101

3.5.2011 MERVENTO

RePower 3.XM
3,3 MW Geared turbine Rotor diameter 104 m Prototype erected late 2008 Nacelle + rotor 160 t

102

3.5.2011 MERVENTO

RePower 3.XM

103

3.5.2011 MERVENTO

RePower 5M
5 MW Rotor diameter 126 m Shaft with two bearings, CARB in front, sperical roller bearing in rear Two helical planetary stage and one spur gear stage gearbox Nacelle 290 t Rotor 120 t Total weight nacelle + rotor 410 t Nacelle width 6 m, height 6 m and length 18 m
104 3.5.2011 MERVENTO

RePower 5M

105

3.5.2011 MERVENTO

RePower 5M

106

3.5.2011 MERVENTO

RePower 5M

107

3.5.2011 MERVENTO

RePower 5M

108

3.5.2011 MERVENTO

RePower 5M

109

3.5.2011 MERVENTO

RePower 5M

110

3.5.2011 MERVENTO

RePower 5M

111

3.5.2011 MERVENTO

RePower 5M

112

3.5.2011 MERVENTO

RePower 5M

113

3.5.2011 MERVENTO

RePower 5M

114

3.5.2011 MERVENTO

Siemens SWT-2.3-101
2,3 geared turbine Prototype erected on October 2004 Rotor diameter 101 m Three stage planetary helical gearbox Full power at wind speed 13-14 m/s / Nacelle + tower 144 t

115

3.5.2011 MERVENTO

Siemens SWT-2.3-101

116

3.5.2011 MERVENTO

Siemens SWT-3.6-107
Prototype erected on October 2004 Rotor diameter 107 m Three stage planetary helical gearbox Full power at wind speed 13-14 m/s Nacelle 135 t N ll Rotor 100 t Total weight nacelle + rotor 235 t Direct drive 3,6 MW nacelle + rotor 265 t Siemens Wind is testing a direct drive d i version of th 3 6 MW i f the 3,6 MW.
117 3.5.2011 MERVENTO

Siemens SWT-3.6-107

118

3.5.2011 MERVENTO

Siemens SWT-3.6-107

119

3.5.2011 MERVENTO

Siemens SWT-3.6-120
Prototype to be erected in end of 2009 Rotor diameter 120 m Three stage planetary helical gearbox Full power at wind speed 12-13 m/s Same rotational speed 13 rpm as S t ti l d for the 107 m rotor.

120

3.5.2011 MERVENTO

Siemens 3 MW Direct Drive


Generator in front of the tower A prototype erected first week of December 2009 Rotor diameter 101 meter Hollow fixed main shaft Permanent magnet generator Liquid cooled generator Outer rotor generator Hydraulic p y pitch

121

3.5.2011 MERVENTO

Siemens 3 MW Direct Drive

122

3.5.2011 MERVENTO

Siemens 3 MW Direct Drive

123

3.5.2011 MERVENTO

Siemens 3 MW Direct Drive

124

3.5.2011 MERVENTO

Siemens 3 MW Direct Drive

125

3.5.2011 MERVENTO

Siemens 3 MW Direct Drive

126

3.5.2011 MERVENTO

Siemens 6MW
Siemens i developing a 6MW direct drive for ff h di t d i f offshore According to lates articles 5MW. According t fi A di to finacing sources i 6MW. Market release probably in 2012

127

3.5.2011 MERVENTO

Sinovel SL3000
Doube fed Developed by AMSC Windtec Developed also SL1500 and lately SL5000

128

3.5.2011 MERVENTO

Sinovel SL3000

129

3.5.2011 MERVENTO

Sinovel SL3000

130

3.5.2011 MERVENTO

Suzlon
Turbine power 10 MW Direct drive, probably down wind Generator diameter 25 m, speed 10 rpm Rotor diameter 145 m Smartmotor AS makes the generator

131

3.5.2011 MERVENTO

Suzlon

132

3.5.2011 MERVENTO

Suzlon

133

3.5.2011 MERVENTO

Suzlon

134

3.5.2011 MERVENTO

Vensys 1,5 MW
Manufactured by GoldWind, Impsa, E I Eozen, CKD CKD, Direct drive permanent magnet Passive cooling of generator 70 m and 77 m rotor diameters Vensys 92 with 2,5 MW exists as well

135

3.5.2011 MERVENTO

Vensys 1,5 MW

136

3.5.2011 MERVENTO

Vensys 1,5 MW

137

3.5.2011 MERVENTO

Vensys 1,5 MW

138

3.5.2011 MERVENTO

Vensys 1,5 MW

139

3.5.2011 MERVENTO

Vensys 1,5 MW

140

3.5.2011 MERVENTO

Vensys 1,5 MW

141

3.5.2011 MERVENTO

Vensys 2,5MW
2,5 MW 90 and 100 m rotor diameters Direct drive Permanent magnet generator Outer rotor design Closed cooling system Single bearing g g

142

3.5.2011 MERVENTO

Vensys 2,5MW

143

3.5.2011 MERVENTO

Vensys 2,5MW

144

3.5.2011 MERVENTO

Vensys 2,5MW

145

3.5.2011 MERVENTO

Vestas V80/V90

1,8MW/2,0MW

1,8 and 2,0 MW Two rotor diameters, V80 and V90 Two planetary stages and one helical stage gear box Two b i T bearings! ! Nacelle 68 t Rotor 38 t Total weight nacelle + rotor 106 t

146

3.5.2011 MERVENTO

Vestas V80/V90

1,8MW/2,0MW

147

3.5.2011 MERVENTO

Vestas V90
3 MW Two planetary stages and one helical stage gear box Single bearing Prototype erected in May 2002 Series production starting from end 2004 Nacelle 70 t Rotor 41 t Total weight nacelle + rotor 118 t According to unconfirmed information sold only as on-shore turbine.
148 3.5.2011 MERVENTO

Vestas V90

149

3.5.2011 MERVENTO

Vestas V90
All transformers exchanged All gear boxes excanged d It is a reality