ENGINEERS INDIA LIMITED

CURRICULUM VITAE Name Present Employer Present Employment Title Proposed Project Job Title Date of Birth Nationality Education Qualification/ Institution/ Year: Registration/ Affiliations/ Membership PROFESSIONAL EXPERIENCE Total Experience : 33 Years, out of which 23 years in Engineers India Limited. CAREER SUMMARY Over 33 years of consulting experience with more than 25 years in various project management positions in India and overseas. Started as Project coordinator and presently working as a Project Director overlooking the project management of Pipeline projects. As Project Manager for over 20 years in Pipelines executed projects covering cross-country crude, LPG and multi-product pipelines including dispatch & receipt terminals and marketing terminals for natural gas, crude oil and white products both in India and abroad. Responsible for execution of these projects by coordinating/managing design, survey, engineering, procurement, construction and commissioning activities. Also accountable for cost estimating, project scheduling and monitoring of these projects. Wide experience on project implementation under various phases such as FEED, design, detailed engineering, EPCM (Engg , procurement, construction supervision and Project management) , EPC / LSTK (Lump sum turnkey ) and Project Management (PMC) phases of projects in the varied fields FIELDS OF EXPEREINCE Refineries, Oil and Gas processing, Offshore platforms, Pipelines, Petrochemicals, Ports and Terminals, Non ferrous metallurgy, Utilities and offsite, Infrastructure. : XCV FGGHBBH (Capital and Bold) : Engineers India Limited : Deputy General Manager : Lead Process Engineer / Project Manager etc : 13-12-1950 : Indian : BE Mechanical, Jadavpur University , Calcutta, India Member of Activity Committee on Pipelines of Centre for : High Technology (Ministry of Petroleum & Natural Gas, Govt. of India) (bold)

DATE: December 04, 2002

NAME: XCV FGGHBBH Pg. 1 of 3

ENGINEERS INDIA LIMITED

WORK HISTORY ENGINEERS INDIA LIMITED : 1980 TO DATE (23 YEARS) Crude Oil Pipeline from Mundra to Bathinda via Jodhpur (MJB Pipeline) for Punjab Refinery Project of M/s Guru Gobind Singh Refineries Ltd (India): - ( Mention Project name, client name in full, country and all in BOLD ) Job Title : Lead Engineer (Structural) Period : 2001 to 2005 (Reverse order) Project phase : (Mention out of these or combination of these) - Design / FEED / EPCM (Engineering, procurement, Construction supervision and project management / EPC / LSTK PMC please give full form of EPCM as overseas clients are unaware of this terminology Responsible for EPCM implementation of 30" dia, 1010 KM long pipeline with Crude Oil Terminal at Mundra, Intermediate Pumping Station at Jodhpur and Crude Oil Storage terminal at Bathinda with necessary SCADA, Telecom, CP and Tank Farm Management system. - (Mention in 2-4 lines only - Wherever FEED was done mention in your responsibility the role in preparation of EPC Bid package) Multi-product pipeline from Cochin to Karur via Coimbatore (CCK Pipeline) for Petronet-CCK Ltd., Cochin(India). - (Mention Project name, client name in full, country and all in BOLD ) Job Title : Project Manager (Pipelines) Period : 1998 to 2002 Project phase : (Mention out of these or combination of these) - Design / FEED / EPCM (Engineering, procurement, Construction supervision and project management / EPC / LSTK PMC (please give full form of EPCM as overseas clients are unaware of this terminology) Responsible for implementation of 18"/14" dia, 290 Km long pipeline with Despatch & Receiving Terminals and Intermediate Pump Station including Telecom, SCADA & CP System. (Mention in 2-4 lines only - Wherever FEED was done mention in your responsibility the role in preparation of EPC Bid package ) .. .. .. .. .. PREVIOUS WORK HISTORY UHDE INDIA LIMITED : : 1978 TO 1980 (2 YEARS) XYZ Pipeline Project for Indian Oil Corporation Limited, IOCL, India - (Mention Project name, client name in full, country and all in BOLD ) Job Title : Project Coordinator (Pipelines ) Period : 1996 to 1998 Project phase : (Mention out of these or combination of these -) Design / FEED / EPCM (Engineering, procurement, Construction supervision and project management / EPC / LSTK PMC (please give full form of EPCM as overseas clients are unaware of this terminology) - (Mention in 2-4 lines only - Wherever FEED was done mention in your responsibility the role in preparation of EPC Bid package )

DATE: December 04, 2002

NAME: XCV FGGHBBH Pg. 2 of 3

ENGINEERS INDIA LIMITED

.. .. .. .. BHARAT PETROLEUM CORPORATION LIMITED : 1978 TO 1980 (2 YEARS) Project Engineering, Construction & Materials Management functions, Marketing Installations across Eastern India. Was responsible for budgeting, tendering, engineering, procurement and construction activities as well as training & safety functiosn for supply & distribution facilities at Eastern Region of India. Also responsible for procurement of company-owned tank lorries and its maintenance (Non consulting experience can be given in brief)

OTHER SUGGESTIONS/ COMMENTS a) Font size is times New Roman and 11 size with single spacing as has been done in this CV. FILE NAME SHALL BE Department Employee Name for eg R&D - Manu Kaushal b) Wherever possible AVOID clubbing the jobs in one box . Clubbing is to be done for employees working for short period on an assignment. If at all some clubbing is done, then please club on the basis of some commonality such as refinery projects can be grouped separately, pipelines separately.. and so on . Even within these there can be sub groups for eg Refinery FEED projects as separate, Refinery LSTK separately etc Try fitting CAREER SUMMARY and FIELDS OF EXPEREINCE in First Page JOB TITLE refers to the title held by the EMPLOYEE in the specific project For example as per project quality plan your title could be project director , project manager, project coordinator , Lead engr, Job engr etc. This title is different from the employement title given by EIL (AGM, DGM , Srr Mgr etc.) Although this heading appears confusin and some emplyees interpret it as "Project Name" , but please note that clients have used this language in many tenders to be interpreted as TITLE GIVEN TO THE EMPLOYEE WHILE EXECUTING THE PROJECT. e) Refer to the responsibilities written under WORK HISTORY for each project (in each box). PLEASE FOCUS on role/ contribution vis a vis the areas/ units covered, equipments , types of systems and unique items handled (such as design of systems with v high temps / cryogenic, exotic metallurgy), Vendors and contractors handled , no of engrs whose work was supervised etc idea is to add qualitative info . PL ADOPT THIS PHILOSOPHY f) Some employees have shown their concern on how to show many of the small projects of say 3-6 month duration . These can be shown under a heading Other projects without needing any box. FOR EXAMPLE :
NAME: XCV FGGHBBH Pg. 3 of 3

c) d)

DATE: December 04, 2002

ENGINEERS INDIA LIMITED

OTHER PROJECTS
Planning Software development (project name in BOLD) Worked for dev of Cosmos software upgrade (A brief description in 1 or 2 lines)

Central planning cell As Planning engr for central planning, monitoring of ......... Technical assistance to NPCC Deputed to NPCC Abu Dhabi as lead planning engr, worked on XYZ project CVs are expected to be of 4 pages or less