Professional Documents
Culture Documents
Awaiting Legal Agreement New school academy (6 form entry secondary school, 2 form entry primary school & nursery) comprising 2-, 3- and 4-storey main school building, 2-storey sports/drama hall with changing facilities, 3 hard play areas, all-weather, flood-lit sports pitch, smaller flood-lit sports pitch, outdoor play areas, soft play/natural habitat landscaped area, 45 staff-parking spaces, 3 disabled-parking spaces, 102 cycle-parking spaces and associated landscaping with access from Forty Avenue and Bridge Road, HA9 Planning 03/10/2008 Application Decided Number: Type: Date: 08/2712 Variation of Conditions 03/11/2008
Granted Variation of condition 8 (Travel Plan) of Full Planning Permission 08/0799 dated 4th August 2008 to extend time allowed to carry out assessment and consultation of Travel Plan Building Regulation 05/09/2008 Application Decided Number: Type: Date: SN/08/06654 11/09/2008
Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary:
APPROVE Plans unconditionally-all types Name and address for new temporary school Building Regulation 22/08/2008 Building Work Started - Not completed Number: Type: Date: RG/08/06291
Page: 1
Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description:
Construction of Phase 1 temporary teaching accomodation for the new Ark Academy. Building Regulation 21/08/2008 Application Technically DELETED Number: Type: Date: BA/08/06276 26/08/2008
Application Technically Deleted Temporary accomodation at Wembley Park Academy Building Regulation 14/08/2008 Application Technically DELETED Number: Type: Date: BA/08/06042 19/08/2008
Application Technically Deleted Temporary accommodation Planning 13/08/2008 Application Decided Number: Type: Date: 08/2209 Conditions pursuant to a full permission 29/09/2008
Granted Details pursuant to condition 10 (community use scheme), condition 11 (siting of school builings), and condition 13 (management and maintenance scheme for football pitches) of full planning permission reference 08/0799 dated 4 June 2008 for the erection of single storey temporary building comprising a new primary and secondary school, with provision of new hardstanding and car parking and associated landscaping on site adjacent to Forty Avenue as accompanied by : General Specification and Technical Specification for Soccer Pitch Maintenance report; Wembley Park Sports Ground Community Use Scheme September 2008 - August 2010. Planning 24/07/2008 Application Decided Number: Type: Date: 08/2122 Conditions pursuant to a full permission 28/07/2008
Granted Details pursuant to conditions 4 (hard landscape works); 5 (soft landscape works); 7 (street furniture and traffic management); 9 (parking and turning circle); 14 (drainage strategy); 15 (means of
Page: 2 Date Printed: 18/12/2008
enclosure); 17 (bird survey) and 18 (sustainability strategy) of full planning permission reference 08/0799, dated 4 June 2008, for the erection of a single-storey temporary building comprising a new primary and secondary school, with provision of new hardstanding and car-parking and associated landscaping on site adjacent to Forty Avenue; and accompanied by the following reports:- Flood Risk Assessment & Surface Water Drainage Strategy; Sustainable Development Checklist; Consultation on Key Aspects of the Proposed Wembley Park Academy; Phase 1 Habitat Survey and Protected Species Assessment; Bat and Japanese Knotweed Survey Report; Desk Study and Preliminary Ground Investigation; Design and Access Statement; Feasibility Study; Transport Statement; Site Noise Survey and Acoustic Feasibility Study; Archaeological Desk-based Assessment; Planting Scheme and Arboricultural Report; together with details of hard landscaping materials; an e-mail from Mark Langston re. payment for street furniture and traffic-management scheme; and an e-mail from Mark Langston re. fencing, tree-planting and protection; details of fencing materials and sports fencing, bird survey and Breeding Bird Watching Brief Report, sustainability strategy and sustainablity measures list and letters from the Environment Agency dated 28/05/2008 and from the applicants dated 11/07/2008 and 24/07/2008 Application: Validated: Status: Final Completion Date Summary: Description: Planning 11/07/2008 Application Decided Number: Type: Date: 08/2053 Conditions pursuant to a full permission 24/07/2008
Granted Details pursuant to Condition 3 (external materials), Condition 6 (tree protection), Condition 21 (existing trees), Condition 22 (access road construction methodology), Condition 23 (wheel washing facilities) of full planning permission 08/0799 dated 4th June 2008 for Erection of single-storey temporary building comprising a new primary and secondary school, with provision of new hardstanding and car-parking and associated landscaping on site adjacent to Forty Avenue (as accompanied by reports: Flood Risk Assessment & Surface Water Drainage Strategy; Sustainable Development Checklist; Consultation on Key Aspects of the Proposed Wembley Park Academy; Phase 1 Habitat Survey and Protected Species Assessment; Desk Study and Preliminary Ground Investigation; Design and Access Statement; Feasibility Study; Transport Statement; Site Noise Survey and Acoustic Feasibility Study; Archaeological Desk-based Assessment; Arboricultural Report), as accompanied by External Material Finishes Sample. Planning 18/03/2008
Page: 3
Application: Validated:
Number: Type:
Application Decided
Date:
04/06/2008
Granted The erection of single storey temporary building comprising a new primary and secondary school, with provision of new hardstanding and car parking an associated landscaping on site adjacent to Forty Avenue as accompanied by reports: flood risk Assessment and surface Water Drainage Strategy; Sustainable Development Checklist; consultation on Key Aspects of the Proposed Wembley Park Academy; Phase 1 Habitat Survey and Protected species Assessment Desk study amd Preliminary Ground investigation Design and Access Statement; Feasibility Study transport Statement; Site Notice Survey and Acoustic Feasibility Study: Archaeological Desk-based Assessment; Arboricultural Report) Planning 16/04/1996 Application Decided Number: Type: Date: 96/0579 Full Planning Permission 09/05/1996
Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date
Granted Erection of temporary consent for marquee for European Football Championships Planning 02/03/1994 Application Decided Number: Type: Date: 94/0286 Advertisement consent 26/04/1994
Refused DISPLAY AND INSTALLATION OF DOUBLE-SIDED ILLUMNINATED ADVERTISMENT HOARDING. Planning 18/05/1988 Application Decided Number: Type: Date: 88/1176 Full Planning Permission 07/09/1988
Granted EREC OF S/S BLDG FOR USE FOR STORAGE OF GARDEN TOOLS & MACHINERY Planning 24/06/1970 Application Decided Number: Type: Date: C2496 9220 Full Planning Permission
Page: 4
Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final
Application Withdrawn ERECT OF S/S TEMP BANKING PREMISES. Planning 10/02/1970 Application Decided Number: Type: Date: P2734B 8515 Advertisement consent 19/03/1970
Granted CONTINUED DISPLAY OF BANNERS & BOARDS. Planning 13/03/1967 Application Decided Number: Type: Date: P2734A 3373 Advertisement consent 03/04/1967
Granted CONTINUED DISPLAY OF BANNERS & BOARDS Planning 24/05/1966 Application Decided Number: Type: Date: P2734 2189 Advertisement consent 14/06/1966
Granted CONTINUED CONSENT FOR DISPLAY OF BILLS & BANNERS Planning 26/03/1963 Application Decided Number: Type: Date: 23104C AD1619 Advertisement consent 22/05/1963
Granted RETENTION OF BANNERS Planning 14/04/1960 Application Decided Number: Type: Date: 91624 B359 Full Planning Permission 10/06/1960
Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status:
Granted RETENTION OF BANNERS Planning 11/12/1958 Application Decided Number: Type: Date: 23104A AD932 Advertisement consent 21/01/1959
Granted RETENTION OF POSTERS Planning 10/08/1957 Application Decided Number: Type: Date: 23104 AD740 Advertisement consent 20/09/1957
Granted POSTERS. Building Regulation 29/09/1952 Refer to File Number: Type: Date: 1346 4115
Refer To File SPORTS PAVILION (DEMOLISHED) Building Regulation 29/09/1952 Refer to File Number: Type: Date: 21950 3693
Refer To File DIRECTIONAL SIGN (CENTURY HOTEL) Building Regulation 29/09/1952 Refer to File Number: Type: Date: 23104 3743
2318
Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated:
Refer To File MEMORIAL HALL. Building Regulation 29/09/1952 Refer to File Number: Type: Date: 2318 5160
Refer To File DRAINAGE Building Regulation 29/09/1952 Refer to File Number: Type: Date: 2318A 3835
Refer To File WC. Building Regulation 29/09/1952 Refer to File Number: Type: Date: 2648 677
Refer To File BILLIARD ROOM (DEMOLISHED) Building Regulation 29/09/1952 Refer to File Number: Type: Date: 4522 8130
Refer To File MEMORIAL HALL (DEMOLISHED) Building Regulation 29/09/1952 Refer to File Number: Type: Date: 4522A 8130
Number: Type:
4522C 1955
Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description:
Refer to File
Date:
Refer To File ADDS. TO PAVILION Building Regulation 29/09/1952 Refer to File Number: Type: Date: DS5682 F
ENTRANCE GATES & BRICK PIER - DAMAGED Planning 29/09/1952 Application Decided Number: Type: Date: 21950 AD491 Advertisement consent 14/10/1955
Refused DIRECTIONAL SIGN (CENTURY HOTEL) Planning 29/09/1952 Application Decided Number: Type: Date: TP3964 Historic - Tree P O - works related
Address: LandParcelRef:
Granted
Page: 8 Date Printed: 18/12/2008
Description: Application: Validated: Status: Final Completion Date Summary: Description: Application: Validated: Status: Final Completion Date Summary: Description:
Related site
DETAILS IN COMPLIANCE WITH CONDIT. 2 OF P/P. P6481/5523 Planning 04/08/1969 Application Decided Number: Type: Date: P6481A 7608 Full Planning Permission 26/09/1969
Granted DETAILS PURSUANT TO CONDIT. 1 OF P/P. P6481/5523 Planning 20/05/1968 Application Decided Number: Type: Date: P6481 5523 Full Planning Permission 15/10/1968
Address: LandParcelRef:
Page: 9