You are on page 1of 3

SUBRATA MUKHERJEE, PE (ELECTRICAL) 951 WILSHIRE CT, VERNON HILLS, IL 60061 PHONE (847):927-0849 1 of 4 Email: sm13b8f90@westpost.net PROFILE Mr.

Mukherjee has over 23 years experience as an Electrical Engineer. His experi ence involves Lighting and Power distribution projects for CTA, OHare Airport, I DOT, ISTHA, and CDOT. He is knowledgeable in IDOT, CDOT, and ISTHAs lighting pol icies, procedures and proper application of the National Electrical Code. Did de sign work for Traffic Signal projects for CDOT and IDOT projects. Mr. Mukherjee has prepared the QA/QC Specification for all electrical equipments such as Trans formers, Motors, Motor Control centers, UPS systems, and Switchgears while worki ng as a Chief Electrical Inspector with the QA/QC Team for Terminal 5 Venture Co nstruction Managers for Terminal 5 Building at OHare Airport. . Also has three y ears experience with the Landis and Gyr presently Siemens Building Automation Su pervisory System at Terminal 5. Worked as a member of OHare Modernization Progra m and reviewed and commented on Sectionalizer and Transformer pad layouts and co nduit interconnections to ComEd Manholes to ensure that all Runway project packa ges met ComEd requirements. EXPERIENCE OHare Modernization Program OHare Airport July 2006BPC Airport Group-2006-Present Reviewed and commented on Electrical Plans for the following projects with respe ct to ComEd Duct Bank Profile Sectionalizer/Transformer Pads and ComEd Manhole S tandard Details to ensure compliance with ComEd Standards. Also reviewed and com mented on 14L Glide Slope Shelter Electrical Plan, 14L Glide Slope Single Line D iagram for 25KW, 240/120V Stand-By Engine Generator, 200A 3 Pole Automatic Trans fer Switch and Shelter Panelboard wiring diagram. Prepared review comments on 32 R Localizer Shelter Plan with references to Coax Cables, control cables and powe r cables for Localizer Antennae. The projects were as follows: Attended deign co ordination meetings with ComEd and Construction Managers to resolve field issues and provide solutions as required. Reviewed ComEd design by Consultant to ensur e design was cost effective and Economical and Constructible. Displace Threshold for Runway 14L Relocation of Mount Prospect Road and Guard Po st 1 North Airfield Runway 9L-27R Site Preparation South Basin Site Prep HIGHLIGHTS Professional Engineer Electrical Engineer Lighting-Traffic Signals-Power systems-ComEd 29 Years Experience IDOT Certified Contract Quantities Airport Experience (Landside/Building/Airside Lighting Power-Navaids) SUBRATA MUKHERJEE, PE (ELECTRICAL) 951 WILSHIRE CT, VERNON HILLS, IL 60061 PHONE (847):927-0849 2 of 4 Runway 10L-28R Extension Runway and Taxiway Paving and Electrical North Airport Traffic Control Tower with special emphasis on ensuring that the Transformer Vau lt met all ComEd Utility company standards. 9L-27R Navaids package-Review of (1) NASR-9 Single Line Diagram, (2) NASR-9 Electrical Site plan (3) NASR-9 Grounding system plan using 4/0 Bare copper stranded counterpoise wire (4) Remote Transmitter Receiver (RTR) Facility Equipment Schedule/Power Panel wi ring diagram and Electrical site plan.(5) Review of Electrical underground FOTS Loop Duct Bank Plan. 1. Runway 9L-27R Lighting and Signing package review Airfield Electrical Layout plan 2. Runway 9L-27R Lighting and Signing package review Runway Center Light details 3. Runway 9L-27R Lighting and Signing package review Type 1 Marker Light Base de tails Kam Engineering Co. 2002-2006

ISTHA Tri State Toll way M.P.00 to M.P.17.7. Chicago, Illinois. Lighting Design Engineer responsible for photometric calculations, lighting layout for underpass lighting and gore areas for the project using Microsite Lite software to ensure ISTHA illumination requirements were met. IDOT Dan Ryan Expressway, Chicago, Illinois. Lighting Design Engineer: 31st to 4 1st expressway. Did all field checks to locate all lighting controllers serving all ramp lighting, expressway median lighting and underpass lighting. Mr. Mukher jee indicated circuit identification for each luminaire within the project limit s and marked plans to indicate the same. CDOT Nagle Ave over I-90: Chicago, Illinois. As a sub consultant to Collins Engineers, Inc Subrata was responsible for the Ap proach Roadway/Bridge lighting on Nagle Ave between Gregory Ave and Bryn Mawr Av e and underpass lighting on I-90 under Nagle Avenue. Work included a final PS&E (Plans Specifications and Cost Estimate). CDOT Lower Wacker Drive Reconstruction Project, Chicago, Lighting Design Engineer and responsible for developing a set of electrical plan s and 911 call box layout/ conduit plan. He calculated Voltage drops calculation s for individual lighting circuits for tunnel lighting and associated SUBRATA MUKHERJEE, PE (ELECTRICAL) 951 WILSHIRE CT, VERNON HILLS, IL 60061 PHONE (847):927-0849 3 of 4 conduit and junction box sizing. He is responsible for electrical plans for comp lete lighting layout for Upper and Lower Wacker Drive and completed special phot ometric calculations to ensure that the tunnel lighting layout conformed to RP-2 2 for day and night conditions for the NB Tunnel between Monroe and Madison. Mr. Mukherjee prepared electrical load calculations for Com Ed to ensure sufficient primary capacity to handle all power requirements for lighting; traffic signali ng, fire alarm systems-911 and Bascule Bridge lift bridge motor loads. Mr. Mukhe rjee sized rectifier banks, transformers and switchgears to provide complete pac kage electrical system. He coordinated all work with city of Chicago Structural/ Bureau of Electricity to ensure all local standards were met and electrical layo ut was coordinated with landscaping consultant to ensure lighting pole location did not conflict with planter locations. IDOT IL-53 at I-55, Chicago, (IDOT Project) As a Lighting Design Engineer completed lighting layout, wiring diagram underpas s lighting layout, details, sign electric connection wiring diagram and voltage drop calculations and photometric. Mr. Mukherjee completed lighting design for P artial Interchange Lighting at IL-53, Underpass Lighting at IL-53 under I-55, Ov erhead Sign Lighting, and Major Urban Arterial Lighting on IL-53. City of Chicago Lighting Project, Chicago, Illinois. As a Lighting Design Engineer was responsible for the Lighting on S. Racine Aven ue from W. 39th to W. 35th and on W. 37th street between Racine and Morgan. He p erformed photometric calculations, voltage drop calculations, circuit orientatio n and circuit wiring diagrams. His work included a final PS&E.(Plans Specificati ons and Cost Estimate) Delta Engineers 2001-2002 CTA Ravenswood (Brown) Line: (Chicago). As a Design Electrical Engineer for expansion of Addison station, Irving Park, M ontrose station, Damen station and Kedzie he performed calculations for the enti re electric load for lighting, power, heating, elevators, communication panel an d concessions panel. He completed single line diagram with provision for Automat ic Transfer Switch, Generators, UPS, and Reliable Service Distribution panel for lighting, power and communication needs. Also sized all panels Automatic Transf er switch etc and finalized electrical equipment layout in the assigned space al located in the Electrical Rooms for each Station. UBM Engineering 2000-2001 Terminal 6 Apron/Taxiway Improvements: (Chicago). As a Project Electrical Engineer for aviation improvement project at OHare Airpo rt. Reviewed specifications related to airfield lighting circuits powered

SUBRATA MUKHERJEE, PE (ELECTRICAL) 951 WILSHIRE CT, VERNON HILLS, IL 60061 PHONE (847):927-0849 4 of 4 by a constant current regulator operating at a nominal 5000 volts maintaining a constant current of 6.6amps at the transformer primary. He ensured that isolatio n transformers were provided at each light on an airfield lighting series circui t to maintain circuit continuity when a particular light fails or the fixture is damaged. OHare Airport Parking Lot Project, Chicago, Illinois As an Electrical Engineer monitored and controlled all electrical testing and in stallation work and did cost estimates related to all change order work. Globetrotters Engineering 1989-2000 OHare Development Project - Chicago, Illinois Chief Electrical Inspector respons ible for the International Pumping station at OHare. Prepared single line diagra m, motor control center layout and lighting layout plan. He managed and monitore d construction and QA/QC for all electrical bid packages covering pumping statio n, terminal building, taxiway, and roadway lighting, underground duct bank, powe r distribution, special/security systems and others Did inspection, analysis and reporting on results of load run test performed on 160kw Caterpillar engine gen erator set. Submitted Technical report on Corona test on 15KV power cable and 35KV AC test per AEIC st andards at Pirelli plant in Colusa, California. Prepared single line diagram, Mo tor Control Center layout and lighting layout plan for the International Pumping station at OHare. Managed and monitored construction and QA/QC for all electric al bid packages covering pumping station, terminal building, taxiway and roadway lighting, underground duct bank, power distribution, special/security system an d others. EDUCATION & REGISTRATION - Bachelor of Science in Electrical Engineering, Indian Institute of Technology, Kharagpur, India - Professional Engineer: Illinois#062-052419 CERTIFICATIONS - IDOT Documentation Of Contract Quantities - Introduction to Programmable Logic Controllers 4-PDH Hours - Overview & Energy Optimization of Power Distribution Transformers 4-PDH Hours - Introduction to Short Circuit Analysis 4-PDH Hours. - Uninterruptible Power Supply System Selection, Installation and Maintenance. 1 2-PDH Hours.

You might also like