Your guide to phase two consultation

This booklet provides a quick and easy guide to the documents available as part of our phase two consultation.
The overriding aim of our public consultation on the Thames Tunnel project is to ensure that both community and technical consultees have a chance to understand and influence our proposals. We are currently seeking your views on the project including: the need for the project, including whether a tunnel is the most appropriate solution the alignment of the preferred route our preferred sites the preliminary environmental information we have gathered.

How to use this guide

Inside youll find commonly asked questions that will point you to the relevant documents, which will hopefully provide answers to your questions. We have three types of documents: project information papers, which provide general projectwide information that relates to the Thames Tunnel project site information papers, which provide general information that relate to each individual site along the route of the Thames Tunnel project supporting technical reports.

There are other project information papers and technical reports that may be of interest, as well as links to where you can find information on our phase one consultation material and the Infrastructure Planning Commission. We have also provided a full list of the documents and a brief description to help explain what information they contain.

Your guide to phase two consultation

Relevant project information papers

Why do we need the Thames Tunnel? How much will it cost me? Where will the works be taking place?

Overflow Options Funding Route and tunnel alignment Build Site selection Changes Managing construction Transport Build Settlement

How were the sites chosen?

How could I be affected by the construction works (eg working hours, noise and traffic)? What will the sites look like when they are finished? How will the works effect the environment? Will the ventilation columns smell? How were my comments from your phase one consultation dealt with?

Design

Environment

Odour Consultation Route to consent Timing

How do I tell you what I think?

Feedback form

Site information papers

Relevant technical reports

Needs Report

Book of plans Design development report Site selection methodology paper Site selection background technical paper Phase two scheme development report Code of construction practice Part A: General requirements Book of plans Book of plans Design development report Preliminary environmental information report Draft waste strategy Air management plan Report on phase one consultation Phase two scheme development report Design development report Community consultation strategy and statement of community consultation Interim engagement report

Phase 1 Consultation Report on Phase Provides a summary of the comments made at phase one 1 Consultation: Icon consultation documents Title Details consultation and our responses. List of Icon Title Details SUMMARY Summary Report Phase 1 Consultation Interim engagement Phase 1 Consultation Icon Title Details Report on Phase Provides a summary of the comments madehave undertaken Report on Phase 1 Report on Interim Provides summary of the comments made at phase one 1 Consultation: Provides a a summary of the engagement weatin London, the phase one A booklet our responses. 1 consultation andoutliningphase 1 Engagement Consultation: between phase our and the overflow problem Why does London consultation and one responses. two consultations. SUMMARY Summary Report need options assessed to deal with it and why the Thames the Thames Tunnel? SUMMARY Summary Report Tunnel is the best of these solutions. Phase 2 Scheme development Interim engagement Interim engagement Sets outAllows key stakeholders and other interested parties to the process which we have followed to select Phase on Interim Report2 Scheme Provides a summary of the engagement we have undertaken our preferred sites. Please refer to Appendix A1 available during Feedback form comment on our proposals and the material for more 2 Report on Interim Development Engagement Report Provides a phase oneof the engagement we have undertaken between summary and phase two consultations. Icon Title phase one andDetails information on this site. Engagement between phasetwo consultation. two consultations. phase Phase 2 Scheme development Phase 1 Consultation Phase 2 Design Provides a general overview of the scheme design and how the Phase 2 Scheme development Project information papers Report on Phase Report Sets out design has evolvedwe have followed to select Development scheme the process which to date. These include Phase 2information covering various aspects, which relate to the followed to select general Scheme Thames Tunnel project. Provides a summary of the comments made at phase one Sets out the process Please we have Appendix A1 for more 1 1 Consultation: our preferredour responses. refer to sites. which 2 Phase 2 Scheme consultation and Development Phase 2 Project information 2 Summary ReportReport information on this site. SUMMARY Development Report our preferred sites. Please refer to Appendix A1 for more information on this site. the different types of of sites requiredfor Provides information Provides information on on the different types sites required Interim engagement will How we Design Build for the Thames Tunnel project construction construction Phase 2 Provides a general overview typicalschemetypical activities that the Thames Tunnel and the of the and the design and how the Phase 2 Designproject Provides a general overviewundertaken at each site. and how the construct the Report scheme activitieshas evolvedof the scheme design Development design that will be to date. will be undertaken at each site. Report on Interim Development Report Provides a summary of evolved to date.we have undertaken scheme design has the engagement Engagement between out the consultation two have undertaken to date on the Sets phase one and phase we consultations. compared to that Explains how the scheme has changed Phase 2 Project information Q&A Phase 2 Project information Our consultation project, presented at phasephase two consultation and how to the scope of this one consultation, including changes Phase 2 Scheme development Provides information on the different types of sites required for Changes interested parties can respond to this consultation.changes for the tunnellingon the differentmain tunnel and How we will Provides information strategy for the types of sites required Sets out theto sites. which we have followed to select process How weSchemeproject the Thames Tunnel and the typical construction activities that willthe construct Phase 2 the Thames Tunnel atrefer tosite. our will be undertakenand the typical construction activities that preferred information on what measures for more 2 construct theReport will Includes sites. Please each Appendix A1 our Contractors will How construction Development project will be undertaken at each site. information on this site. of our sites once construction commences. be managed put out the consultation we have undertaken to date on the Setsin place at each to Sets out the consultation we have undertaken to datedatethe Q&A Our 2 Design project, Sets scope of this phasewe have undertakenandon on the out the consultation two design and how how Phaseconsultation Provides a the scope ofthe on theof this phase two consultation and general overviewscope scheme consultation the we of the different transport and how How materials Contains information phase Consultation project, this Q&A Our consultationand project, theparties can respondtwo consultation options interested to this consultation. Development travel to scheme design has evolvedparties can respond to this consultation. Report how interestedrespond to this consultation. people will have considered for to date. interested parties candelivering and removing materials from and construction our sites. Howfrom our Phase 2 Project information siteswill Includes information on what measures our Contractors will Howmanaged Includes information on our sites once construction commences. what measures our Contractors will be construction willProvides outContains the the different typesfollow in undertaking put in place at eachdesign principles which have influenced the Sets information on of Project will of sites required for the process the be managed put in place at each of our sites once construction commences. How we will Environment our Environmentalappearance construction activitiesthe Design Thames permanent the typical of our sites once construction we Tunnel and Impact Assessment including that How materials and the Contains information on the different transport options work construct the project environmental topics we different transport options be undertaken at How materials andto will have considered each site.are assessing. Contains is complete. delivering and removing materials we information on the people will travel for from people will travel to Sets outsites. have considered for deliveringundertaken to date on the from the consultation we have and removing materials and from our sites our sets out How we will control our sites. Sets out the process the consultation and tohow This Q&A Our from our sites project, the scope our air phase two project is followinghow it will of this management strategy and and consultation Environment odour work. the potential environmental follow in Sets outassesscan respond to this will effects of undertaking interested partiesprocess the Projectconsultation. the Thames Sets out the process Impact Assessment including the Tunnel project. Environment our Environmental the Project will follow in undertaking Contains the design principles which Contractorsthe Environment our Environmental Impactmeasures our have influenced the How construction will Includes information on what are assessing. environmental topics we Assessment including will Our design environmental topics feel of ourconstructionconstruction work is be managed put permanent look andwe are assessing. in place at each of our sites once sites once commences. Sets complete. out how much the project will cost and how it will Funding How we will control Containssets out our on the different transport options how it will This information air management strategy and we be funded. How we will control How materials and This sets out our air management strategy and how it will odour work. people will travel to have considered for delivering and removing materials from Phase 2 Construction information odour work. and from our sites our sites. Contains the design principles which have influenced the our Code of Construction Contains Includes theout controlwhich in undertaking theduring Document lookinformationwill what measuresbe contractors will the design Project on measures influenced Sets process and Managing Our design construction out theput setting at feelsites during construction.adopted work is permanent in place principles follow havetoconstruction of our sites once Practice (CoCP) the project Environment our complete. lookImpactourof our sites once construction work is Environmental and feel Assessment Our design permanent construction period. including the environmental topics we are assessing. complete. Phase 2 Construction information Environment Phase 2 Construction information sets out our air management strategy and how it will How we will control This Odour Sets out our Air management plan and how it will work. odour of Construction Document setting out control measures assessments. Please work. Preliminary Report containing initial environmental to be adopted during Code Code of Construction Document setting out control measures to be adopted during Environmental refer to Volume [Arup to insert reference] for Practice (CoCP) the project construction which have influencedmore information Contains the design principles period. the Practice (CoCP) Information Report the project construction period. on this site.
1

Phase 2 Environment information Phase 2 Construction information Preliminary Report containing initial environmental assessments. Please Preliminary Reportto Volume [Arup to insert reference] for more information Environmental refer containing initial environmental assessments. Please Code of Construction EnvironmentalReport DocumentVolumeout control measures to be adopted during referthis setting [Arup to insert reference] for more information Information on to site.

Our design permanent look and feel of our sites once construction work is Options information complete. Outlines the various ways to deal with sewage overflows. Phase 2 Environment

Interim engagement Report on Interim Engagement

Overflows

Provides a summary of the engagement we have un between phase one and phase two consultations. Sets out how Londons sewerage system works and why
the capital has an overflow problem.

Phase 2 Scheme development


2
Regulatory Scheme Phase 2 framework

Information on the various regulatory bodies that Sets out the process which we have followed to sele our govern Thames Water. preferred sites. Please refer to Appendix A1 for m Development Report information on this site. Sets out the preferred route of the main tunnel and the reasons general overview of the scheme design Provides afor our preference. Sets out the process for how we will get permissions to build the Thames Tunnel.

Route and tunnel alignment Route and tunnel alignment

Route to consent Phase 2 Project information


Timing

Phase 2 Design Development Report scheme design has evolved to date. Route consents

Provides information on the different types of sites How we will the Provides information on ground movementconstruction act Thames Tunnel and the typical and what Settlement the project construct Excavated materials will we will do to limit settlement. site. be undertaken at each Route and tunnel alignment Q&A Our consultation Site consents Route selection
Timing construction How Timing

Sets out the consultation we have undertaken to da Sets the scope we followed to find and select our project,out the processof this phase two consultation an preferred sites. interested parties can respond to this consultation.

be managed

will Includes information on what getting permissionsContra Sets out the expected timescales for measures our put andplace at each ofTunnel.sites once construction c in building the Thames our

Excavated materials

How materials and Transport will travel to people and tunnel is needed Why the from our sites

Contains information the different transport transport opt Contains information on on the different options we have considered for delivering and removing materials have considered for delivering and removing mater our from our sites. sites.

Sets out the process the Project will follow in undert Site information papers These papers provide general information that relate Environmental Impact Assessment including th Environment our to each of our preferred sites. Tunnelling environmental topics we are assessing.
Technical reports

Air management plan

How we will control odour Our design

This sets out our air management strategy and how work. Outlines the methods which we will use to manage
odour from the main tunnel at all our preferred sites.

Phase 2 Construction information


Book of plans Plans and elevations illustrating the location and

WHY?

Needs Report

Contains the design principles which have influence permanent look and feel of our sites once construct Detailed complete. assessment of why we need the Thames Tunnel project.

construction and operational layouts for each site. Code of Construction Document setting out control measures to be adop Practice (CoCP) the project construction period. Sets out control measures to be adopted during the project construction period.

Part A: General requirements Phase 2 Environment information

Code of construction practice

Preliminary Environmental Information Report

Report containing initial environmental assessment refer to Volume [Arup to insert reference] for more i on this site.

Icon Q&A

Title Consultation strategy and statement of community consultation Design development report

Details Sets out our approach and timetable for consulting key stakeholders and those with an interest in the project. Provides a general overview of how the scheme design at each site has evolved to date. Provides information on how building materials and resulting waste, including excavated waste will be managed during construction of the Thames Tunnel. Provides a summary of the public engagement we have undertaken between phase one and phase two consultations. Provides an overview of the development of the Thames Tunnel project and how each site was chosen. Contains initial assessments on the environmental effects of the Thames Tunnel project based on information collected to date. Provides a summary of the comments made at phase one consultation and our responses. Details the methodology used to select construction sites along the route of the Thames Tunnel. Provides supporting technical information to the site selection methodology such as the engineering requirements for size of the construction sites.

Draft waste strategy

Interim engagement report

Phase two scheme development report Preliminary environmental information report Report on phase one consultation

Site selection methodology

Site selection background technical paper

Other useful information


110-ED-PNC-00000-000047

For information about the Infrastructure Planning Commission visit: www.infrastructure.independent.gov.uk For our phase one and phase two consultation material, and more background technical information, visit our website: www.thamestunnelconsultation.co.uk

You might also like