You are on page 1of 3

MILAN DEDEK 2400 E.

Preserve Way, Apartment 203 Miramar, Florida 33025 Mobile phone: (954) 554-7161 Home phone: (954) 237-7224 E-mail: md124ba0e@westpost.net PROFESSIONAL COMPETENCIES *Self-motivated professional with over 28 years of experience in the constructio n / engineering industry from design through construction including scheduling w hile ensuring product quality. *Administered construction, design and engineering while managing a CAD design g roup. *Team player willing to share industry knowledge and experience to achieve goals . *High achiever with excellent record for adhering to budgets and schedules while exhibiting leadership in construction and field supervision of crafts and surve ying. *Demonstrated expertise and strong technical abilities in as-builts and walk dow ns, CADD knowledge and proficiency, cost estimating, scheduling, architectural a nd mechanical design including architectural systems, layout, pipe and piping su pports. *Attuned to innovations and streamlining processes through standardization and p rocedures. *Demonstrated skills for specification writing and reviews, shop drawing reviews and approvals as well as constructability reviews and conflict resolutions. *Experienced with the procurement of Change Orders, review and approval of estim ates and negotiating costs with regard to Change Order scopes, cost estimating a nd material take-offs. *Served as a liaison between architects, clients and contractors to ensure quali ty, budget and building code adherence. Represented architect/engineering firms during pre-bid, bidding, pre-construction and construction project phases. Faci litated project drawing approval process with Building and Zoning Departments wh ile resolving their concerns. PROFESSIONAL EXPERIENCE and ACHIEVEMENTS PARSONS Corporation, Pasadena, California, 12/2007 to 1/2011 Senior Project Engineer: Miami International Airport-North Terminal Development? Miami, FL, a 160 million project * Responsible for all phases of construction engineering for expansion and renov ation of B-C Terminal area. The B-C Terminal area consists of three separate de sign projects covering more than 425,000 sq. ft. of new terminal space. The B-C area contains 600 linear ft. of new ticket counters, 60,000-sq.-ft. airline tick et office support areas, a TSA check point, and four aircraft gates. The project includes development of the North Terminal to provide enhanced operating capabi lity and improved levels of passenger service, which involve the construction of an entirely new terminal within the existing terminal space, with minimal impac t to the tenants. Involved in every facet of daily activities of the project res olving field conflicts on the spot, a leader of Engineering Team, overseeing cre ation of reports for upper management. * Responsible for timely processing of construction related documents such as Re quest for Information documents, RFIs and Trade Contractor's Submittals which in cludes implementation of changes to work also the creation of area punchlists an d corrected item closure and acceptance along with team of Architects. Anil Verma Associates, Los Angeles, California, 6/2007 to 12/2007 Senior Construction Manager: Los Angeles Trade-Technical College ? Los Angeles, California, a 78 million project * Managing construction of two college buildings called South Campus Project.

Involved in every facet of daily activities of the project, managing the Archite ct of Record, the General Contractor and interacting with the Inspector of Recor d ensuring the construction is executed per the Contract Documents and Codes. * Responsible for monitoring Contract expenditures and payments, negotiating cha nge orders and monthly Applications for Payment for both the General Contractor and the Architect of Record. Borrelli & Partners, Miami, Florida, 3/2003 to 6/2007 Senior Field Architectural Representative: Miami International Airport in Miami, Florida, a 700 million project * Representing an architectural firm with signatory authority to approve archite ctural design and finish submittals according to contract specifications and des ign drawings in addition to conflict resolution and translation of requirements to construction engineers. * Responsible for surveillance of construction quality and methods in constructi on of 1.2 million square feet at the Miami International Airport South Terminal with regard to implementation of architectural features including life safety, b uilding codes and ADA compliance and Baggage Handling System. Anil Verma Associates, Ft. Lauderdale, Florida, 11/2000 to 3/2003 Senior Project Coordinator: Tren Urbano subway stations in San Juan, Puerto Rico , a 900 million project * Representing an out of state architectural firm with signatory authority to ap prove architectural design and finish submittals according to contract specifica tions and design drawings in addition to intra trade conflict resolution and cla rification of requirements to construction engineers. * Responsible for surveillance of construction quality and methods in two subway stations? architectural finishes with regard to implementation of architectural features including life safety and ADA compliance. URS O'Brien Kreitzberg, Inc., Ft. Lauderdale, Florida, 2/1999 to 11/2000 Assistant Project Manager: Project: Ft. Lauderdale-Hollywood International Airpo rt Expansion, a 25 million project * Responsible for overseeing construction activities for three Terminal Refurbis hment projects worth approximately $25 million to update 15-year-old airport ter minals. * Directed implementation of architectural finishes, related to refurbishing of elevators, escalators in compliance with Project Design Drawing, ADA, NFPA and B uilding Codes. * Accountable for resolutions to RFIs, approval of contractor submittals and Fie ld Order preparation. * Defined scopes of work for Requests for Proposal to the Contractors for securi ng negotiated costs of additional work and procurement of Contractors? C.O. Senior Field Inspector: Project: Ft. Lauderdale-Hollywood International Airport Expansion Responsible for monitoring, inspections of construction activities at Terminal 4 . Accomplishments * Coordinated the design and installation of all new Millwork at all Terminals a nd Concourses. Stone & Webster Engineering Corporation, Aventura, Florida, 7/1989 to 1/1999 Principal Engineer: CADD Manager/Project Coordinator * Responsible for directing activities of multidiscipline design group using CAD D applications for the contract design drawings with architects, engineers for t he following projects: * William M. Karr Architects, St. Thomas, U.S.V.I.: New Banco Popular Bank Build

ing, U.S.V.I.: Refurbishment and modification of hotels at numerous locations da maged by a hurricane in the Caribbean basin. * Metropolitan Dade County, Miami, Florida: Solid Waste Management - Fleet Maint enance Facilities. * Pinellas County, St. Petersburg, Florida: Resource Recovery Facility - Residen t Engineer for APC retrofit of existing 'Trash to Energy' Power plant worth appr oximately $80 million. * Florida Power & Light Company: St. Lucie Nuclear Power Plant - Resident Engine er for installation of the Condenser Tube Cleaning System. * Florida Power & Light Company: Turkey Point Nuclear Power Plant - Project Engi neer for plant as-built justifications related to CD revisions and updates. * Puerto Rico Electric Power Authority, San Juan, Puerto Rico: Design of EPA man dated system retrofit modifications and additions at four power plants. Stone & Webster Engineering Corporation, Boston, Massachusetts, 7/1971 to 3/1989 Senior Engineer / Design Engineer / Lead Senior Designer and Chief Design Checke r * Managed and directed instrumentation field design group at Beaver Valley, PA. * Responsible for CAD functions, planning, scheduling and drawing conversion of manual diagrams into the Intergraph System. * Responsible for design and checking design drawings for numerous nuclear power plants which led to a long-term assignment at Beaver Valley Power Station, Penn sylvania. Major Projects worked on: * Virginia Electric and Power Company: North Anna Power Station, Richmond, VA * Virginia Electric and Power Company: Surry Power Station, Surry, VA * Boston Edison Company: Pilgrim Power Station, Plymouth, MA * Northeast Utilities: Millstone Power Station, CT * Yankee Atomic Electric Company: Yankee Rowe Power Station, Rowe, MA * Power Authority of the State of New York: James FitzPatrick PS, Oswego, NY * Duquesne Light Company: Beaver Valley Power Station in PA near Pittsburgh Accomplishments * Designs for Reference Nuclear Power Plant, which received U.S.- N.R.C. approva l for construction at any site located in the United States of America. EDUCATION: Technical Degree, 1962, School of Technology, Ostrava, Czech Republic Major: Steam Turbines and Boiler Technology - Engineering and Design PROFESSIONAL: Licensed General Contractor in the State of Florida INFORMATION TECHNOLOGY EXPERIENCE: AutoCAD; Microsoft Office; MicroStation, Primavera

You might also like