Innovation and Technology in Underground Mining the Rio Tinto Perspective Santiago, 13 September, 2005
14 Septiembre, 2005
Presentation
TECHNICAL SERVICES
1000 900 800 700 Contained Copper 1000 t 600 500 400 300 200 100 0 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
TECHNICAL SERVICES
Northparkes (80%)
Lift 1 complete Lift 2 production build-up E48 Pre-Feasibility Study ongoing
Argyle (100%)
Feasibility Study ongoing Exploratory Decline underway Production start-up planned for 2007 20 000t/d
Resolution (55%)
Exploration ongoing Pre-Feasibility Study started - 100 000 t/d planned
Bingham (100%)
Pre-feasibility study completed Currently assessing options
3
TECHNICAL SERVICES
Achievements to-date
Caving in hard rock Caving of high lifts Advanced inclined
undercut One-shot blasting of drawbells Rapid build-up of production Advanced hoisting techniques Roadway construction
TECHNICAL SERVICES
Innovation Model
Best Practice Transfer Collaborative forums communities of practice Lessons Learned Workshop Operations test and evaluate Head Office funded External research groups
TECHNICAL SERVICES
External Researchers
JKMRC (University of Queensland) International Caving Study CAMIRO (Canada) Safe Rapid Development DEEP AMIRA (Australia) SIROVISION - Underground Swansea University ELFEN Code Camborne School of Mines FracMan Code
TECHNICAL SERVICES
Current Research
Block Caving
Flow Fragmentation Prediction Caving mechanics Subsidence Rock Characterisation
a) Fracturing
b) Shear stress
TECHNICAL SERVICES
1000 900 800 700 Contained Copper 1000 t 600 500 400 300 200 100 0 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
TECHNICAL SERVICES
Planned Development
70,000 60,000
50,000
0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
TECHNICAL SERVICES
1960
1980 Year
10
2000
2020
TECHNICAL SERVICES
29%
Drilling
LS SS* SS1
24%
Mucking
14%
Loading
Existing design
At face demand
TECHNICAL SERVICES
Future Research
Continuous loading from
drawpoints Development drilling and blasting integration Underground crushing mineral sizers In situ leach of caved ore Automation of secondary breaking equipment
12
TECHNICAL SERVICES