Generating Stations Evacuation of Power linked Transmission Works Mahatma Gandhi Thermal Power Project (MGTPP), Jhajjar (Case-2) (2x660MW)
400KV substation Dhanonda(New)
3x315MVA, 400/220kV
Covered in 220 kV substation 100 100 58 42 7 65 100 10 90 10 30 70 30 65 35 10 75 20 75 20 2 64 56 12.168 8.468 38 8 8.632 12.332 4 2 64 60 12.168 8.468
Ateli
Mohindergarh
2008-09
12.4.10
11.10.11 11.10.11
6367.79
400 kV D/C line from Jhajjar-2 (TPS)400kV substation Dhanonda -20.8km Loc.-64 Mode: Turnkey 400 kV D/C Daultabad Dhanonda line72.979 km Loc.- 229 Funding : REC-099 Mode : Turnkey
Mohindergarh
2008-09
24.7.09
19.11.10
30.9.11
1669.93
S/H building S/Stn. tower foundation Equipment foundations Cable trenches Misc. civil activity Earthing Erection of tower & beam Erection equipment supporting Structures Erection of IDSG Erection of ODSG Erection of transformer Cabling, testing & comm.. Stub settings (Nos.) Tower erection (in No.) S&S of Conductor (in km) S&S of Earthwire (in km)
1454.75
Work in progress by the firm but not as per schedule for which the firm has been requested to expedite the same.
1868.88
Turnkey contractor : M/s Cobra Instalaciones Y. Servicios, S.A, Madrid (Spain) Contract awarded on :27.2.09 Work in progress. The firm has assured to complete the work by 30.9.2011 in the meeting held on 8.8.2011. Turnkey contractor :M/s Cobra Instalaciones Y. Servicios, S.A, Madrid (Spain) Contract awarded on :7.4.2010 M/s Fedders Llyod has been directed to increase the no of foundations gangs & erection gangs for the early completion especially at Daultabad end. The firm has assured to complete the work by 31.12.2011 in the meeting held on 8.8.2011.
2.
Mahindergarh
2009-10 24.7.09
Stub setting (No.) Tower erection (in No.) S&S of Condt. (in km) S&S of E/Wire (in km)
145
67 -
74
162 72.98 72.98
6
9 -
151 76 -
7866.93
3.
400KV Substation Kabulpur (Rohtak) 2x315 MVA, 400/220 kV + 2x100 MVA, 220/132kV Mode : PPP
Rohtak
2009-10
9.9.10
2.1.12
2.1.12
38200.00
including associated trans. Lines
S/H building S/Stn. tower foundation Equipment foundations Cable trenches Misc. civil activity Earthing Erection of tower & beam Erection equipment supporting Structures Erection of IDSG
15 54 30 10 10 -
10 54 30 10 10 -
27600.00
PPP Project allotted to Concessionaire M/s Jhajjar KT Transco Pvt. Ltd. (Agreement signed on 28.5.2010) Both 100MVA, 220/132 transformers received at site. kV
4.
400kV Substation Deepalpur (Sonepat) 2x315 MVA, 400/220kV + 2x100 MVA, 220/132kV Mode : PPP
Sonepat
2009-10
9.9.10
2.1.12
2.1.12
Erection of ODSG Erection of transformer Cabling, testing & comm.. S/H building S/Stn. tower foundation Equipment foundations Cable trenches Misc. civil activity Earthing Erection of tower & beam Erection equipment supporting Structures Erection of IDSG Erection of ODSG Erection of transformer Cabling, testing & comm..
13 5 35 6 4 10 12 -
10 5 35 6 4 6 12 -
Work in progress. PPP Project allotted to Concessionaire M/s Jhajjar KT Transco Pvt. Ltd. (Agreement signed on 28.5.2010) One 100MVA, 220/132 transformer received at site. Work in progress. kV
5.
400kV D/C Line from MGTPP Jhajjar to 400kV Substation Kabulpur -35km Mode : PPP 400 kV D/C Line from 400 kV Substation Kabulpur (Rohtak) to 400 kV Substation Deepalpur (Sonepat)64 km. Mode : PPP LILO of one circuit of 400 kV Abdullapur Bawana Line at 400 KV Substation Deepalpur (Sonepat)1 km. Mode : PPP
Rohtak/ Sonepat
2009-10
9.9.10
2.1.12
2.1.12
Stub settings (Nos.) Tower erection (in No.) S&S of Conductor (in km) S&S of Earthwire (in km)
27 -
PPP Project allotted to Concessionaire M/s Jhajjar KT Transco Pvt. Ltd. (Agreement signed on 28.5.2010) Work in progress.
Rohtak
2009-10
9.9.10
2.1.12
Sonepat
2009-10
9.9.10
2.1.12
2.1.12