You are on page 1of 2

SCHEDULE OF RATES

NO 1

DESCRIPTION Minor/ Major Engineering and Project Management (if any) Design of mechanical piping and operating philosophy of upgraded metering skid. Liaison with the sub vendor/sub-contractors/DCS vendor with regard to accomplish the overall job.

UNIT

UNIT RATE (RM)

TOTAL (RM)

Lump Sum

2 Equipment Lump 3 x ultrasonic meter Sum 7 x Flow Computers Modification of existing flow computer cabinet 1 x HMI rack (to fit both HMI servers and web server) Transportation of all equipments from vendor facilities to worksite 3 Fabrication, Construction & Installation All construction jobs involved but not limited to Lump spools, flange and piping modification required Sum adapting the new operating philosophy as per metering skid design. Removal of all existing relevant equipments and installation of all supplied equipments, including but not limited to flow computer cabinet, human machine interface rack, cable routing, and piping installation. 4 FAT & Calibration Factory acceptance testing in presence of PETRONAS Carigali-PMO, PETRONAS Management Unit (PMU) and relevant partners including but not limited to testing, simulation and verification of all supplied equipments as per international standards. Inclusive of integrated FAT comprising all subsystem i.e. DCS, SMARTCEN, FC and GC to be performed separately prior to actual installation at Duyong.

Lump Sum

SCHEDULE OF RATES

NO

DESCRIPTION

UNIT

UNIT RATE (RM)

TOTAL (RM)

5 SAT & Commissioning Configuration of all supplied equipments, Lump including but not limited to establishing common Sum communication channel among gas ultrasonic meters, flow computers, human machine interface and programmable logic controller (if any). On-site integration testing in presence of PETRONAS Carigali-PMO, PETRONAS Management Unit (PMU) and relevant partners including but not limited to testing, dry simulation, verification and punch list clearance of all supplied equipments as per international standards. 6 Documentation & Training All documentation, as listed but not limited to the below, must be made available in ONE (1) SET (defined as three (3) hardcopies and three (3) softcopies (both editable and non-editable): Functional Design Specification Overall Accuracy and Uncertainty Bi-weekly progress reports FAT reports SAT reports Punch List reports and checklist As built drawing Updated validation manual (original copy can be requested from PCSB) as per modified system Transportation of all drafts and final reports from Vendor facilities to PMO KOP Office. Training sessions as follows must be provided: 4 sessions for Operator (4 different crews) 1 session for Engineers and Technician TOTAL RAW BID PRICE

Lump Sum

Lump Sum

You might also like