You are on page 1of 2

NITIE Dr Rahul V Altekar

altekarrahul@yahoo.com +91 9820053144

Project Assignment Guidelines


1. Every student should do individual assignment; no group activities. 2. The assignment efforts includes a. Selecting different topics on ERP related to Manufacturing or Service Industry. b. Study of the different aspects of ERP in the selected sector. Student could focus ONE or More core areas of business process. For example, refer the sample assignment topics. c. Student should ideally visit / interact with the officials of any of the company for data collection. In other case, they should gather data from any open source but mention the same in references section of the report. d. Should student require any help for company selection they could approach faculty directly. 3. The Project assignment submission should be done in soft copy by individual students and the coordinator should write a CD and send to faculty. 4. The report should be submitted in following structure: a. Project Report in the MS Word document (no page limits; what matters the quality). Syntax for file name: < RollNo_Report>. For example, roll no 12 from will name his report file as 12_Report.Docx b. One presentation in .ppt format (maximum slides = 10 without any animation effect). Syntax for file name: <RollNo_Present>. For example, roll no 45 from will name his presentation file as 45_Present. pptx c. One folder where all reference texts, files etc are maintained. Syntax for folder name: <RollNo_Reference>. For example, roll no 20 will name his reference folder as 20_Reference. d. It is expected to create one folder per student where all above mentioned three files (2 files and one folder) will be stored. The syntax for this folder is <Section_RollNo_Name>. For example, Shyam (Roll No 85 from Section A) will name his general folder as Secton_A _85_Shyam. 5. Submission calendar a. Sending info on selected topic and scope of the Project to faculty: by 14th February 2012. b. Submission of the final assignment folder to Coordinators: by 30th March 2012. c. Cutting CD and submission of the CD to Faculty: by 1st of April 2012.

NITIE Dr Rahul V Altekar Sample Assignment Topics 1. 2. 3. 4. 5. 6. 7. 8. 9.

altekarrahul@yahoo.com +91 9820053144

MM module implemented in Mahindra & Mahindra, Automotive Division Comparative analysis of ERP vendors in Banking Sector SAP R/3 s MRP capability and limitations ERP for Ship Building Industry Indian ERP vendors (brands): Strengths and Weaknesses FICO Module of SAP R/3 v/s Oracle Financial ERP ERP for Semiconductor Industry Best Practices in ERP: Retail Industry context Difference and Overlapping between ERP System and Supply Chain Optimization System 10. Web based ERP 11. ERP: Cloud based Service offering in India 12. Database Management Issues in ERP

You might also like