You are on page 1of 22

9` zj, 4,kp k!

z4,kp` EE) 0X /r+

Page 1 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

SITE BOUNDARY

NEIGHBOR
284

NEIGHBOR
285

DEAD END STREET

230.0

24

230.0

230.0

230.0

22

525.0

GENERATOR
(OPENED TO SKY)

230.0
230.0

15

230.0
230.0

76

62

77

63

10
3940.3

82

230.0

48

230.0

47

TOP OF ROOF SLAB LEVEL

1062.7

352.6

81
600.0

525.0

49

NEIGHBOR
286

600.0

600.0

80

79
600.0

600.0

BUILDING LINE

METAL PROJECTION

DROP OFF
3

4
600.0

600.0

60

0.

78
2
600.0

1062.9

61

11

ROOF SLAB FLOOR LEVEL

75

12

FIFTH FINISH FLOOR LEVEL

0.

60

THIRD FINISH FLOOR LEVEL

25

74

SECOND FINISH FLOOR LEVEL

250.0

PARKING
82 CARS

230.0

59

230.0

73

230.0

58

SITE BOUNDARY

FIRST FINISH FLOOR LEVEL

FOURTH FINISH FLOOR LEVEL

13

230.0

72
44

OPENED TO SKY COURT YARD

GROUND FINISH FLOOR LEVEL

BUILDING
LINE

350.0

57

14

TERRACE

230.0

56

70

16

HANDICAPPED RAMP

55

40

230.0

69

17

230.0

54

230.0

68

230.0

53

39

230.0

VOID

18
67

230.0
230.0
230.0

230.0

19

230.0

52

230.0

66

20

230.0

51

37

MDBs at ground floor


electrical room

230.0

65

21

230.0

50

530.0

230.0

64

550.0
230.0

530.0

230.0

230.0

530.0

43

46

BUILDING LINE

550.00

42

45

TERRACE

METAL PROJECTION

610.0

230.0

36

230.0
230.0

230.0

25

38

230.0
230.0
230.0

230.0

26

23

34

990.9

345.0

27

71

230.0
230.0
230.0
345.0

230.0

230.0

NEIGHBOR
239

28

41

230.0

SITE BOUNDARY

29

33

35

230.0

NEIGHBOR
144

230.0

30

550.0

230.0

230.0

230.0

31

GREEN AREA = 185 m2

230.0

32

(OPENED TO SKY)

54.7

230.0

TRANSFORMER

525.0

3859.3

600.0

NEIGHBOR
295

NEIGHBOR
296

zj+/ 4,kp Yj

1
600.0

SITE BOUNDARY

SITE BOUNDARY
IN

OUT






  

SITE PLAN

WASFI AL TAL STREET

Rami Arnaout
Team
A04

Page 2 of 22

1/200

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 3 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 4 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 5 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 6 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 7 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 8 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 9 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 10 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 11 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 12 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 13 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 14 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 15 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 16 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 17 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 18 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 19 of 22

zj+/ 4,kp Yj

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

11

10

zj+/ 4,kp Yj

11

10

400.0

400.0

- FOR FLOOR FINISHES REFER TO TILING PLANS


- FOR CEILING FINISHES REFER TO CEILING PLANS

MATCH LINE

- FOR WALL FINISHES REFER TO ELEVATIONS


HONED STONE COPPING 5X 25 cm

- FOR STRUCTURAL ELEMENTS REFER TO


STRUCTURAL DRAWINGS
- FOR SLAB ON GRADE DETAIL REFER TO
STRUCTURAL DRAWINGS

MASTIC
METAL FLASHING

PLASTER &PAINT

26.0

PLASTER &PAINT

CEMENT SCREED 2 CM

CEMENT SCREED 2 CM
FOAM CONCRETE LAYED TO SLOPE- min 5cm

250.0

247.0

WATER PROOFING MEMBRANE

- ALL WOOD & METAL WORKS SHOULD BE


TREATED TO RESIST DIFFERENT WEATHER
CONDITIONS.

R.C. SLAB
mastic

WATER PROOFING MEMBRANE

WATER PROOFING MEMBRANE

FOAM CONCRETE LAYED TO SLOPE- min 5cm

R.C. SLAB

25.0

26

85.0

FLOOR FINISH - BY TENANT-

RAIN WATER GUTTER

R.C. SLAB

27.0

METAL CANOPY

100.0

mastic

15.0

26.0

- ALUMINUM WORKS DETAILS BY MANUFACTURER

HOLLOW BLOCK 20 CM

165.0

METAL SHEETS

- METAL WORKS DETAILS BY MANUFACTURER

PLASTER &PAINT

FALSE CEILING - BY TENANTDOUBLE GLAZED ALUMINUM WINDOW

275.0

METAL - WOOD SCREEN

RAIN WATER DRAIN PIPE INSIDE METAL TUBE


FALSE CEILING - BY TENANT-

UP LIGHT

METAL TUBE 10 X10 CM


R.C. SLAB

METALPLATE 25X75 cm

100.0

725.0

DOUBLE GLAZED ALUMINUM WINDOW

300.0

350.0

FLOOR FINISH - BY TENANTMETAL TUBE 15X15 CM

FLOOR FINISH - BY TENANTWOOD SCREEN

FALSE CEILING - BY TENANT-

75.0

50.0

R.C. SLAB

INTERNAL FINISH

PLASTER & PAINT

HOLLOW BLOCK 10 CM
THERMAL INSULATION 5 CM
RC. WALL 25 cm
STEEL BARS GRID 6 mm - 20X20 cm
CEMENT MORTAR 6 cm

WOOD CEILING

275.0

50.0

DOUBLE GLAZED ALUMINUM WINDOW

METAL - WOOD SCREEN


FALSE CEILING - BY TENANT-

STONE 4cm
BARRIED UP LIGHT

FLOOR FINISH - BY TENANTR.C. SLAB

25.0

STAMPED CONCRETE
SLAB ON GRADE
COMPACTED SOIL

50.0
75.0

425.0

mastic
WATER PROOFING MEMBRANE

400.0

STONE ARCH
RAIN WATER DRAIN
CURBE STONE

METAL BRACKET

FLOOR FINISH
INTENAL FINISH
HOLLOW BLOCK 10 CM

SLAB ON GRADE 10 cm

BARRIED UP LIGHT

BLINDING CONCRETE 5cm


WATER PROOFING MEMBRANE

INTENAL FINISH

BLINDING CONCRETE 5cm

HOLLOW BLOCK 15 CM

COMPACTED SOIL

THERMAL INSULATION 5 CM

RC WALL 25 CM
WATER PROOFING MEMBRANE

325.0

THERMAL INSULATION 5 CM

HOLLOW BLOCK 20 CM

PROTECTION BOARD

PLASTER &PAINT

WALL SECTION

1/40

EXHAUST FAN- WALL TYPE

FALSE CEILING - BY TENANT-

Rami Arnaout
Team

WALL SECTION G-G

MATCH LINE

Page 20 of 22

A803

9` zj, 4,kp k!`

296

z4,kp` EE) 0X /r+

295

$% $ &




zj+/ 4,kp Yj

285

284


!#

144

: 


1 - "
 : 
403 : ! 
3
: 

286

239



403



TOPOGRAPHY

1/200

Rami Arnaout
Team


  
  

A03

Page 21 of 22

9` zj, 4,kp k!`

z4,kp` EE) 0X /r+

Page 22 of 22

zj+/ 4,kp Yj

You might also like