PROFESSIONAL SUMMARY Technical Manager with over 20 years experience in Data Center Facilities Manage ment and Asset

Management Hardware. Also includes Project Coordination, Install ation, Planning and Design. Professional Experience Sanofi Aventis, (Consultant) Bridgewater, NJ 1/1998 2/2011 Asset Management Coordinator 1/2009 - 2 /2011 Maintain accountability of hardware received in supporting the function of asse t tagging hardware, recording data documentation and input to the asset reposito ry. Provide repository reporting as needed to validate Sanofi-Aventis hardware p lacement. Coordinates hardware shipment as required for Regional Business Offices and Dis tribution Centers throughout North America. Palletize, package and coordinate shipment schedule with outside vendor per Ass et Management process and procedures. Fills emergency orders as requested, working with warehouse driver. Updates Asset repository to document hardware movement per Asset Management gui delines. Maintain accountability of all devices received and/or released from the New Je rsey centralized receiving location in support of the IMAC Process using Peregri ne Asset Center and BMC Remedy Asset Management systems. Assists in preparing records for fixed asset inventory. Performs cycle counts on a monthly and quarterly basis as required per standard operating procedures. Assists in periodic and annual inventories. Operates and maintains fork lift and related equipment used in the warehouse. Operate within standard operating procedures (SOPs) and EHS guidelines. Data Center Facilities Manager 1/1998-1/2009

Managed two multi-million dollar Data Centers simultaneously. Directly responsible for all electrical power installation, coordination with A ventis Maintenance Team and outside vendors. Analyze site and consult with clientele to determine spatial requirements for s erver equipment. Supervise / Coordinate all network and phone line installations. Develop floor system installation plans to maximize available space and efficie ncy. Implement and maintain Data Center Security Access System. Maintain maintenance schedule for Liebert AC Units and MGE PDUs and UPS Systems Schedule all equipment installations with the sanofi-aventis Maintenance Team t o insure a safe and secure working environment. Serve as liaison between engineers and vendors. Interface with vendors, security maintenance and customers for any Data Center activities.

Merrill Lynch TGA (Consultant), Princeton Junction 997 Merrill Lynch TGA (Consultant) Princeton Junction, NJ Project Coordinator June 1997-December 1997

6/1997 12/1

Work exclusively with Merrill Lynch TGA (Trusted Global Advisor) Windows NT rol lout. Manage projects to ensure that all major milestones are met, and that implement ation and prescribed activities are carried out in accordance with contractual a greements. Manage various tasks over a 210 day schedule including: site surveys, ordering telecommunication lines, meeting site construction/cabling deadlines, ordering h ardware, configuration of users, user rights, Installation of temporary training LAN and final installation of LAN, network p rinters and workstations. Install software including Microsoft Windows NT Server and Workstation, MS Offi ce 97 and Merrill Lynch proprietary software. Responsible for the complete office configuration including cabling, power, con struction and conduit issues. Experience prior to 1997, Major National Insurance Company Analyzed sites and consulted with internal clientele to determine functional an d spatial requirements. Planned layouts and drafted scale and full size blueprints/schematics. Integrat ed engineering elements such as water and electrical power distribution systems, including B&T and fiber optic cables, into unified design. Utilized AutoCAD to maintain master plans of computer room layouts. Sourced vendors/providers of strategic supplies and services to negotiate and f inalize favorable terms and conditions of contractual purchase service agreement s. Supervised installation and functional/safety testing of climate control system s critical to maintaining systems efficiency. Managed projects concerned with planning and design of space to accommodate Net works and Mainframes. Military: Honorable discharge from United States Naval Reserve Software: VM/MVS Systems, ESCON. Peregrine Asset Center, BMC Remedy Asset Management, Au toCad. Hardware: IBM PCs and Compatibles, LAN, WAN, IBM Series 3090, 9X2 and CMOS, HDS EX Series 100 and 700/1400 IBM 3880/3990 DASD, Controllers, 3745 FEPs, 3480 Tape Drives, HDS 7380/7690/7700/7880/7990 DASD Controllers. EMC5500 DASD, RAIDs. Xerox, HP, IBM printers. Del l, IBM, Compaq and HP 19 and 24 Monitors. HP Proliant DL360, DL380, DL580, DL585, BL460c Half He ight Blade Intel Processor, BL465c Half Blade AMD Processor. HP 9000 RP3440, RP7410, RP8400 HP-UX O perating System, SUN Sunfire V490 V240 Servers.