You are on page 1of 21

FORM E

Republic of the Philippines Province of Antique Municipality of Pandan

STATEMENT OF WORK ACCOMPLISHMENT


(Labor Component, for Projects implemented by Administration) as of _______________________ Project: Location: Quantity Accomplished ITEM NO. DESCIPTION QTY. UNIT % Weight Prev. This Period To Date Percent Accomplishment Prev. This Period To Date

TOTAL

I hereby certify that the project accomplishment as of in accordance with the approved plans, specifications and scope of works. Prepared by: Verified:

is

of the project

Approved:

________________________

______________________

_______________________
Punong Barangay

FORM F _______________________________________________ Name of Project/Location:

pictures

FORM A Republic of the Philippines Province of Antique MUNICIPALITY OF PANDAN Name of Project/Location:

Program of Works
(By Administration)
Date Prepared: [ ] New [ ] Revision [ ] As Bidded Mode of Implementation: [ ] By Contract [ ] By Administration Project Schedule: Duration (CD) Start Finish BILL OF QUANTITIES

Project Description:

Source of Fund: Approved Budget for the Contract:

Item No.

Description

Qty.

Unit

Unit Cost (PhP)

Total Cost (PhP)

% Weight

TOTAL

Cost Breakdown A. Direct Cost A.1 Materials Cost A.2 Labor Cost A.3 Tools/Equipments Expenses Total Direct Cost B. Indirect Cost (Administrative Expenditures) B.1 Project Supervision B.2 Professional Expense and documentation Total Indirect Cost TOTAL ESTIMATED PROJECT COST Prepared: Reviewed:

Total (Php)

% Weight

10% of Direct Cost 5% of Direct Cost

O.K. as to Appropriation:

________________________ Date: O.K. as to Availability of Funds: Date: Noted:

ARISTOTLE S. PANDONGAN Municipal Engineer

_________________________ Chairman Committee on Appropriation Date: Approved:

________________________ Barangay Treasurer Date:

________________________ Chairman Committee on Infrastructure Date:

___________________________ Punong Barangay Date:

FORM B _______________________________________________ Name of Project/Location:

DRAWING

FORM C _______________________________________________ Name of Project/Location:

QUANTITY TAKE OFF Put here manual computation of Work Item Quantities based on approved scketch, plans or drawings These will be the basis for the derivation of the Work Quantities

FORM D _______________________________________________ Name of Project/Location:

DETAILED ESTIMATES
ITEM NO.: DESCRIPTION: UNIT: QUANTITY A. DIRECT COST A.1 MATERIALS ITEM DESCRIPTION QUANTITY UNIT UNIT COST AMOUNT

TOTAL A.2 LABOR ITEM

DESCRIPTION

QUANTITY DURATION

UNIT

RATE

AMOUNT

TOTAL A.3 TOOLS/EQUIPMENTS ITEM DESCRIPTION

QUANTITY DURATION

UNIT

RATE

AMOUNT

TOTAL TOTAL DIRECT COST TOTAL ITEM COST UNIT COST

_______________________________________________ Name of Project/Location:

SUMMARY OF MATERIALS

ITEM

DESCRIPTION

QUANTITY

UNIT

UNIT COST

AMOUNT

Rehabilitation/Construction of Patria-Luhod Bayang FMR

Detailed Estimates Page 7 of 21

TOTAL summarize all materials from detailed estimates These form will be the basis for the preparation of P.R.

Rehabilitation/Construction of Patria-Luhod Bayang FMR

Detailed Estimates Page 8 of 21

POSSIBLE ITEM OF WORKS


WORK ITEMS VERTICAL CONSTRUCTION Carpentry Works Structural Excavation Masonry Works w/ Rebars Concreting w/ Rebars Steel Works Architectural Finishes Plastering Works Painting Works Roofing Works Roof and Roof Framing Doors and Windows Electrical Works Plumbing Works UNIT OF MEASURE DESCRIPTION General construction of verticial structures sq.m., lump sum General carpentry works using wooden (l.s.) materials cu.m. sq.m. cu.m. linear meter, sq.m., l.s. sq.m. sq.m. sq.m. sq.m. sq.m. sq.m. l.s. l.s. Installation/repair of electrical fixtures and equipments Installation/repair of pipes, and plumbing fixtures For roads, bridges, and other horizontal structures General concreting works using sand, gravel and cement as materials (may be used for non critical pavements) Excavation for canal, drainage clearing of vegetation (uprooting of trees, grass clearing) spreading of gravel for road and repatching of potholes canal and creek cleaning ripraping and stone masonry for slope protection, line canal Excavation for structures (e.g. Foundation) Concrete Hollow Blocks with reinforcements structural concrete with reinforcements (footing, columns, beams, etc.) steel construction (e.g. Fencing and steel framings using welding) may include finishing works such as plastering, painting, tiles and other architectural finishes plain cement plaster finish (finishing) general painting requirement Installation/repair of Roofing Fabrication of roof truss and installation of roofing

HORIZONTAL CONSTRUCTION Concreting Works Excavation Works Vegetation Control Levelling/Repatching Works Clearing/Dessilting Works Riprap and Grouted Riprap sq.m., cu.m. cu.m. sq.m. sq.m. linear meter, sq.m., cu.m. cu.m., linear meter

200

CHECKLIST OF FORMS A B C D E F G Program of Works (with Bill of Quantities) Plans/Drawings Quantity Take off (Computation of Quantities) Detailed Estimates SWA (Status of Work Accomplished) Pictures (before, during, after) Certificate of Completion and Acceptance

FLOW OF PRESENTATION Pre-Project Implementation Requirements Program of Works Drawings Pictures Estimates Procurement (Materials) PR PO Delivery and Inspection Implementation Stage Labor claim for partial accomplishment Pictures SWA (Status of Work Accomplished) Labor Payroll Completion Final claim for labor SWA (100%) Pictures Certificate of Completion and Acceptance

CASE STUDIES Case 1 Case 2 Case 3 Case 4 Maintenance of Road Construction of Shade House Construction of CHB Canal Concreting of Pathwalk

100 M

ROAD

ROAD

4M

ROAD

80 M

2" DIA GI PIPE ROOF FRAMING 4M X 4 M ROOF CORR GI SHEET

4" DIA GI PIP 3M HT.

ROAD

40 M

75 M

100 M

ROAD

ROAD

80 M

0.3 M

4" DIA GI PIPE 3M HT.

0.40 M

FORM B REHAB OF FARM TO MARKET ROAD Name of Project/Location:

DRAWING

100 M

ROAD

ROAD

4M

ROAD

80 M

PLAN

FORM B CONSTRUCTION OF SHADE HOUSE Name of Project/Location:

DRAWING

2" DIA GI PIPE ROOF FRAMING 4M X 4 M ROOF CORR GI SHEET

4" DIA GI PIPE 3M HT.

FORM B CONSTRUCTION OF CHB DRAINAGE Name of Project/Location:

DRAWING

ROAD

40 M

75 M

100 M

ROAD

ROAD

80 M

PLAN
0.3 M

SECTION

0.40 M

FORM B CONCRETING OF PATH WALK Name of Project/Location:

DRAWING

100 MM THK CONCRETE PAVEMENT

100 M

ROAD

ROAD

4M

ROAD

80 M

PLAN

FORM G

Republic of the Philippines Province of Antique Municipality of Pandan _____________________________ Barangay

CERTIFICATE OF COMPLETION

Name of Project: Project Cost : As Built Cost: Date Started : Date Completed :

This is to certify that the above named project has been satisfactorily completed in accordance with the approved plans & specifications. Issued this _____ day of ___________.

___________________________ ___________________________ Punong Barangay

CERTIFICATE OF ACCEPTANCE
By virtue of this certificate, the undersigned, hereby accepts the completed structure/works as above described and confirms assumption of responsibility with regard to custody, security, care and maintenance of the structure and its facilities.

___________________________ Punong Barangay/End User