Non-Welded Repairs
Non-welded repairs may be used to temporarily repair a locally damaged portion of a pipe or piping component while the system remains on-stream (or possibly depressured but not gas-freed and cleaned). This approach may be used for locally thinned sections or linear defects (either partially or completely through the pipe thickness), or leaking flanges. Non-welded repairs typically employ a bolted clamp or box which encompasses the damaged component (See Figures 6 and 7). The design of the clamp or box must be adequate for the pressure thrust force from the damaged pipe if there is concern that the pipe will completely separate at the area of deterioration. The pipe must also have adequate thickness at the clamp or box attachment points to withstand the applied bolting force needed to hold the clamp in place. Bolted clamps or boxes will often require injection of a leak sealing fluid to provide a tight seal at the pipe or component interface. The sealant must be compatible with the service fluid and design conditions.
60
61
All welding must be done in accordance with ASME B31.3 or the original piping construction code using qualified procedures and welders. Any welding that is done while the system is in operation (e.g., hot tapping) must meet the requirements of API Publication 2201. All local design, inspection, testing, and hot work permit procedures developed by the owner must also be followed.
Preheat and Postweld Heat Treatment (PWHT)
Preheat and PWHT requirements must be per the applicable code (i.e., ASME B31.3). Preheating to at least 300F may be used as an alternative to PWHT if the system was originally given PWHT as a code requirement (i.e., based only on material type and thickness), provided: The pipe is P-1 steel. Mn-Mo steels are operated at a high enough temperature to provide adequate fracture toughness and there is no hazard associated with pressure testing, startup, and shutdown. The minimum preheat temperature is measured and maintained, and the joint is covered with insulation immediately after welding to slow the cooling rate.
In situations where PWHT is required due to service considerations (e.g., caustic), then the 300F preheat alternative may not be used. PWHT is preferably done in a 360 band around the pipe that encompasses the weld area. Local PWHT may be substituted on local repairs for all materials provided: An appropriate procedure is developed by a piping engineer. The procedure considers thickness, thermal gradients, material properties, charges resulting from PWHT, the need for full penetration welds, local strains and distortions caused by local heating, and surface and volumetric NDE done after PWHT. A minimum 300F preheat is maintained while welding. The PWHT temperature is maintained for a distance of at least twice the pipe thickness from the weld. The PWHT temperature is monitored by two or more thermocouples. Controlled heat is also applied to any branch connection or other attachment located within the PWHT area.
62
The PWHT is required for code compliance and not for service considerations (e.g., caustic).
All butt joints must be full-penetration groove welds. Piping components must be replaced if a repair is not likely to be adequate. Fillet welded patches must be designed by the piping engineer considering the following requirements: Appropriate weld joint efficiency The possibility of crevice corrosion - Adequate strength per criteria specified in API 570
New and replacement component materials must be per the applicable code. NDE must be per the applicable code, owner-user specifications, and API 570.
Pressure Testing
Pressure testing is normally required after alterations and major repairs, or if otherwise practical and deemed necessary by the inspector. NDE may be considered as an alternative to pressure testing only after consultation with the inspector and the piping engineer. There may be situations where it is not practical to pressure test a final closure weld in a replacement section of pipe. The following requirements must be met in these cases: The new or replacement pipe section must be pressure tested. Thus, only the final closure weld is not pressure tested. The closure weld is a full-penetration weld between a weld neck flange and a standard pipe component; or between straight pipe sections, axially aligned (not miter cut) of equal diameter, thickness, and material. Alternatives that involve slip-on and socket welded flanges are also identified in API 570. The final closure weld must be 100% RT or UT examined. MT or PT must be done on the root pass and final weld for butt welds, and on completed fillet welds.
63
Rerating
The following requirements must be met to permit rerating a piping system to a new design temperature or MAWP: Design evaluations must be done by the piping engineer or inspector to verify the system for the new conditions. The rerating must meet the requirements of either the original construction code or the latest edition of that code. Current inspection data must verify that the system is adequate for the proposed conditions and has sufficient remaining corrosion allowance. The system must be pressure tested for the new conditions, unless records indicate that a previous test was done at a pressure that was greater than or equal to that required for the new conditions. The safety valves must be reset for the new design pressure and confirmed to have adequate relieving capacity. The rerating must be acceptable to the inspector or piping engineer. All components in the system (e.g., valves, flanges, bolts, gaskets, etc.) must be checked and found to be acceptable for the new design conditions. Piping flexibility is adequate for the new design temperature. New calculations may be required to confirm this. The engineering records for the system must be updated. A decrease in the minimum operating temperature is justified by impact test results (or exemptions) if required by the code.
64
Several methods may be used to inspect a buried piping system. A visual surveillance may be made above the area of the pipe for visible indications of leaks. These indications could include: - Surface contour change - Softening of paving asphalt - Bubbling crater puddles Soil discoloration Formation of liquid pools Odor
A close-interval electric potential survey can be conducted over the buried pipe. This survey may locate active corrosion points on the pipe surface. Corrosion cells can be located in this way since the electric potential at a corrosion area will be measurably different from that of an adjacent area. A holiday survey may be done on coated pipe to ensure that the coating is intact and free of holidays. The survey data can be used to determine the effectiveness of the coating and the rate of coating deterioration. Soil resistivity measurements may be used to determine the corrosiveness of the soils in contact with the pipe. A mixture of different soils in contact with the pipe can cause corrosion. If a cathodic protection (CP) system is used for corrosion protection, it should be periodically monitored to ensure that it is providing adequate protection. NACE RP0169 and API RP 651 provide guidance for this monitoring. Direct inspection of buried piping may be done using intelligent pigging, video cameras, or excavation.
65
6 Months - 5 year interval for poorly coated pipe where CP potentials are inconsistent
- Conduct survey along pipe route if no CP or where leaks have occurred due to external corrosion
Frequency based on indications that other corrosion control methods are ineffective 5 year interval if no CP system and over 100 ft. is buried Per NACE 0169 and API RP 651 Base on results of above-ground inspections Pigging or excavation intervals based on measured soil resistivity per Table 1 Alternative or supplement to inspection. Hydrotest at 1.1 x MAOP Interval of Table 1 if no CP Interval per Table 1 if CP
Inspection Interval, years
Soil corrosivity CP system monitoring Internal External (if no CP) Leak testing (i.e., pressure testing)
5 10 15
66
Repairs to buried piping may involve coatings, clamps, or welding. Coating repairs must be inspected to ensure that they meet the following criteria: Sufficient adhesion to prevent underfilm migration of moisture Sufficient ductibility to resist cracking Free of voids and gaps Adequate strength to resist damage due to handling and soil stress Can support supplemental CP Tested with a high-voltage holiday detector
The location of clamp repairs must be logged in the inspection records. They are considered temporary repaired and are to be replaced with a permanent repair at the first opportunity. Welded repairs of buried piping must meet the same requirements as those for above-ground piping.
67
VII. Summary
Inspection, repair, alteration, and rerating of in-service piping systems are normal activities that must be dealt with in process plants. Requirements and procedures are necessary in carrying out these activities to ensure that piping system integrity is maintained. API 570 is the industry standard that is used to form the basis for more detailed procedures that must be developed by process plant owners.
68
69