Day 1 Goregaon Tin Dongri Qrtr. Stayed over there. Day2 21.06.2011 Left Rams Residence at 10.15 AM.

Had break fast at Hotel & left to his Amboli Police chowky Then caught Rickshaw for Domestic Air Port. Sharp 1.15 PM Take off of Jetlite for Kolkata Reached 3.30 PM at DUmDum Stayed to Rly Hotel at Howrah Rly Stn as 8.15 PM train postponed at 5.30 AM on next day Mumbai mail. Day 3. Reached Tatanagar at 9.30 AM . IWSP GHse . Started Audit Physical Audit work at 11.00 AM. Logged AEMC PA to mains where two i/crs are located we could connect PA to one Incomer where one reading will be half of F.L. Day 4. Considered for me only PDS Audit which was very much strange experience. It was decided to look forward for 4 to 5 Trafos profile. However it was observed that there are more than 9 Aux. Trafos. We decided to go for 9 Trafos profile reading. Out of Two PA s we strated using one for Aux. Trafos. It was also necessitated to check the profile of Compressors for Air Audit.and also take the PA readings of water pumps at four pumping stations. We tried level best to go for PA readings of almost places. I personally learned to take the reading of flow meter and

Notes for Energy Audit for future projects. General Info about reaching at EA Site Sheet 1 Sr. No. Description Train Tickets Train Tickets Local conveyance Day to Day conveyance Office timing of Company Shift timing of Works Incharge Name with his subordinate who will coordinate

Care to be taken for Gate Pass & work force. Sheet 2 Sr. Description No. Gate pass with equipment passes shall be made available for 24x7 there shall be some ease ness to obtain In & Out of the persons and also equipments. Work Order Copy Visiting Cards & Cell nos of Authority Company Visiting Cards Company Seal & Letter head List Of Equipments on Letter head

Material/ equipment required for Energy Audit per team Sheet3 Sr. DESCRIPTION No. 1 PA with Handgloves of 11KV 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Flowmeter with gel Lux meter IR Temp Gauge Temp Gauge with extended Transducers Distance Meter Scientific Calculator Torch Camera Pen Drives Time Clock Calculator Log sheets of PA Data Log sheet of Flow meter Data Log sheet of HT Cable data Logsheet of LT Cable Data Logsheet of PCC to MCC Cable Data Audit Diary/ Note book Panel keys Screwdriver Tester

Data to be taken from the Vendors before audit. ENERGY AUDIT PDS PRE AUDIT STAGE Sheet4 Sr. No. 1 Total Connected Load 2 Transformer wise connected load details. 3 4 5 6 7 8 9 10 11 12 Main SLD Trafo wise SLD Name Plate Data of Transformers, Motors, Pumps, Compressors, SLD / Construction data of LT Panels. HT & LT Breaker Data Electricity Bill Data for 24 Months Electricity Tariff Schedule One Copy of Electrcity Bill CT ratio of Main Incomer Company Profile

ENERGY AUDIT AIR SYSTEMPRE AUDIT STAGE Sheet5 Sr. No. 1 List Air using gadgets 2 3 4 5 6 7 8 9 Air use purpose at various points/levels Data of Pneumatic equipments Air flow diagram with pressure requirements at each points/location Pipe sizes throughout factory Location layout of compressors with Air inlet & outlet flow diagram Intercooler location & History Data of Compressors Meter readings of Compressor panel. Size of Receiver Tank & Dimension

ENERGY AUDIT WATER SYSTEMPRE AUDIT STAGE Sheet6 Sr. No. Pumps Specification Water circuit diagrams plant wise, use wise, pump wise, cooling tower wise with sizes of pipes Pipe life installation date Condition of valves Temperature requirement of water at user end Flow Requirement of water at user end Pressure requirement at user end Cooling Tower Specification Firefighting Data of factory with diagrams

Planning of Actual Energy audit Sheet7 Sr. No. 1 2 3 4 5 6 7 8 Awareness Meeting with Company Engineers/ Managers Assess the EA teams Assess the No. of Technician/Support staff with team and also overall. Day wise Schedule of EA Tea Time if possible for EA Evening tea with snacks if possible Electric Shock Proof Shoes Insurance of Team Members

ENERGY AUDIT DRAFT PREPARATION ACTIVITY EA Draft Report Activity at Pre Audit Stage Sheet8 Sr. Description No. 1 Connected load Data 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Energy Bill Data Name Plate Data of Motors Name Plate Data of Transformers Name Plate Data of Pumps Name Plate Data of Compressors Name Plate Data of Cooling Towers Name Plate Data of DG Sets Name Plate Data of Name Plate Data of Name Plate Data of SLD of Main LT Distribution SLD of HT LT Tariff Data List of TEAM Members Energy Audit Team Members Company Profile

Support required from the Owner/Co. at Audit site. 1. At each EA team site one responsible person shall be nominated officially. 2. Helpers and technicians to help EA Engineers while Auditing to carry equipments