CV/Resume Details 1.

Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] Exposure the actual horizontal and vertical constructions and marine construction such as roads, drainage and sewerage systems, buildings, foundations, elevated structures for the equipment, breakwater, Jetty, and shore protection. These experienced have improved my administrative competence, supervisory capability, and quality and safety awareness doctrine. 2. Work Experience - CV/Resume Part 2 [Mandatory] June 01,2006 Present KBR YEMGAS Balhaf , Yemen Marine Civil/Jetty Supervisor - LNG Facilities (onshore and offshore) The Project was owned by YLNG-TOTAL. Im working under the TECHNIP - KBR Joint Venture Company. Duties include site supervision and inspection for the marine works like the construction of breakwater, Material Off Loading Facilities including the bridge, Main Jetty Facilities, Shore Protection and Intake Pumping Station Pit. Control and implement corrective measures for non-conformities identified during inspections. Review/Approve Quality plans and ITPs. Coordinate Quality meetings. Plan and conduct Process Audits on sub-contractors. Preparation of final document packages. Prepare technical paper works such as Request for Inspection, document tests, Interim Release, Coordination, Progress reports, deviation reports, technical query and all technical papers as per project requirements. Coordination between Civil, Mechanical, Piping and Electrical disciplines Site Inspection and witnesses tasks related to marine civil discipline in conformity with the plans, specifications and procedures. Monitoring and supervised sub contractors activities under the quality procedures in accordance with the job specifications and AFC drawings. Strictly enforce company rules and regulations, quality and safety policies specially the marine environment. July 02,2005 May 20,2006 JGC Middle East FZE Ras Laffan Industrial City,Qatar Civil Supervisor - LNG Upstream And Compression Facilities The Project was owned by Dolphin Energy Ltd (DEL). Im working under the contractor management. This covers the construction of Equipment and Pipe Rack Foundations in the Process Area. Also, the construction of Underground Facilities. Duties includes site supervision for the formworks, rebar works, and specially the concreting and finishing works. Push and motivate the sub-contractor to attain the schedules and productivity target. Prepare technical paper works such as Application for Inspection, Interim Release for the hand-over to the other department, Minutes of Meeting and all technical papers as per project requirements. Monitoring and supervised sub contractor, Naser Al Haijiri , activities under the quality and safety procedures in accordance with the job specifications and drawings . Strictly enforce company rules and regulations, quality and safety policies. January 07,2005 July 01,2005 Maynilad Water Services Inc. Philippines Project Inspector - Waterline PVC Pipeline Project Im working in the company which is the client, specialized in pipeline construction to supply a potable water for the consumer of Pasay City residence. Monitoring and supervised the daily accomplishment and daily activities to ensure the productivity target. Attend coordination meeting. Checked, approved and witnessed work procedures, method of statements, inspection test plans as per project requirement and specifications. Making technical paper works such as memos, progress reports, tests pack and all required technical papers in the project. Monitor and control construction supervisor and inspectors quality control activities to confirm that they complied with the specified procedure. Conduct line checking and prepare punch list for each test packages. Confirm that all necessary inspection, punch list and requirements for each test packages have been completed prior to hydro-test. Implement strictly company rules and regulations, quality and safety policies. September 11 , 2003December 15,2004 Petrofac Intl Ltd. Tetriskaro,Georgia Civil Supervisor - AGT Pipeline Project The Baku Tbilisi Ceyhan Project was owned by Britisth Petroleum (BP). Im working as the contractor side that is Joint Venture Company (Amec Spie Petrofac Intl Ltd.).

Assigned to supervise the construction of the underground facilities like the Oily Water System, Process Drain System (Open & Closed), Sewage System, Underground Piping, Electrical and Instrumentation cable lines. Secondly, supervised the construction of Pre Cast Item such as manholes, light pole foundations, electrical and instrumentation supports. Technical paper works making. Assist in punch listing activities of the system and turn over documents to the client. Strictly enforce company rules and regulations, quality and safety policies of course. April 20 , 2001 - September 05,2003 Engineering Equipment Inc. Philippines Site Engineer ( Field Operation) Warehouse Building Direct supervision and closed monitoring of manpower loading for volume of works in the project. Supervised concreting and finishing works. Withdraw materials and tools needed in their job. Implement plans and schedules as directed by the Manager. Monitor and report daily accomplishment and corresponding man-hour and equipment-hour utilized. Push and motivate men to attain schedules and productivity target. Conducting a construction and coordination meeting. Strictly enforce company rules and regulations, quality and safety policies. Performs other related functions as may be required.

December 04 , 2000 - March 14 , 2001 IRONCON Builders Philippines Estimator/Site Inspector (On Job Training) Prepares cost and work completion estimates of the project. Compiles itemized materials and price lists from blueprints and specifications. Computes cost estimates of raw materials. May consult with the engineering departments concerning cost problems. Designated according to area of specialization as Estimator/Site Inspector.

You might also like