You are on page 1of 10

RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER &

WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity

S. No.

Activity

Hazard

Risk

Control Measures
Use a safe means of access and egress Ensure that any ladders are tied and footed Ensure the correct usage of step ladders Ensure that operatives are aware of the hazards of working at height through TBT Ensure that mobile platforms are not to be moved unless clear of operatives Ensure that scaffoldings and platforms are provided with toe board. Ensure that the working platform and surroundings are adequately barricaded and that access and egress to the building are provided with suitable overhead sheeting. Ensure that mobile platforms are not to be moved unless cleared of equipment, tools and materials.

Residual
High High

Monitoring Mechanism

01

Work at Heights

People falling from height

Serious injury, death

General foreman / Safety Officer

Falling equipment, tools, materials and rubbish

Serious Injury or death

General foreman / Safety Officer

Prepared By(HSE Dept) : Reviewed By(Project Manager):

RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity

S. No.

Activity

Hazard

Risk

Control Measures
Scaffolds must only be erected, dismantled or altered by competent persons. Scaffolds must not be overloaded. Adequate controls and supervision must be established. Appropriate PPE must be worn. All equipment, tools and materials to be correctly hoisted and lowered. ( No throwing ) No go area to be designated at the base by barricading during erection or dismantling. Materials on scaffolds must not be stacked higher than the toe board unless brick guards or similar materials are in place. The minimum width of a working platform is 600mm and must be kept clear for access along the scaffold. All scaffolds and working platforms must be fully boarded, guarded irrespective of height and inspected by a competent person prior to use and on daily basis. Safety harnesses must be worn where necessary. Guardrails and toe-boards are required to all working platforms irrespective of height and must not be removed by unqualified personnel.

02

All Scaffolding

Collapse through overloading

Injury to head and upper body, serious Injury, death

People falling from height

Serious Injury or Death

Prepared By(HSE Dept) : Reviewed By(Project Manager):

Residual

Monitoring Mechanism

RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity

S. No.

Activity

Hazard

Risk

Control Measures
Ensure the concrete pump is properly maintained and sufficient number of operatives to handle the hose. Ensure use of appropriate PPE. Seek immediate first aid in case of accidental contact with cement. Ensure a competent supervisor is present at all times. Ensure proper scaffolding or platform is being used. Ensure that operatives are aware of the hazards of working at height through TBT Inspect the shuttering to ensure strength and safety prior to pouring. The inspection shall be done by the Engineer. Ensure that competent supervision at all times

02

Concreting

Concrete pump hose whipping and contact with cement

Residual
High High High

Monitoring Mechanism

Injury, Blindness, Chemical burns and Dermatitis

General Foreman / Safety Officer

Fall from height

Injuries/ Death

General Foreman/ Safety Officer

Collapse of shuttering

Injury/ Death through spillage of concrete and falling materials to workers

General Foreman /Project Engineer

Prepared By(HSE Dept) : Reviewed By(Project Manager):

RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity

S. No.

Activity

Hazard

Risk

Control Measures
Ensure use of appropriate PPE. Seek immediate first aid in case of accidental contact with cement and chemical Ensure a competent supervisor is present at all times. Ensure proper scaffolding or platform is being used. Ensure that suitable access and egress onto scaffolding and platform is provided. Ensure that proper use of PPE (full body harness) is followed. Ensure that operatives are aware of the hazards of working at height through TBT Ensure the presence of competent supervisor at all times.

Residual
High High

Monitoring Mechanism

02

Plastering

Contact with Cement and Chemical

Blindness, Chemical burns and Dermatitis

General Foreman / Safety Officer

Fall from height

Injuries/ Death

General Foreman / Safety Officer

Prepared By(HSE Dept) : Reviewed By(Project Manager):

RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity

S. No.

Activity

Hazard

Risk

Control Measures
Ensure use of appropriate PPE. Seek immediate first aid in case of accidental contact with cement and chemical Ensure proper scaffolding or platform is being used. Ensure that suitable access and egress onto scaffolding and platform is provided. Ensure that proper use of PPE ( full body harness ) is followed. Ensure that operatives are aware of the hazards of working at height through TBT Ensure the presence of competent supervisor at all times. Ensure to use appropriate PPE ( Mask and eye protection ). Ensure to use the correct and in good repair power tools. Ensure that guards are in place. Ensure that power cords are not damage and plugs are in place

02

Marble/Tiling Work

Contact with cement based adhesive and Chemical

Residual
High High High

Monitoring Mechanism
General Foreman / Safety Officer

Blindness, Chemical burns and Dermatitis

Fall from height

Serious injury or death

General Foreman / Safety Officer

Cutting of Marble / Tile with power tools

Respiratory Infection, Injury and Electrocution

General Foreman / Safety Officer

Prepared By(HSE Dept) : Reviewed By(Project Manager):

RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity

S. No.

Activity

Hazard

Risk

Control Measures
Ensure that third party inspection certificate is valid. Ensure that daily check by operator is carried out. Ensure that weekly / monthly inspection and servicing is carried out Ensure to monitor the wind speed and not to use crane if wind speed exceed the maximum limit. Ensure that tag lines are use during lifting of bulky materials or equipment Ensure that only trained slingers and signalers are allowed to work with lifting operation Ensure that operators are having license, trained and certified by accredited third party safety consultant Only trained slingers and signalers are allowed to work on lifting operations. Ensure that sling capacity is not exceeded and not damaged

02

Lifting / Crane Operation

Crane collapse through disrepair / poor maintenance

Residual
High High High High

Monitoring Mechanism

Serious bodily injuries and death

Lifting Supervisor/ Safety Officer

Operating and using crane during high wind condition

Serious bodily injury, Damage to equipment and property

Lifting Supervisor/ Safety Officer

Incorrect use of crane or poor operating standards Falling of loads being lifted

Serious bodily injuries, crushing ,death and damage to equipment and property Severe injury, death and damage to property

Lifting Supervisor/ Safety Officer Lifting Supervisor/ Safety Officer

Prepared By(HSE Dept) : Reviewed By(Project Manager):

RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity

S. No.

Activity

Hazard

Risk

Control Measures
Ensure proper scaffolding or platform is being used. Ensure that suitable access and egress onto scaffolding and platform is provided. Ensure that proper use of PPE ( full body harness ) is followed. Ensure that operatives are aware of the hazards of working at height through TBT Ensure the presence of competent supervisor at all times. Ensure to use the correct and in good repair power tools. Ensure that guards are in place. Ensure that power cords are not damage and plugs are in place

Residual
High High

Monitoring Mechanism

02

False Ceiling

Fall of persons

Serious Injury or death

General Foreman / Safety Officer

Use of power tools

Injury and electrocution

General Foreman / Safety Officer

Prepared By(HSE Dept) : Reviewed By(Project Manager):

RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity

S. No.

Activity

Hazard

Risk

Control Measures

02

Prepared By(HSE Dept) : Reviewed By(Project Manager):

Residual

Monitoring Mechanism

RISK ASSESSMENT (HEALTH & SAFETY) PROJECT: SIR BANI YAS ISLAND PRIORITY PROJECTS ( CONFERENCE CENTER & WATER SPORTS CENTER) SEVERITY: 1 Slightly harmful, 2 Harmful, 3 Extremely Harmful. LIKELIHOOD: 1 Unlikely, 2 Likely, 3 Very Likely. RISK LEVEL: 1 Trivial, 1 to 2 Low, 2 to 4 Medium, 4 to 6 High, Above 6 Extremely High. Likelihood Risk Level Severity

S. No.

Activity

Hazard

Risk

Control Measures

02

Prepared By(HSE Dept) :

Residual

Monitoring Mechanism

Reviewed By(Project Manager):

You might also like