Page 2 of 346 Sr NoDescriptionUnitQuanti Unit = cumTaking output = 1 a) Material

Stone weighing not less tha b) Labour Mateday0.04 input#VALUE Rate per cum = (a+b+c+d) ###

say#VALUE! 15.4B Unit = cumTaking output = 1 cum1.00 #VALUE!#VALUE Rate per cum ### say#VALUE! ### Unit = cumTaking output = 1 a) Material Graded stone aggregate of b) Labour

Mateday0.05 input#VALUE Rate per cum = (a+b+c+d) ### say#VALUE! 15.6Geotextile Filter Unit = sqmTaking output = 1 a) Labour Mateday0.02 input#VALUE b) Material sqm11.00 input#VALUE!M Providing and laying Pitchin Concrete Grade M15 Rate

Providing and laying Filter m Includes Mazdoor required 700 &2504 Laying of a geotextile filter c) Overhead charges @ inpu

Page 3 of 346 Sr NoDescriptionUnitQuanti

#VALUE!Cost for 10 sqm = Rate per sqm = (a+b+c+d)/1 ### say#VALUE! 15.7Toe protection15.82505

Unit = cumTaking output = 1 cum0.33 #VALUE!#VALUE c) Material Stonecum1.00 input#VALU d) Labour Mateday0.08 input#VALUE Rate per cum = (a+b+c+d+e ### say#VALUE! * 15.8BCement Concrete bloc cum1.00 #VALUE!#VALUE

Rate per cum ### say#VALUE! 15.92506Dry Rubble Floorin Unit = cumTaking output = 1 a) Material Stonecum1.00 input#VALU b) Labourd) Contractor's pro A toe wall for toe protection Providing and laying Floorin (Rate as in Item12.6 sub-a b) Add for cement concrete

Item12.8 (A)Add 1 per cent e) Overhead charges @ inp Includes cement mortar for

Page 4 of 346 Sr NoDescriptionUnitQuanti

Mateday0.10 input#VALUE Rate per cum = (a+b+c+d) ### say#VALUE! AStone masonry in cement cum1.00 #VALUE!#VALUE Rate per cum

say#VALUE! or BCement concrete Grade M cum1.00 #VALUE!#VALUE Rate per cum say#VALUE! Note Unit = cumTaking Output = 1 a) Material Stonecum1.00 input#VALU b) Labour Mateday0.05 input#VALUE

Rate per cum = (a+b+c+d) ### say#VALUE! Gabian Structure for Retaini Unit = cum a) Labour Mateday0.28 input#VALUE b) Material Add 1 per cent of (b) for trim c) Overhead charges @ inpu Item12.7 (A )Rate same as ###

Concrete Grade M15 Rate 15.112507.2Flexible Apron : Add 1 per cent of cost of (a c) Overhead charges @ inpu Providing and construction Taking output = 7 x 3 x 0.6 =

Page 5 of 346 Sr NoDescriptionUnitQuanti

sqm61.00 input#VALUE!M Rate per cum (a+b+c+d)/12. ### say#VALUE!

Note Unit = cum a) Labour Mateday0.14 input#VALUE b) Material sqm65.00 input#VALUE!M Rate per cum (a+b+c+d)/6.0 ### say#VALUE! Note Galvanised steel wire crate c) Overhead charges @ inpu

Readymade woven wire cr 15.132503.3Gabian Structur Providing and constructing Taking output = 2 x 1 x 0.3 x Galvanised steel wire crate c) Overhead charges @ inpu Readymade woven wire cr
Page 1 of 346

CHAPTER-16REPAIR

Sr NoDescriptionUnitQuanti Unit = Sq m ( Thickness 75 a) Labour

Mateday0.06 input#VALUE b) Machinery hour1.00 input#VALUE! Tra Rate per sqm = (a+b+c+d)/1 ### say#VALUE! ### Unit = Sq mTaking output = a) Labour Mateday0.03 input#VALUE b) Machinery hour0.75 input#VALUE! Tra

Rate per sqm = (a+b+c+d)/1 ### say#VALUE! ### Unit = Sq mTaking output = Assuming thickness 25 mm a) Material Cementkg16.00 #VALUE!# b) Labour Mateday0.01 input#VALUE c) Machinery hour0.10 input#VALUE!#VA

Rate per sqm = (a+b+c+d+e ### say#VALUE! Ref.toMoRTHSpec.Remark Air Compressor 250 cfm w c) Overhead charges @ inpu Air Compressor 250 cfm w c) Overhead charges @ inpu M-081/1000Wire mesh 50m d) Overhead charges @ inp

Page 2 of 346 Sr NoDescriptionUnitQuanti

Unit = Number Taking outpu a) Material Nippleseach1.00 input#VA b) Labour Mateday0.01 input#VALUE Rate per No. = (a+b+c+d) ### say#VALUE! 16.52806ACement Grout Unit = kgTaking output = 1 k a) Material Cement including 10 per ce

b) Labour Mateday0.08 input#VALUE c) Machinery hour0.10 input#VALUE!M-1 Rate per kg = (a+b+c+d+e) ### say#VALUE! B Cement Mortar (1:1) Grou Unit = kgTaking output = 1 k a) Material Cement including 10 per ce b) Labour

Mateday0.08 input#VALUE c) Machinery hour0.10 input#VALUE!M-1 Providing and inserting nipp Cement, fixing compound a c) Overhead charges @ inpu M-081/1000Admixtures (an d) Overhead charges @ inp M-081/1000M-005/1500Ad d) Overhead charges @ inp
Standard Data Book (Roads & Bridges)
Download this Document for FreePrintMobileCollectionsReport Document

Info and Rating


civil construction

Follow shariqabideen

Share & Embed Related Documents


PreviousNext 1. 363 p. 344 p. 362 p. 2. 362 p. 361 p. 123 p. 3. 24 p. 47 p. 16 p. 4. 26 p. 26 p. 194 p. 5. 97 p. 28 p. 250 p. 6. 39 p.

More from this user


PreviousNext 1. 313 p. 58 p. 346 p. 2. 8 p. 124 p. 8:00 PM

Recent Readcasters Add a Comment

Upload a Document Search Documents Follow Us! scribd.com/scribd twitter.com/scribd facebook.com/scribd About

Press Blog Partners Scribd 101 Web Stuff Support FAQ Developers / API Jobs Terms Copyright Privacy Copyright 2012 Scribd Inc. Language: English

itQuantityRate RsCost RsRef.to utput = 1 cum

less than 40kgcum1.00 input#

#VALUE!L-12Masonday0.35 in b+c+d)

utput = 1 cum #VALUE!#VALUE!

utput = 1 cum

egate of required sizecum1.20

#VALUE!L-12Mazdoor (Skilled b+c+d)

utput = 10 sqm.

#VALUE!L-12Mazdoorday0.30

ALUE!M-181#VALUE! g Pitching onslopes laid over pre 15 Rate as per itemNo. 12.8 (A

g Filter materialunderneath pitch equired for trimming of slope t

ile filter betweenpitching and e s @ input on(a+b)

itQuantityRate RsCost RsRef.to 0 sqm = a+b+c+d#VALUE! b+c+d)/10

5.82505A

utput = 1 cum #VALUE!cum0.33 #VALUE!#V

ut#VALUE!M-003Stone Spallsc

#VALUE!L-12Masonday0.50 in b+c+d+e+f)

rete blocks Grade M15 #VALUE!cum0.33 #VALUE!#V

e Flooring utput = 1 cum

ut#VALUE!M-003Stone Spallsc tor's profit @ input on(a+b+c)25 rotection can either be indry ru g Flooring completeas per drawi 6 sub-analysis) excluding OH oncrete bedding(M15 Nominal m

per cent of cost to account for s @ input on(a+c+d)f) Contract ortar for laying and fillingof join

itQuantityRate RsCost RsRef.to #VALUE!L-12Masonday0.50 in b+c+d)

cement mortar (1:3)Coursed rub #VALUE!

Grade M15 #VALUE!

utput = 1 cum

ut#VALUE!M-003Stone Spallsc

#VALUE!L-12Masonday0.25 in

b+c+d)

r Retaining Earth

#VALUE!L-12Mazdoorday5.00

b) for trimming andpreparation s @ input on(a+b)d) Contractor same as per item No. 12.7 (A)i

15 Rate as per itemNo. 12.8 (A e Apron :Construction of flexible ost of (a+b) fortrimming and p s @ input on(a+b)d) Contractor truction of a gabianstructure fo 3 x 0.6 = 12.60cum

itQuantityRate RsCost RsRef.to ALUE!M-102cum12.60 input#V c+d)/12.60

#VALUE!L-12Mazdoorday2.50

ALUE!M-102cum6.00 input#VA c+d)/6.00

ire crates of meshsize 100 mm s @ input on(a+b)d) Contractor

wire crate rolls havebeen con Structure for Erosion Control,R tructing gabianstructures for e 1 x 0.3 x 10 Nos. =6.00 cum ire crates of meshsize 100 mm s @ input on(a+b)d) Contractor wire crate rolls havebeen con

EPAIR AND REHABILITAT

itQuantityRate RsCost Rs16.12 ness 75 mm)Taking output = 10

#VALUE!L-12Mazdoor day1.00

LUE! Tractor-trolley.hour0.50 i b+c+d)/10

output = 10 sqm

#VALUE!L-12Mazdoor day0.75

LUE! Tractor-trolley.hour0.40 i

b+c+d)/10

output = 1 sqm s 25 mm

ALUE!#VALUE!Graded sandc

#VALUE!L-12Masonday0.04 in

LUE!#VALUE!#VALUE!

b+c+d+e)

Remark s/ Inputref.Removal of e 0 cfm with pneumaticbreaker/j s @ input ond) Contractor's pro 0 cfm with pneumaticP&M-P& s @ input ond) Contractor's pro esh 50mm x 50mm size of 3m s @ input one) Contractor's pro

itQuantityRate RsCost RsRef.to

ng output = 1 No.

put#VALUE!M-129#VALUE!

#VALUE!L-12Mazdoor (Skilled +c+d)

Grout put = 1 kg

0 per cent wastagekg1.10 #VA

#VALUE!L-12Mazdoor (Skilled

LUE!M-111#VALUE!#VALUE! c+d+e)

:1) Grouting put = 1 kg

0 per cent wastagekg0.55 #VA

#VALUE!L-12Mazdoor (Skilled

LUE!M-111#VALUE!#VALUE! ing nipples withapproved fixing pound andconsumables @ 15 s @ input on(a+b)d) Contractor ures (anti shrinkage compoun s @ input on(a+b+c)e) Contrac 1500Admixtures (anti shrinkag s @ input on(a+b+c)e) Contrac

RsRef.toMoRTHSpec.Remark s

00 input#VALUE!M-003Stone

ay0.35 input#VALUE!L-11Maz

cum1.20 input#VALUE!M-012

(Skilled)day0.25 input#VALUE

day0.30 input#VALUE!L-13Ma

over prepared filter mediainclud . 12.8 (A)Item12.8 (A)Add 2 pe

ath pitching in slopescomplete a f slope to proper profile and pr

ng and embankment slopes on

RsRef.toMoRTHSpec.Remark s LUE!

LUE!#VALUE!#VALUE!

e Spallscum0.20 input#VALUE

ay0.50 input#VALUE!L-11day1

LUE!#VALUE!#VALUE!

e Spallscum0.20 input#VALUE a+b+c)2504.4 indry rubble masonry in case er drawing and Technicalspecif ing OH & CPItem12.6 (A) ominal mix) vide Item 12.8 (A)e

ount forexcavation for prepara Contractor's profit @ input on(a+ ngof joints.Concrete Grade M1

RsRef.toMoRTHSpec.Remark s ay0.50 input#VALUE!L-11maz

ursed rubble masonry (1st sort)

e Spallscum0.20 input#VALUE

ay0.25 input#VALUE!L-11Maz

day5.00 input#VALUE!L-13Ma

paration of base. ontractor's profit @ input on(a+b 12.7 (A)including OH & CP

. 12.8 (A) including OH & CPIt f flexibleapron 1 m thick compris g and preparation of bed. ontractor's profit @ input on(a+b ucture for retaining earth with

RsRef.toMoRTHSpec.Remark s input#VALUE!M-003Stone sp

day2.50 input#VALUE!L-13Ma

nput#VALUE!M-003Stone spa

100 mm x 100 mm woven wit ontractor's profit @ input on(a+b

een considered in the rate ana ontrol,River Training Works and res for erosion control, river tra cum 100 mm x 100 mm woven wit ontractor's profit @ input on(a+b een considered in the rate ana

BILITATION

Rs16.12809 put = 10 sqm

day1.00 input#VALUE!L-13

ur0.50 input#VALUE!#VALUE

day0.75 input#VALUE!L-13

ur0.40 input#VALUE!#VALUE

d sandcum0.04 input#VALUE

ay0.04 input#VALUE!L-11Maz

moval of existing cement concret reaker/jack hammer along wit tor's profit @ input onRemoval &M-P&Mtor's profit @ input onGuniting c ze of 3mmAccelerator compou tor's profit @ input on

RsRef.toMoRTHSpec.Remark s

ALUE!

(Skilled) labour for drillingday

1.10 #VALUE!#VALUE!#VALU

(Skilled)day0.10 input#VALUE

VALUE!

0.55 #VALUE!#VALUE!Sand i

(Skilled)day0.10 input#VALUE

VALUE! ed fixing compound afterdrilling es @ 15 per cent of cost of nip ontractor's profit @ input on(a+b ompound)@ 20 per cent of cos Contractor's profit @ input on(a shrinkage compound)@ 20 pe Contractor's profit @ input on(a

Remark s/ Inputref.15.42504ASt

3Stone spalls of minimum 25 m

-11Mazdoorday0.75 input#VA

!M-012

#VALUE!L-15Mazdoor *day1.

!L-13Mazdoor (Skilled)day0.1

diaincluding boulder apron laid Add 2 per cent of cost to accou

mplete as per drawing and Tec e and preparation of bed.

opes on whichpitching is laid t

Remark s/ Inputref.

#VALUE!M-008

-11day1.50 input#VALUE!L-13

#VALUE!M-008

in case of dry rubblepitching o calspecifications laid over ceme (A) 2.8 (A)excluding OH & CP . Qu

preparation of bed.Mazdoor (f put on(a+c+d+e) rade M15 block. (Rate as peri

Remark s/ Inputref. -11mazdoorday1.50 input#VA

1st sort)

#VALUE!M-008

-11Mazdoorday1.00 input#VA

!L-13Mazdoor (Skilled)day2.0

t on(a+b+c)15.102507.2Curtain CP

H & CPItem12.8 (A)Other items comprising of loosestone bould ed. t on(a+b+c)15.122503.3 th with segmentsof wire crate

Remark s/ Inputref. Stone spalls of minimum size 2

!L-13Mazdoor (Skilled)day1.0

one spalls of minimum size 25

oven with4mm dia. GI wire in ro t on(a+b+c)

rate analysis. Incase readyma orks and Protectionworks river trainingworks and protec

oven with4mm dia. GI wire in ro t on(a+b+c) rate analysis. Incase readyma

E!L-13

#VALUE!#VALUE!Cost for 10

E!L-13

#VALUE!#VALUE!Cost for 10

VALUE!M-005kg2.00 input#V

-11Mazdoorday0.14 input#VA

concretewearing coat including ong withaccessories.P&M-001 emoval of existing asphaltic we

uniting concrete surface with ce compound for guniting @ 4pe

Remark s/ Inputref.16.42800

llingday0.08 input#VALUE!L-1

E!#VALUE!

#VALUE!L-15Mazdoor day0.1

E!Sand including 10 per cent w

#VALUE!L-15Mazdoor day0.1

rdrilling holes for grouting as pe ost of nippleMazdoor (Skilled) l t on(a+b+c)Sealing of cracks/po nt of cost of cementGrout pum put on(a+b+c+d) @ 20 per cent of cost of ceme put on(a+b+c+d)

2504AStone/Boulder

um 25 mm sizecum0.20 input

put#VALUE!L-13#VALUE!#VA

r *day1.00 input#VALUE!L-13#

)day0.10 input#VALUE!L-15

ron laid dry infront of toe of emb to account fornominal surface

and Technicalspecificationc) Ov

is laid to prevent escape of th

UE!L-13#VALUE!#VALUE!

tching or pitching with stones er cement concertbedding.Rubb

CP . Quantity shall beadopted

zdoor (for laying stones, filling

as peritem No. 12.8 (A) includ

put#VALUE!L-13#VALUE!#VA

put#VALUE!L-13#VALUE!#VA

)day2.00 input#VALUE!L-15

2Curtain wall complete as per d

her items like excavation for fo ne boulders weighing not less t

re crates of size 7 m x 3 m x 0

m size 25 mm cum2.52 input#

)day1.00 input#VALUE!L-15

size 25 mm cum1.20 input#V

wire in rolls of requiredsize.Sto

eadymade rolls are not availa

d protection works with wire cr

wire in rolls of requiredsize to c

eadymade rolls are not availa

t for 10 sqm = (a+d+c+d)#VAL

t for 10 sqm = (a+d+c+d)#VAL

input#VALUE!M-192Epoxykg0

put#VALUE!L-13

including its disposalcomplete a P&M-001P&Mhaltic wearingcoat comprising of

e with cementmortar applied wi @ 4per cent of weight of cem

2800

LUE!L-15day0.08 input#VALU

r day0.10 input#VALUE!L-13

r cent wastagekg0.55 #VALUE

r day0.10 input#VALUE!L-13

ng as perTechnical Specificatio Skilled) labour for fixing nipplea racks/porous concrete byinjecti out pump with agitator andacc

of cementGrout pump with agi

20 input#VALUE!M-008

LUE!#VALUE!

UE!L-13#VALUE!#VALUE!

E!L-15

e of embankment completeas p surface reinforcement andfillin

ionc) Overhead charges @ inp

ape of theembankment materia

LUE!

stones in wirecrates or it can ng.Rubble stone laid in cement

dopted as per design ( Assume

s, filling of quarry spalls)

A) including OH & CP.Item12.

LUE!#VALUE!#VALUE!

LUE!#VALUE!#VALUE!

E!L-15

as per drawingand Technical sp

on for foundation,filling behind not less than40 kg beyond curta

3 m x 0.6 meach divided into

2 input#VALUE!M-008#VALUE

E!L-15

input#VALUE!M-008#VALUE!

size.Stone boulders with least

t available, GIwire 4mm dia. @

h wire cratesof size 2 m x 1 m

size to cover 6.00 cum.Stone

t available, GIwire 4mm dia. @

+d)#VALUE!

+d)#VALUE!

poxykg0.67 input#VALUE!M-0

mplete as per TechnicalSpecific

prising of 50 mm thick asphaltic

plied with compressor afterclea t of cementAdd 2 per cent of c

t#VALUE!L-15day0.04 input#V

E!L-13

#VALUE!#VALUE!#VALUE!

E!L-13

ecifications includingsubsequen g nippleand sealing inletsMazd byinjection process throughnipp andaccessories

with agitator andaccessories

UE!

pleteas per drawing and Technic andfilling of granular material

s @ input on(a+b)d) Contractor

t material through the voids of

r it can be in PCC M15 nomina cement mortar1:3a) Cement m

AssumeRubble stone Flooring

Item12.8 (A)Add for cement c

hnical specification

behind wall, filter media, wee nd curtain wall.

ed into 1.5 m compartments b

#VALUE!#VALUE!Cost for 12.

VALUE!#VALUE!Cost for 6.00

ith least dimension of 200 mm

m dia. @ 32 kg per 10 sqm m

m x 1 m x 0.3 m each divided i

m.Stone boulders with least dim

m dia. @ 32 kg per 10 sqm m

LUE!M-095kg0.64 input#VALU

lSpecification without causing a

sphaltic concert laid over 12 mm

aftercleaning surface and spray cent of cost of material formisc

4 input#VALUE!L-13#VALUE!#

ALUE!

bsequent cutting/removal andse etsMazdoor for cutting and rem oughnipples/Grouting complete

sories

Technicalc) Overhead charges material in recessesbetween b

ontractor's profit @ input on(a+b

voids of the stone pitching/cem

5 nominal mixif cement concer ement mortor 1:3

Flooring thickness300mm and c

ement concrete bedding (M15N

ia, weep holesetc. shall be ad

ments bycross netting, made f

t for 12.60 cum (a+b+c+d)#VA

for 6.00 cum (a+b+c+d)#VALU

200 mm

sqm may beprovided. In that

divided into1m compartments b

east dimension of 200 mm sqm may beprovided. In that

t#VALUE!M-180#VALUE!

ausing anydetrimental effect to

er 12 mm thick mastic asphalt in

nd spraying withepoxy complete formiscellaneous consumable

ALUE!#VALUE!#VALUE!

al andsealing of the hole as nec and removing of nipplesAdd 1 omplete as perTechnical Specif

charges @ input ond) Contract tween blocks.

t on(a+b+c)

hing/cement concrete blocksas

concert block have been use

m and cement concrete beddin

g (M15Nominal mix) vide Item

all be added separately as per

, made from 4 mm galvanised

c+d)#VALUE!

d)#VALUE!

In that case 2 per cent of thec

tments by cross netting, made mm

In that case 2 per cent of thec

UE!

effect to any part of thebridge st

sphalt including disposal withal

omplete as per TechnicalSpeci sumables likenozzles, wire bru

UE!

e as necessary of nipples after esAdd 10 per cent of labour c al Specification.

Contractor's profit @ input onCe

blocksas well as to allow free m

een used forpitching . Rates fo

e bedding

ide Item 12.8 (A)including OH

y as perapproved design.

vanisedsteel wire @ 32 kg per

nt of thecost of GI wire may be

g, madefrom 4 mm galvanised

nt of thecost of GI wire may be

bridge structure and removal of

al withall lift and lead upto 1000

calSpecification wire brush, cotton waste etc.C

es after completion of grouting abour cost fordrilling holes etc

put onCement Concrete Blocks

w free movement of waterwith

Rates for toe wall can be adop

ding OH & CP. Quantity shall b

2 kg per 10 sqm havingminimu

may be added for weaving

vanised steel wire @ 32 kgpe

may be added for weaving

moval of dismantled material wit

pto 1000 m.

ste etc.Compressor with guniti

routing oles etc

e Blocks of size0.3x0.3 x0.3 m c

aterwithout creating any uplift

be adoptedfrom respective cla

y shall beadopted as per desig

gminimum tensile strength of 3

aving

32 kgper 10 sqm having minim

aving

terial with all lifts and

th guniting equipmentalong wi

x0.3 m cast in cement concrete

ny uplift head on thePermeabl

ctive clauses depending upon

per design ( AssumeCement C

ngth of 300 Mpaconforming to

ng minimum tensilestrength of

along with accessoriesP&M-07

concreteof Grade M15

ermeable synthetic geotextilein

ng uponapproved design. The

ement Concrete blocks thickne

ming to IS:280 and galvanizin

ngth of 300 Mpa conforming t

P&M-076

otextileincluding 5 per cent for

gn. The rate for excavationfor

s thickness300mm and cemen

lvanizingcoating conforming to

orming to IS:280and galvanizin

cent for overlap andwastage

ationfor foundation, dry rubble

cement concrete beddingItem

rming to IS:4826, woven intom

alvanizing coating conforming

astage

y rubble masonry and PCCM1

dingItem12.8 (A)Add 1 per cen

en intomesh with double twist,

orming toIS:4826, woven into

PCCM15 have been analysed

per cent of cost to account fo

ble twist, mesh size notexceed

ven into mesh with double twis

nalysed and given in

count forexcavation for prepar

texceeding 100 x 100 mm, fille

uble twist,mesh size not excee

r preparation of bed.Construct

mm, filled with

ot exceeding 100 mm x 100mm

onstruction of dry rubble floorin

x 100mm, filled with boulders w

le flooring at crossdrainage wo

ulders with least

nage works for relatively less i

ely less importantworks.