Professional Documents
Culture Documents
Date:
The undersigned is working as a Asst. Manager (Power Plant) in M/s Ambuja cement ltd c/o Wartsila India ltd., (Unit- Rawan) C.G in capacity of 78 MW. And I am desires to change the present assignment and thats why I am submitting my resume for suitable post. Hence, kindly consider the same and give me an opportunity to serve in your esteemed organization. I hope you will do the needful. Thanking you,
ATULYA PRAKASH
1
Cell No: 9165012808,9753880668, 8602713895. atulya_prakash@rediffmail.com. atulyaprakash2@gmail.com Objective : To grow in an organization with hard work and dedication by utilizing My knowledge and taking up challenging opportunities to build my career. 1Diploma in
Electrical Engineering,
Education
Government
in
Polytechnic, Muzaffarpur Passed in the Year- 1996 2- Pursuing last year B.Tech in Mechanical Engg. From Rajasthan Vidyapeeth University Udaipur.
: :
14th Feb. 1972 MS Windows 98/XP, MS Dos, MS Office- Word, Excel, E mail & Internet,
Working Experience
Present Assignment : Working as a Asst.Manager (power plant) in M/s Ambuja cement ltd Rawan, Bhatapara- Raipur(C.G) c/o Wartsila India ltd in power plant from Dec2010 to till date (Total capacity-79 MW). Plant Status : Thermax make (70/80 TPH),CVPL Make(70TPH).AFBC Type Water tube, single drum, Coal fired boiler Pre. 661 Kg/cm2 & Temp. 495 5 deg C& IJT make CFBC type 135 TPHX1 , pressure 87 kg/cm&temp.5155 deg C & Bharat Heavy Electricals Ltd make Turbine (15x2&33x1)MW uncontrolled three extraction cum condensing type. In our two system 15/33 MW used GEA Chennai make Air cooled condenser. DG set 02 nos. 10MW/6 MW/6.6 kv ,make MAN/Wartsila Job Profile:1) Smooth and Efficient operation of Power Plant with all auxiliaries. 2) Trouble shooting, Efficiency Control with Energy Conservation. 3) Checking the Daily Boiler and Turbine Check list. 4) Training for new recruits. 5) Study & timely guidance to sub ordinates 6) Responsible to maintain the Quality Assurance Plan of respective jobs. 7) Responsible to complete the job as per approved drawings. 8) Making of work order, material indent ,material inventory, yearly budget Preparation etc.
5th Assignment
Working as a Asst.Manager (power plant) in M/s Balrampur Chini Mill Ltd (Unit- Gularia), Lakhimpur Khiri Distt. (U.P.) since Dec.-(2007 to 2010) Plant Status : Walchandnagar make 02nos. Water tube, Bi drum, multi fuel fired boilers with 90TPH each capacity. Pressure 461 Kg/cm2 & Temp. 430 5 deg C. Shin Nippon make turbine 21.3MW by extraction cum condensing and HTC make 10MW by back pressure, Cooling tower Paharpur make,Triveni make 60M RO cum DM plant.
4th Assignment : Working as a Senior Engineer (Mechanical) in M/s Dalmia Chini Mills ltd., Shahajahanpur from Feb-2007 to Dec-2007. :
Traveling Grate, Balanced draught and Natural Circulation with 140TPH. Pressure 86 Kg/cm2 & Temp. 515, +/- 15 deg C. HTC, China make Steam Turbine (27MW).VA-TECH, HYDRO Make Generator 3rd Assignment : Working as a Operation Engineer (Mechanical) in M/s Prakash Industries Ltd , Champa (C.G.) from Nov.-2005 to Feb. 2007. : Cethar Vessels Pvt. Ltd., make Boiler Single
fired, AFBC type, Induced draught and Natural Circulation with 110TPHx02nos. , & BHEL make Boiler Single drum, Coal fired, AFBC type, Induced draught and Natural Circulation with 65TPHx01No. Pressure 68 Kg/cm2 & Temp. 485 deg C. Turbine (25MWx 2 Alstom+7.5MWx 2 English- Electric Make) 2nd Assignment : Working as a Assistant Engineer (Mechanical) in M/s J.K.Tyers Ltd, Gwalior (M.P.) from July.1998 to Nov.2005. : Thermax and IJT make Boiler Bi-drum, Coal/Oil Stocker fired with Traveling grate, Balanced draught and Natural Circulation with 50TPHx01no. and 20TPHx02nos., Pressure 42 Kg/cm2 & Temp. 450 deg C. Turbine (6.25MW SNM/TDPS Make). 1st Assignment : Working as a Junior Engineer (Mechanical) in M/s SVC Superchem Ltd, Mathura (U.P.) from from Jan-1997 to June-1998. : IJT make Oil fired type, Forced draught and
Plant Status
Pressure 45Kg/cm2 & Temp. 450 deg C. Steam Turbine (13.5MW), Gas Turbine (2.89MW) with Combined Cycle Turbo Compressor train.(MANGHH/Siemens Make generator)
Expected Salary