MOTORWAY( M4)
Construction of Interchange at Herbanspura Canal Crossing
ESTIMATION OF EQUIVALENT STANDARD AXLES
DESIGN PARAMETERS
DIRECTION FACTOR 1
LANE FACTOR 0.8
BASE YEAR 2007
DESIGN LIFE 10 YEARS
LOADING FACTORS
i) BUSES 100% LOADED
* The Equivalent Standard Axle Factors are adopted from NTRC Study 1995
* The Equivalent Standard Axle Factors are adopted from NTRC Study 1995
* The Equivalent Standard Axle Factors are adopted from NTRC Study 1995
DESIGN PARAMETERS
DIRECTION FACTOR 1
LANE FACTOR 0.8
BASE YEAR 2007
DESIGN LIFE 10 YEARS
LOADING FACTORS
i) BUSES 100% LOADED
* The Equivalent Standard Axle Factors are adopted from NTRC Study 1995
* The Equivalent Standard Axle Factors are adopted from NTRC Study 1995
* The Equivalent Standard Axle Factors are adopted from NTRC Study 1995
A- PROJECT DATA
B- DESIGN DATA
0.1575
PAVEMENT DESIGN
(AASHTO GUIDE FOR THE DESIGN OF PAVEMENT STRUCTURE 93)
A- PROJECT DATA
B- DESIGN DATA
0.1575
ANNEXURE-B
SHEET 3 OF 3
PAVEMENT DESIGN
(AASHTO GUIDE FOR THE DESIGN OF PAVEMENT STRUCTURE 93)
A- PROJECT DATA
B- DESIGN DATA
D- THICKNESS OF ASPHALT D1
1.50 4.82
3.23
2.50
5.52
Design
5.52
ANNEXURE - B
Sheet 1 of 3
CONSTRUCTION OF UNDERPASS AT SHAUKAT ALI ROAD-CANAL CROSSING
TRACTOR TROLLIES 22 26 31 26
3-AXLE TRUCKS 1 1 1 1
4-AXLE TRUCKS 17 21 25 21
Vehicles Period
2003~2008 2008~2013 2003~2013
Buses 4.23 3.72 3.36
Tractor Trollies 3.43 3.28 3.12
& Trucks
1951
Motor Cycle/ Scooter 41.13 802 1.610
Rickshaw
BUSES
TRACTOR TROLLIES
1951
Vehicles Period
2003~2008 2008~2013
Buses 4.23 3.72
Tractor Trollies 3.43 3.28
& Trucks
1291
1179
54
202
34
412 137
59
160
31 10
76 327 152
9 1 5
6 25 12
4 25 11
3078
Period
2003~2013
3.36
3.12