You are on page 1of 4

Consultancy Services for Preparation of Feasibility - cum Preliminary Design for Construction of Ring Road/ Bypass around Jodhpur

City in the State of Rajasthan under NHDP Phase VII

Quality Assurance Plan Pavement Subgrade Investigation

Name of the Project: PAVEMENT COMPOSITION

Sl. No.

Trial Pit Location Identication No. Location

Composition Type of Material Thickness

Embankment Condition

Remarks

Name & Signature of Enumerators: ____________________

Name & Signature of Supervisors: __________________

\\vboxsrv\conversion_tmp\scratch15109\71158681.xls.ms_office

Consultancy Services for Preparation of Feasibility - cum Preliminary Design for Construction of Ring Road/ Bypass around Jodhpur City in the State of Rajasthan under NHDP Phase VII

Quality Assurance Plan Pavement Subgrade Investigation

Format No. RH/FF/12 Name of the Project: PAVEMENT CONDITION SURVEY SHEET NO.: Road Name Section (from) (Km) District (from) : : : To To : : Road No. Date of Survey Weather : : :

CHAINAGE From To

PAVEMENT COMPOSITION Composition Type*

SHOULDER

RIDING QUALITY

PAVEMENT CONDITION

Thickness Compo- Condition Speed Quality Cracking Ravelling Potholing Rut Patching (mm) sition (Fair/ (Km/hr) (G/F/P/VP) (%) (%) (No. and (None/ (No. and Poor/ %/100m)** Moderate/ %/100m)** Falled) Severe)

Pavement Embankment Roadside Edge drop Condition Drain (mm) (Good/Fair/ (NE/PF/ Poor) F)***

Remarks

Note:

* ** ***

: : :

BUSG = Built-up Spray Grount; AC = Asphaltic Concrete; SDC = Semi Dense Concrete; PC = Premix Carpet; MSS =Mix Seal Surfacing WBM = Water Bound Macadam; DBM = Dense Bituminous Macadam; BM = Bituminous Macadam; BS = Brick Soling; SS = Stone Soling No, and %/100m = Total No. of Potholing/Patching and %age area of Potholing/Patching 100m of length of road NE = Non-Existing; PF = Partially Functional; F = Functional Surveyed by:

Name of the Enumerator : Signature with date:

\\vboxsrv\conversion_tmp\scratch15109\71158681.xls.ms_office

Consultancy Services for Preparation of Feasibility - cum Preliminary Design for Construction of Ring Road/ Bypass around Jodhpur City in the State of Rajasthan under NHDP Phase VII

Quality Assurance Plan Pavement Subgrade Investigation

Format No. RH/FF/13 Name of the Project: ROUGHNESS MEASUREMENTS USING BUMP INTEGRATOR SHEET NO.: Road Name Section (from) (Km) District (from) : : : To To : : Road No. Date of Survey Weather : : :

Chainage Km Bump Reading B R

Direction 1 Wheel Revolution Road Condition W (Type of Surface R Thickness, Drainage, etc.)

Direction 2 UI cm/km Bump Reading Wheel Revolution Road Condition (A) B W (Type of Surface R R Thickness, Drainage, etc.) UI cm/km (B)

Mean Value (A+B) 2 (mm/km)

Name of the Enumerator : Signature with date :

Name of the Supervisor : Signature with date :

\\vboxsrv\conversion_tmp\scratch15109\71158681.xls.ms_office

Consultancy Services for Preparation of Feasibility - cum Preliminary Design for Construction of Ring Road/ Bypass around Jodhpur City in the State of Rajasthan under NHDP Phase VII

Quality Assurance Plan Pavement Subgrade Investigation

Name of the Project: PAVEMENT DEFLECTION DATA USING BENKELMAN BEAM (As per IRC:81-1997)

Format No. RH/FF/14

SHEET NO.: Road Name Section No. of Traffic Lanes : : : Date & Time of Observation Climate Conditions (Hot/Humid/Cold) Air Temperature, oC Annual Rainfall, mm Whether Temperature Correction is in the applied Whether Correction for Seasonal Variation is to be applied Sl. No. Location of Test Points and Identification of Lane Pavement Temperature oC Type of Soil and Pt. Moisture Content (%) Initial Dial Gauge Reading Intermediate Final : : : : : Yes / No : Yes / No Rebound Deflection

Name of the Enumerator : Signature with date :

Name of the Supervisor : Signature with date :

\\vboxsrv\conversion_tmp\scratch15109\71158681.xls.ms_office

You might also like