You are on page 1of 9

NO 1 1.

WLL Model-2 Civil Works B.O.Q. DESCRIPTION Aluminum Partition 1#Aluminum Partition:Construction of aluminum partition 2#4" wide, 2mm thick, silver dual finish premium quality 3#Providing and fixing of 5mm thick white glass in construction of aluminum partition. ALCO

Material Brand

Unit

Rate (Rs.)

P.S ft

1.2

Aluminum doors providing & fixing fully glazed silver anodized Aluminum doors with or without fixed panels premium model with 100mm45mm frame mullions 150mm45mm aluminum section 25mm thick rubber gaskit, handless and built in locking arrangement, ALCO floor Aluminum Kick Plates:Providing and fixing fo aluminum kick plates at a height of 3 fiit in construction of aluminum partition. Door closer: providing & fixing in position automatic door closers(door mounted) Brick Partition Making of 9brick wall with sand cement ratio 1:6 including plaster, 0.5 thick 1:4 cement/sand plaster on the both sides. Steel door providing & fixing with fixed panels model with 100mm45mm frame mullions 150mm45mm section 25mm thick rubber gasket, handless and built in locking arrangement. (1m*2.4m) Painting Providing and applying complete paint plastic emulsion equipment room (Walls will be painted with at least 2-coats of synthetic emulsion (interior) and 2-coats of weather shield on (external)walls.(if required) False ceiling Providing & laying suspended acoustic ceiling consisting of gypsum fiber tiles, suspension system, access panel rough 0 hardware extra support and suspension system around voids complete.(If the existing room is of RCC Roof slab and concrete is fair faced Vinyl Floor Providing &laying vinyl tiles of approved colors, shade make &design on existing cemented floor including dressing, leveling & cleaning DELUXE and also preparing the surface for proper fixing for vinyl tiles by using excellent quality of adhesive in sub item giv Ceiling Light Provision of 4(40W 4ft.) fluorescents lamp light with complete installation in ceiling. Or Provision of 2ft.2ft. Single unit with 4*(20w-2ft.) fluorescents Lamp light with complete installation in ceiling. Electric system ALCO

P.S ft

1.2 1.3 2 2.1 2.2 3 3.1 4 4.1 5 5.1 6 6.1 7

P.S ft P. unit P.S ft P. S ft

ICI

P.S ft

DIAMOND

P.S ft

P.S ft

Phillips,Sunlights

P. unit

7.1

switch:Crystal Royal Provision & installation of switch for light including wiring from switch to light with 3/036 CU PVC insulated 45/750 volt grade cable with cable:Pakistan cable,Newage cable run in heavy duty PVC write as EPC steel box of appropriate dimension recessed on walls PVC Conduit:BETA

P. unit

7.2

switch:Crystal Royal Provision &Concealed wiring of Power Socket 15A (5-pin multipurpose) outlet points away from room switch board with 7/036 CU PVC cable:Pakistan cable,Newage cable, P. unit insulated 45/750 volt grade cable with run in heavy duty PVC write as EPC steel box of appropriate dimension recessed on walls PVC Conduit:BETA

7.3

Provision &Concealed wiring of Power Socket 5A (2-pin ) outlet points away from room switch board with 3/036 CU PVC insulated 45/750 volt grade cable with run in heavy duty PVC write as EPC steel box of appropriate dimension recessed on walls including al

Switch Socket:Tenby,Crystal Royal Cable:Pakistan cable,Newage cable, P. unit PVC Conduit:BETA

7.4

Provision & installation of Power Socket 16A switch sockets for Airconditions , including (7/044 CU PVC insulated 45/750 volt grade cable with run in PVC Duct)wiring from switch to ACDB etc. Installation of ACDB including all the inside circuit breakers as per drawing/specifications provided by Huawei Installation of DB including all the inside circuit breakers as per drawing/specifications provided by Huawei Provision & installation of AC power cable in PVC conduit (16mm*4core) Earthing system Making Two bores or Earth pits 4' x 4' x 20'(L x W x D) Complete with 70 mm copper rope, 1.5" G.I. pipe , , value of earthing must be less than 1 Ohms, including copper plates, Earth bar in one of the manholes, manholes etc & all other related materials Making One bores or Earth pits 4' x 4' x 20'(L x W x D) Complete with 70 mm copper rope, 1.5" G.I. pipe , , value of earthing must be less than 1 Ohms, including copper plates, Earth bar in one of the manholes, manholes etc & all other related materials installation of earth connecting box with eathing copper bar as per drawing Providing and connect 70 mm Single Core Power Cable from earth pit to bus bar PVC Pipe for Cable(2Diameter) Copper Rope Outside Cable Bridge

Switch Socket:Crystal Royal Cable:Pakistan cable,Newage cable, P. unit Dura Duct Circuit breaker:LG,AEG Circuit breaker:LG,AEG Cable:Pakistan cable,Newage cable PVC Conduit:BETA P. unit P. unit P.m

7.6 7.8 7.9 8 8.1

P. unit

8.3 8.6 8.7 8.8 8.9 9

P. unit P. unit P. m P. m P. m

9.1

Provision of cable ladder with support between tower and equipment room and what so ever necessary to givethe product workmanlike completed as per drawings/specifications.. -Hot Dip Galvanized installation of cable ladder with support between tower and equipment room and what so ever necessary to givethe product workmanlike completed as per drawings/specifications.. -Hot Dip Galvanized

P. m

9.2

P. m

10 DG and Fuel tank foundation pad 10.1 DG pad (in door) construction as per drawing/specifications provided by Huawei. Optional if Huawei required) ( 10.2 DG Plateform construction as per drawing/specifications provided by Huawei.Optional if Huawei required) ( 11 Miscellaneous(optional)

P.unit P.unit

NO

DESCRIPTION

Material Brand

Unit

Rate (Rs.)

Any civil work required on each site ,except all above items , including but not limit to: 1 Making break through in walls 10*10with complete finishing. 2 Excavation, Backfilling. 3 Dismantling of Aluminium Partition and existing brick,,including cleaning rubbish. 4 Removal Vinyl Tiles with floor preparation/cleaning 11.1 5 Roof treatment/plastenring of roof in patches in cementsand 1:4 with scapping of damaged part, bringing in regular shape and removal of debris etc. 6 Dismantling of window/door, wooden or framed with or without hold fast in ground floor including cutting of walls,stacking salvage and removal of debris 7 Dismantling of iron cable ladder, including torch cutting with or without hold holdfast stacking salvage and removal of debris. 8 concrete base for outdoor feed ladder 600mm x 500mm x 400mm(L xW x D),PCC concrete(1:2:3),Lean concrete(1:4:8)

P. site Lump. sump

Page 1 of 7

WLL Model-3 Civil Works B.O.Q.


Item No.
1 1.1 1.1.1 1.2 1.2.1

Description
SITE PREPARATION / INFRASTRUCTURE

Unit

Quantity

Unit Price (PKR) Total Amount (PKR)


ET & HRCP ET & HRCP

Site cleaning Site Cleaning & Grubbing/stripping and unidentified underground obstructions. The subcontractor shall keep the work & storage areas clean & tidy & shall daily remove the rubbish from inside & near set building & plants. Boundary Wall and Main Entrance Gate Provision & Installation of Wall ( with 1:4 c/s mortar & plaster on both sides), Angle Iron Posts, 3 galvanized barbed wire installed on top of the wall with all necessary tension devices and what so ever necessary to give the product workman like completed as per drawings/specifications Provision & Installation of Main Entrance Gate 8' height double leaf and what so ever necessary to give the product workman like completed as per drawings/specifications Cable Ladder with Support Provision of Cable ladder with support between tower and equipment room and what so ever necessary to give the product workman like completed as per drawings/specifications (Optional) Installation of Cable ladder with support between tower and equipment room and what so ever necessary to give the product workman like completed as per drawings/specifications Subtotal (1) rm

0.00

0.00

1.2.2 1.3 1.3.1

set

0.00

rm

0.00

1.3.2

rm

0.00 0.00

2 2.1 2.1.1 2.2 2.2.1 2.2.2 2.3 2.3.1

ELECTRIFICATION Power Cable Provision & Laying of Power cable from WAPDA power meter to ACDB, including burying 2' in mm PVC pipe and what so ever necessary to give the product workman like completed as per drawings/specifications Electricity system 50 rm 0.00

Provision & Installation of Indoor Electricity system and what so ever necessary to give the product workman like completed as per drawings/specifications (excluding ACDB, MCCB, ECB supply) Provision of ACDB, MCCB, ECB (Optional)* GST Included

set set

0.00 0.00

Emergency Light Provision & Installation of Emergency light and what so ever necessary to give the product workman set like completed as per drawings/specifications Subtotal (2) EARTHING & LIGHTNING PROTECTION SYSTEM Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (3 Pits with Alternate 1) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (1 Pit add with Alternate 1) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (3 Pits with Alternate 2) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (1 Pit add with Alternate 2) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (3 Pits with Alternate 3) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (1 Pit add with Alternate 3) Subtotal is only for Item 3.1.1 (3) EQUIPMENT ROOM Building works of Equipment Room Room foundation including excavation and backfilling and what so ever necessary to give the product workman like completed as per drawings/specifications Building structure and roof construction and what so ever necessary to give the product workman like completed as per drawings/specifications Plaster work inside and outside and what so ever necessary to give the product workman like completed as per drawings/specifications Provision & Application of Paint and what so ever necessary to give the product workman like completed as per drawings/specifications Flooring for Room and what so ever necessary to give the product workman like completed as per drawings /specifications Provision & Installation of Steel Door & accessories and what so ever necessary to give the product workman like completed as per drawings/specifications Subtotal (4)

0.00 0.00

3 3.1.1

Per Site

0.00

3.1.2

Per Site

0.00

3.2.1

Per Site

0.00

3.2.2

Per Site

0.00

3.3.1

Per Site

0.00

3.3.2

Per Site

0.00 0.00

4 4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 4.1.6

set set set set set set

0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Amount (1+2+3+4)


5 5.1 5.1.1 5.2 5.2.1 5.2.2 5.3 5.3.1 OPTIONAL WORKS Access roads for Greenfield site Access roads works and construction in normal material (5m wide and 300mm thick) Backfilling of compound with clean fill materials Backfilling of compound with clean fill ordinary materials Backfilling of compound with gravel Brick paving with 1:3 c/s over 1" sand layer Brick paving with 1:3 c/s over 1" sand layer sq m cu m cu m rm

0.00

0.00 0.00 0.00 0.00 Page 2 of 7

WLL Model-4 Civil Work B.O.Q.


Item No.
1 1.1 1.1.1 1.2 1.2.1

Description
SITE PREPARATION / INFRASTRUCTURE Site cleaning Site Cleaning & Grubbing/stripping and unidentified underground obstructions. The subcontractor shall keep the work & storage areas clean & tidy & shall daily remove the rubbish from inside & near building & plants. Boundary Wall and Main Entrance Gate Provision & Installation of Wall ( 9" thick brick wall with 1:4 c/s mortar & plaster on both sides), Angle Iron Posts, 3 galvanized barbed wire installed on top of the wall with all necessary tension devices and what so ever necessary to give the product workman like completed as per drawings/specifications Provision & Installation of Main Entrance Gate 8' height double leaf and what so ever necessary to give the product workman like completed as per drawings/specifications Cable Ladder with Support Provision of Cable ladder with support between tower and equipment room and what so ever necessary to give the product workman like completed as per drawings/specifications (Optional) Installation of Cable ladder with support between tower and equipment room and what so ever necessary to give the product workman like completed as per drawings/specifications Subtotal (1)

Unit

Quantity Unit Price (PKR) Total Amount (PKR)


ET & HRCP ET & HRCP

set

0.00

rm

0.00

1.2.2 1.3 1.3.1

set

0.00

rm

0.00

1.3.2

rm

0.00 0.00

2 2.1 2.1.1 2.2 2.2.1 2.2.2 2.3 2.3.1

ELECTRIFICATION Power Cable Provision & Laying of Power cable from WAPDA power meter to ACDB, including burying 2' in 50 mm PVC pipe and what so ever necessary to give the product workman like completed as per drawings/specifications Electricity system Provision & Installation of Indoor Electricity system and what so ever necessary to give the product workman like completed as per drawings/specifications (excluding ACDB supply) Provision of ACDB, MCCB, ECB (Optional)* GST Included Emergency Light Provision & Installation of Emergency light and what so ever necessary to give the product workman like completed as per drawings/specifications Subtotal (2) EARTHING & LIGHTNING PROTECTION SYSTEM Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (3 Pits with Alternate 1) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (1 Pit add with Alternate 1) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (3 Pits with Alternate 2) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (1 Pit add with Alternate 2) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (3 Pits with Alternate 3) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (1 Pit add with Alternate 3) Subtotal is only for Item 3.1.1 (3) EQUIPMENT - GUARD - BATH ROOM Building works of Equipment room, Guard room , Bath Room Rooms foundation including excavation and backfilling and what so ever necessary to give the product workman like completed as per drawings/specifications Building structure and roof construction and what so ever necessary to give the product workman like completed as per drawings/specifications Plaster work inside and outside and what so ever necessary to give the product workman like completed as per drawings/specifications Provision & Application of Paint and what so ever necessary to give the product workman like completed as per drawings/specifications Flooring for Rooms and what so ever necessary to give the product workman like completed as per drawings /specifications Provision & Installation of Steel Door & accessories and what so ever necessary to give the product workman like completed as per drawings/specifications Provision & Installation Aluminum window with 5mm Tinned Glass and what so ever necessary to give the product workman like completed as per drawings/specifications Provision & Installation Aluminum ventilator with 5mm Tinned Glass and what so ever necessary to give the product workman like completed as per drawings/specifications Provision & Installation of Sanitary & Sewerage system incl. architectural works and what so ever necessary to give the product workman like completed as per drawings /specifications Subtotal (4)

rm

0.00

set set

0.00 0.00

set

0.00 0.00

3 3.1.1

Per Site

0.00

3.1.2

Per Site

0.00

3.2.1

Per Site

0.00

3.2.2

Per Site

0.00

3.3.1

Per Site

0.00

3.3.2

Per Site

0.00 0.00

4 4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 4.1.6 4.1.7 4.1.8 4.1.9

set set set set set set set set set

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5 5.1 5.1.1

DG and fuel tank foundation pad supply and construction DG and fuel tank foundation pad supply and construction DG and fuel tank foundation pad supply and construction as per drawings Subtotal (5) set 0.00 0.00

Total Amount (1+2+3+4+5)


6 6.1 6.1.1 6.2 6.2.1 6.2.2 6.3 6.3.1 OPTIONAL WORKS Access roads for Greenfield site Access roads works and construction in normal material (5m wide and 300mm thick) Backfilling of compound with clean fill materials Backfilling of compound with clean fill ordinary materials Backfilling of compound with gravel Brick paving with 1:3 c/s over 1" sand layer Brick paving with 1:3 c/s over 1" sand layer sq m cu m cu m rm

0.00

0.00 0.00 0.00 0.00 Page 3 of 7

WLL Model-5 Civil Work B.O.Q.


Item No.
1 1.1 1.1.1 1.2

Description
SITE PREPARATION / INFRASTRUCTURE Site cleaning Site Cleaning & Grubbing/stripping and unidentified underground obstructions. The subcontractor shall keep the work & storage areas clean & tidy & shall daily remove the rubbish from inside & near building & plants. Boundary Wall and Main Entrance Gate Provision & Installation of Wall ( with 1:4 c/s mortar & plaster on both sides), Angle Iron Posts, 3 galvanized barbed wire installed on top of the wall with all necessary tension devices and what so ever necessary to give the product workman like completed as per drawings/specifications Provision & Installation of Main Entrance Gate 8' height double leaf and what so ever necessary to give the product workman like completed as per drawings/specifications Cable Ladder with Support Provision of Cable ladder with support between tower and equipment room and what so ever necessary to give the product workman like completed as per drawings/specifications (Optional) Installation of Cable ladder with support between tower and equipment room and what so ever necessary to give the product workman like completed as per drawings/specifications Subtotal (1)

Unit

Quantity Unit Price (PKR) Total Amount (PKR)


ET & HRCP ET & HRCP

set

0.00

1.2.1

rm

0.00

1.2.2 1.3 1.3.1

set

0.00

rm

0.00

1.3.2

rm

0.00 0.00

2 2.1 2.1.1 2.2 2.2.1 2.2.2 2.3 2.3.1

ELECTRIFICATION Power Cable Provision & Laying of Power cable from WAPDA power meter to ACDB, including burying 2' in mm PVC pipe and what so ever necessary to give the product workman like completed as per drawings/specifications Electricity system Provision & Installation of Indoor Electricity system and what so ever necessary to give the product workman like completed as per drawings/specifications (excluding ACDB, MCCB, ECB supply) Provision of ACDB, MCCB, ECB (Optional)* GST Included Emergency Light Provision & Installation of Emergency light and what so ever necessary to give the product workman like completed as per drawings/specifications Subtotal (2) EARTHING & LIGHTNING PROTECTION SYSTEM Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (Per Site Pits with Alternate 1) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (Per Site Pit add with Alternate 1) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (Per Site Pits with Alternate 2) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (Per Site Pit add with Alternate 2) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (Per Site Pits with Alternate 3) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (Per Site Pit add with Alternate 3) Subtotal is only for Item 3.1.1 (3) EQUIPMENT ROOM Equipment Room Rooms foundation including excavation and backfilling and what so ever necessary to give the product workman like completed as per drawings/specifications Building structure and roof construction and what so ever necessary to give the product workman like completed as per drawings/specifications Plaster work inside and outside and what so ever necessary to give the product workman like completed as per drawings/specifications Provision & Application of Paint and what so ever necessary to give the product workman like completed as per drawings/specifications Flooring for Rooms and what so ever necessary to give the product workman like completed as per drawings /specifications Provision & Installation of Steel Door & accessories and what so ever necessary to give the product workman like completed as per drawings/specifications Subtotal (4) DG and fuel tank foundation pad supply and construction DG and fuel tank foundation pad supply and construction DG and fuel tank foundation pad supply and construction as per drawings Subtotal (5) set 0.00 0.00 set set set set set set 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 set 0.00 0.00 set set 0.00 0.00 50 rm 0.00

3 3.1.1

3.1.2

0.00

3.2.1

0.00

3.2.2

0.00

3.3.1

0.00

3.3.2

0.00 0.00

4 4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 4.1.6

5 5.1 5.1.1

Total Amount (1+2+3+4+5)


6 6.1 6.1.1 6.2 6.2.1 6.2.2 6.3 6.3.1 OPTIONAL WORKS Access roads for Greenfield site Access roads works and construction in normal material (5m wide and 300mm thick) Backfilling of compound with clean fill materials Backfilling of compound with clean fill ordinary materials Backfilling of compound with gravel Brick paving with 1:3 c/s over 1" sand layer Brick paving with 1:3 c/s over 1" sand layer sq m cu m cu m rm

0.00

0.00

0.00 0.00

0.00

Page 4 of 7

WLL Model-6 (Layout-1) Civil Work B.O.Q.


Item No.
1 1.1 1.1.1 1.1.2 1.2 1.2.1

Description
SITE PREPARATION / INFRASTRUCTURE Boundary Fence and Main Entrance Gate

Unit

Estimated Quantity

Unit Price (PKR)


ET & HRCP

Estimated Total Amount (PKR)


ET & HRCP

Provision & Installation of Boundary Galvanized Fence (10 SWG) with all necessary tension devices sq m and what so ever necessary to give the product workman like completed as per drawings/specifications Provision & Installation of Main Entrance Gate double leaf and what so ever necessary to give the set product workman like completed as per drawings/specifications Cable Ladder with Support Provision & Installation of Cable ladder with support between tower and equipment room and what so ever necessary to give the product workman like completed as per drawings/specifications Subtotal (1) rm

2 2.1 2.1.1 2.2 2.2.1 2.3 2.3.1

ELECTRIFICATION Power Cable Provision & Laying of Power cable from WAPDA power meter to ACDB, including burying 2' in mm PVC pipe and what so ever necessary to give the product workman like completed as per drawings/specifications Electricity system Provision & Installation of Indoor Electricity system and what so ever necessary to give the product workman like completed as per drawings/specifications (including MCB) Emergency Light Provision & Installation of Emergency light and what so ever necessary to give the product workman like completed as per drawings/specifications Subtotal (2) EARTHING & LIGHTNING PROTECTION SYSTEM Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (Per Site Pits with Alternate 1) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (Per Site Pit add with Alternate 1) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (Per Site Pits with Alternate 2) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (Per Site Pit add with Alternate 2) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (Per Site Pits with Alternate 3) Provision & Installation of Internal and external grounding/earthing system (less than 1 ohm) and what so ever necessary to give the product workman like completed as per drawings/specifications (Per Site Pit add with Alternate 3) Subtotal is only for Item 3.1.1 (3) EQUIPMENT ROOM & DG / FUEL TANK PAD Building works of Equipment room, DG and Fuel Tank Pad Building structure and roof construction and what so ever necessary to give the product workman like completed as per drawings/specifications Plaster work inside and outside and what so ever necessary to give the product workman like completed as per drawings/specifications Provision & Application of Paint and what so ever necessary to give the product workman like completed as per drawings/specifications Flooring for Room and what so ever necessary to give the product workman like completed as per drawings /specifications Provision & Installation of Steel Door & accessories and what so ever necessary to give the product workman like completed as per drawings/specifications Subtotal (4) set set set set set set set 50 rm -

3 3.1.1

3.1.2

3.2.1

3.2.2

3.3.1

3.3.2

4 4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5

Total Amount (1+2+3+4)

Page 5 of 7

WLL Phase II - Tower Foundation and Service (Type A)


Unit Price Item Description Unit Quantity
Open Raft Open Foundation Foundation Foundation (B (B cap=1 (B Cap=0.5 cap=0.75 TSF TSF) TSF) Pile Foundation

Total Amount
Open Foundation (B Open Foundation cap=1 TSF (B cap=0.75 TSF) Raft Foundation (B Cap=0.5 TSF)

Comments
Pile Foundation

ET & HRCP
A 2 30 M Self Supported Tower 2.1 Excavation 2.2 Backfilling 2.3 Concrete class A 2.4 Concrete class E 2.5 Reinforced Grade 60 Transportation of tower structure to 2.6 designated site (optional) 2.7 Tower erection 2.8 Painting Subtotal 4 40 M Self Supported Tower 4.1 Excavation 4.2 Backfilling 4.3 Concrete class A 4.4 Concrete class E 4.5 Reinforced Grade 60 Transportation of tower structure to 4.6 designated site (optional) 4.7 Tower erection 4.8 Painting Subtotal 6 50 M Self Supported Tower 6.1 Excavation 6.2 Backfilling 6.3 Concrete class A 6.4 Concrete class E 6.5 Reinforced Grade 60 Transportation of tower structure to 6.6 designated site (optional) 6.7 Tower erection 6.8 Painting Subtotal 8 60 M Self Supported Tower 8.1 Excavation 8.2 Backfilling 8.3 Concrete class A 8.4 Concrete class E 8.5 Reinforced Grade 60 Transportation of tower structure to 8.6 designated site (optional) 8.7 Tower erection 8.8 Painting Subtotal M3 M3 M3 M3 kg set set set M3 M3 M3 M3 kg set set set M3 M3 M3 M3 kg set set set M3 M3 M3 M3 kg set set set B C

H=C X D

I= C X E

J= C X F

K= C X G

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 6 of 7

WLL Phase II - Tower Foundation and Service (Type B)


Unit Price Item Description Unit Quantity
Open Raft Open Foundation Foundation Foundation (B (B cap=1 (B Cap=0.5 cap=0.75 TSF TSF) TSF) Pile Foundation

Total Amount
Open Foundation (B Open Foundation cap=1 TSF (B cap=0.75 TSF) Raft Foundation (B Cap=0.5 TSF)

Comments
Pile Foundation

ET & HRCP
A B C

H=C X D

I= C X E

J= C X F

K= C X G

2 30 M Self Supported Tower 2.1 Excavation 2.2 Backfilling 2.3 Concrete class A 2.4 Concrete class E 2.5 Reinforced Grade 60 Transportation of tower structure to 2.6 designated site (optional) 2.7 Tower erection 2.8 Painting Subtotal 4 40 M Self Supported Tower 4.1 Excavation 4.2 Backfilling 4.3 Concrete class A 4.4 Concrete class E 4.5 Reinforced Grade 60 Transportation of tower structure to 4.6 designated site (optional) 4.7 Tower erection 4.8 Painting Subtotal 6 50 M Self Supported Tower 6.1 Excavation 6.2 Backfilling 6.3 Concrete class A 6.4 Concrete class E 6.5 Reinforced Grade 60 Transportation of tower structure to 6.6 designated site (optional) 6.7 Tower erection 6.8 Painting Subtotal 8 60 M Self Supported Tower 8.1 Excavation 8.2 Backfilling 8.3 Concrete class A 8.4 Concrete class E 8.5 Reinforced Grade 60 Transportation of tower structure to 8.6 designated site (optional) 8.7 Tower erection 8.8 Painting Subtotal M3 M3 M3 M3 kg set set set 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 M3 M3 M3 M3 kg set set set 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 M3 M3 M3 M3 kg set set set 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 M3 M3 M3 M3 kg set set set 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 7 of 7

WLL Civil & Logistics Work B.O.Q.


Item No.
1 1.1 1.1.1 1.1.2 2 2.1 2.1.1 2.2 2.2.1 Logistics Transportation etc. For Local Areas For Waziristan Testing Soil Testing (per site) Testing of soil sample taken from the site Concrete Cube Testing (per site) Testing of concrete sample taken from the site. The test would be conducted three times during the site construction. Subtotal (2) set 0.00 0.00 set 0.00 set set 0.00 0.00

Description

Unit

Quantity

Unit Price (PKR)


ET & HRCP

Total Amount (PKR)


ET & HRCP

Total Amount (per Local Site) Total Amount (per Waziristan Site)

0.00 0.00

You might also like