You are on page 1of 21

Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

NJL-0074 Ver. 1.0 J-Lay Tower - Power Balance Analysis 2/5

This is an electronically generated document which has been reviewed and approved in accordance with Acergy’s
Management System. An audit trail of review and approval is available within the electronic system and a master
approved copy is available from the HSEQ Department.

The screen version of this document is the CONTROLLED COPY at all times. When printed it is considered a FOR
INFORMATION ONLY copy, and it is the holder’s responsibility that he / she holds the latest valid version

TABLE OF CONTENTS

1. INTRODUCTION ................................................................................................ 3
1.1 GENERAL ........................................................................................................ 3
1.2 ABREVIATIONS & DEFINITIONS............................................................................... 3
1.3 REFERENCE DOCUMENTS ...................................................................................... 3
2. J-LAY ELECTRICAL INSTALLATION.................................................................... 4
2.1 CONNECTIONS .................................................................................................. 4
2.2 J-LAY SYSTEM OPERATING MODES........................................................................... 4
3. POWER REQUIREMENTS ................................................................................... 4
3.1 SIMULTANEITY FACTOR ........................................................................................ 4
3.2 NORMAL PIPE LAY : DJ HOISTED WITH DRAWWORKS ..................................................... 4
3.3 NORMAL PIPE LAY : CATENARY HOISTED WITH DRAWWORKS ............................................ 4
3.4 WELDING AND COATING ...................................................................................... 5
3.5 A&R OPERATION : ABANDONMENT WITH A&R WINCH ................................................... 5
3.6 A&R OPERATION : RECOVERY WITH A&R WINCH......................................................... 5
3.7 POWER CONSUMPTION SUMMARY............................................................................ 5
Annexe 1...............................................................................................................................................................6
Annexe 2...............................................................................................................................................................7
Annexe 3...............................................................................................................................................................8
Annexe 4...............................................................................................................................................................9
Annexe 5.............................................................................................................................................................10
Annexe 6.............................................................................................................................................................11
Annexe 7.............................................................................................................................................................12
Annexe 8.............................................................................................................................................................13
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

NJL-0074 Ver. 1.0 J-Lay Tower - Power Balance Analysis 3/5

1. INTRODUCTION
1.1 GENERAL
Fall 2006, the DLB Acergy Polaris replaced its old J-Lay tower with a new upgraded
version able to accommodate higher top tensions and lay larger diameter pipe. This
new J-lay tower took the place of the current J-lay tower.
This new J-Lay system was designed and built in Rotterdam, Holland by a combined
team from Acergy and “Huisman Itrec”. In conjunction with the tower a new pipe-
loading escalator were required to complete the J-Lay system. The completed pipe
escalator system (PES) was designed and built in UK by “The Engineering Business
Ldt”.

The main differences are in :


- the loads implied by the new J-lay tower. Indeed, this new pipe-laying asset
weights approximately 3000t whereas the current system weights around
1000t. It is approximately 2000t to be added to the installation vessel at mid-
ship starboard. Moreover the pipe-laying capacity means the weight of the pipe
catenary, the J-lay tower is capable of holding, is 750t static with the new J-lay
tower. These 750t are to be compared to the 380t pipe-laying capacity of the
current system.
- the electrical power requirement. While the old system was mainly of hydraulic
type, requiring power for its HPU, the new system is electrical and requires
power from the barge switchboards for all components : mainly winches and
pumps.

Furthermore, an active gimballing system has been designed for the tower,
ensuring more flexibility to the tower regarding the barge movements. This
gimballing system is hydraulic and requires more pumps when applied.

1.2 ABREVIATIONS & DEFINITIONS


Abbreviation Definition
DLB Derrick Lay Barge
EB The Engineering Business
DJ Double Joint
HI Huisman-Itrec
JLTS J-LAY Tower Structure
PES Pipe Elevator System
POLARIS DLB Acergy Polaris
WS1 Working Station #1
WS2 Working Station #2

1.3 REFERENCE DOCUMENTS


Acergy document No Document description
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

NJL-0074 Ver. 1.0 J-Lay Tower - Power Balance Analysis 4/5

UPG-005 Acergy Polaris – Load Balance Analysis

2. J-LAY ELECTRICAL INSTALLATION


2.1 CONNECTIONS
The J-Lay System is electrically connected on the barge switchboards as shown on
Annexe 1.

SWITCHBOARD RATED J-LAY SYSTEM CONSUMER


BREAKER BREAKER DESIGNATION
MS2
P451 1000A J-Lay Tower Main 460V
P452 1000A PES Main 460V
P453 630A Distribution board D2 – WS2
P454 2000A Transformer T2 – Drive Main supply
P455 2000A . HPU – Pumps (1&2)
. HPU – Pumps (3&4)
MS4
2000A Transformer T1 – Drive Main supply
D1
5Q4 160A J-Lay Tower Main 230V (Transformer)
5Q6 160A PES Utility cabinet
EMS
11Q3 100A . J-Lay Tower Emergency 230V
. MCR Normal 230V
. MCR Emergency 230V
11Q4 63A PES Emergency 460V

2.2 J-LAY SYSTEM OPERATING MODES


This analysis is gathering data for the most consuming operating modes :

- Normal pipe lay : DJ hoisted with drawworks


- Normal pipe lay : Catenary hoisted with drawworks
- Welding and coating
- A&R operation : Abandonment with A&R winch
- A&R operation : Recovery with A&R winch

3. POWER REQUIREMENTS
3.1 SIMULTANEITY FACTOR
See Annexe 2

3.2 NORMAL PIPE LAY : DJ HOISTED WITH DRAWWORKS


See Annexe 3

3.3 NORMAL PIPE LAY : CATENARY HOISTED WITH DRAWWORKS


See Annexe 4
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

NJL-0074 Ver. 1.0 J-Lay Tower - Power Balance Analysis 5/5

3.4 WELDING AND COATING


See Annexe 5

3.5 A&R OPERATION : ABANDONMENT WITH A&R WINCH


See Annexe 6

3.6 A&R OPERATION : RECOVERY WITH A&R WINCH


See Annexe7

3.7 POWER CONSUMPTION SUMMARY


See Annexe 8

Catenary hoisted
Normal Pipe Lay

Normal Pipe Lay

With A&R winch

with A&R winch


Abandonment
DJ hoisted

Recovery
Welding

Coating
+
TOTAL 1800kW 1450kW 2250kW 1100kW 2250kW
With Active Gimballing 2300kW 1950kW 2750kW 1600kW 2750kW

Note :

- Active gimballing is planned to be rarely used on Greater Plutonio project (Pipe


J-laid part with Polaris new tower).

- Possibly power consumption of the barge could be temporary readjusted during


active gimballing use (Electrical thrusters, ROVs,…).
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

NJL-0074 Ver. 1.0 J-Lay Tower - Power Balance Analysis Annexe 1

Annexe 1
General Power Distribution – One Line Diagram
ACERGY POLARIS

J-LAY TOWER HUISMAN

6280
2120

POL-FR-N-D-17-5-000
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

NJL-0074 Ver. 1.0 J-Lay Tower - Power Balance Analysis Annexe 2

Annexe 2
Simultaneity Factor
J-LAY TOWER LOAD BALANCE ANALYSIS

SIMULTANEITY FACTOR

POWER SUPPLY SIMOPS FACTOR


INSTALLED Normal Pipe Lay Normal Pipe Lay Normal Pipe Lay Abandonment Recovery
DESIGNATION NAME DJ hoisted Welding + FJC Catenary hoisted with A&R winch with A&R winch
POWER
T1 or T2
Brake Resistor 69R1 800 kW
0%
Brake Resistor 69R2 800 kW
Drawworks upper 211M1 750 kW 22% 42%
0% 0%
Drawworks upper 212M1 750 kW 650kW needed available on T1/T2
A&R winch upper 911M1 145 kW
10%
A&R winch upper 912M1 145 kW
0% keeped in case of 100%
A&R winch upper 913M1 145 kW
need
A&R winch upper 914M1 145 kW
A&R storage winch 931M1 30 kW 10%
A&R storage winch 932M1 30 kW 0% keeped in case of 100%
A&R storage winch 933M1 30 kW need
Brake Resistor 69R3 800 kW
0%
Brake Resistor 69R4 800 kW
Drawworks upper 221M1 750 kW 22% 42%
0% 0%
Drawworks upper 222M1 750 kW 650kW needed available on T1/T2
A&R winch upper 921M1 145 kW
10%
A&R winch upper 922M1 145 kW
0% keeped in case of 100%
A&R winch upper 923M1 145 kW
need
A&R winch upper 924M1 145 kW
14%
Erector winch 111M1 160 kW Power use : 70% of nominal value
Duration use : 20% (5min per 1/2h + 30%contingencies)
EPU
50% 61% 27%
Main 460V 637 kW
Max. consumers Max. consumers Max. consumers
66%
Main 230V 76 kW
Maximum consumers
80%
Emergency 230V 40 kW
Maximum consumers
HPU
65%
Pump 1 71M1 300 kW
300kW installed
Pump power: 280kW
Pump 2 72M1 300 kW
Power use: 70% of nominal value
Pump 3 73M1 300 kW 0%
(Pump 4) 0%
MCR
100%
Normal 230V 20 kW
Poser supply for Control Room whatever operation in progress
100%
Emergency 230V 6 kW
Poser supply for Control Room whatever operation in progress
PES
30%
1000A installed
Normal 460V 637 kW
400A need
PET time rate 75%
Utility Cabinet 102 kW 80%
Emergency 460V 40 kW 0%
D2
4%
Tower Access Bridge 23 kW
1h a day
80%
FJC-Induction Heating 319 kW 0% 500A installed 0%
400A used
0%
FJC-IMPU 64 kW
Either IMPU or induction heating
Subcontractors 40 kW 100%
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

NJL-0074 Ver. 1.0 J-Lay Tower - Power Balance Analysis Annexe 3

Annexe 3
DJ hosted with drawworks
J-LAY TOWER - LOAD BALANCE ANALYSIS
DJ HOISTED WITH DRAWWORKS

POWER SUPPLY
DESIGNATION NAME RATED SIMOPS FACTOR USED POWER
T1 or T2 672 kW
Brake Resistor 69R1 800 kW 0%
Brake Resistor 69R2 800 kW 0%
Drawworks upper 211M1 750 kW 22% 162 kW
Drawworks upper 212M1 750 kW 22% 162 kW
A&R winch upper 911M1 145 kW 0%
A&R winch upper 912M1 145 kW 0%
A&R winch upper 913M1 145 kW 0%
A&R winch upper 914M1 145 kW 0%
A&R storage winch 931M1 30 kW 0%
A&R storage winch 932M1 30 kW 0%
A&R storage winch 933M1 30 kW 0%
Brake Resistor 69R3 800 kW 0%
Brake Resistor 69R4 800 kW 0%
Drawworks upper 221M1 750 kW 22% 162 kW
Drawworks upper 222M1 750 kW 22% 162 kW
A&R winch upper 921M1 145 kW 0%
A&R winch upper 922M1 145 kW 0%
A&R winch upper 923M1 145 kW 0%
A&R winch upper 924M1 145 kW 0%
Erector winch 111M1 160 kW 14% 22 kW
EPU 401 kW
Main 460V 637 kW 50% 319 kW
Main 230V 76 kW 66% 50 kW
Emergency 230V 40 kW 80% 32 kW
HPU 390 kW
Pump 1 71M1 300 kW 65% 195 kW
Pump 2 72M1 300 kW 65% 195 kW
Pump 3 73M1 300 kW 0% kW
(Pump 4)
MCR 26 kW
Normal 230V 20 kW 100% 20 kW
Emergency 230V 6 kW 100% 6 kW
PES 273 kW
Normal 460V 637 kW 30% 191 kW
Utility Cabinet 102 kW 80% 82 kW
Emergency 460V 40 kW 0%
D2 41 kW
Tower Access Bridge 23 kW 4% 1 kW
FJC-Induction Heating 319 kW 0%
FJC-IMPU 64 kW 0%
Subcontractors 40 kW 100% 40 kW

Total 1804 kW
Total with Active Gimballing 2314 kW
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

NJL-0074 Ver. 1.0 J-Lay Tower - Power Balance Analysis Annexe 4

Annexe 4
Catenary hoisted with drawworks
J-LAY TOWER - LOAD BALANCE ANALYSIS
CATENARY HOISTED WITH DRAWWORKS

POWER SUPPLY
RATED USED
DESIGNATION NAME SIMOPS FACTOR
POWER POWER
T1 or T2 1282 kW
Brake Resistor 69R1 800 kW 0% 0 kW
Brake Resistor 69R2 800 kW 0% 0 kW
Drawworks upper 211M1 750 kW 42% 315 kW
Drawworks upper 212M1 750 kW 42% 315 kW
A&R winch upper 911M1 145 kW 0% 0 kW
A&R winch upper 912M1 145 kW 0% 0 kW
A&R winch upper 913M1 145 kW 0% 0 kW
A&R winch upper 914M1 145 kW 0% 0 kW
A&R storage winch 931M1 30 kW 0% 0 kW
A&R storage winch 932M1 30 kW 0% 0 kW
A&R storage winch 933M1 30 kW 0% 0 kW
Brake Resistor 69R3 800 kW 0% 0 kW
Brake Resistor 69R4 800 kW 0% 0 kW
Drawworks upper 221M1 750 kW 42% 315 kW
Drawworks upper 222M1 750 kW 42% 315 kW
A&R winch upper 921M1 145 kW 0% 0 kW
A&R winch upper 922M1 145 kW 0% 0 kW
A&R winch upper 923M1 145 kW 0% 0 kW
A&R winch upper 924M1 145 kW 0% 0 kW
Erector winch 111M1 160 kW 14% 22 kW
EPU 255 kW
Main 460V 637 kW 27% 172 kW
Main 230V 76 kW 66% 50 kW
Emergency 230V 40 kW 80% 32 kW
HPU 390 kW
Pump 1 71M1 300 kW 65% 195 kW
Pump 2 72M1 300 kW 65% 195 kW
Pump 3 73M1 300 kW 0% 0 kW
(Pump 4)
MCR 26 kW
Normal 230V 20 kW 100% 20 kW
Emergency 230V 6 kW 100% 6 kW
PES 273 kW
Normal 460V 637 kW 30% 191 kW
Utility Cabinet 102 kW 80% 82 kW
Emergency 460V 40 kW 0% 0 kW
D2 41 kW
Tower Access Bridge 23 kW 4% 1 kW
FJC-Induction Heating 319 kW 0% 0 kW
FJC-IMPU 64 kW 0% 0 kW
Subcontractors 40 kW 100% 40 kW

Total 2267 kW
Total with Active Gimballing 2777 kW
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

NJL-0074 Ver. 1.0 J-Lay Tower - Power Balance Analysis Annexe 5

Annexe 5
Welding and coating
J-LAY TOWER - LOAD BALANCE ANALYSIS
WELDING + FJC

POWER SUPPLY
RATED USED
DESIGNATION NAME SIMOPS FACTOR
POWER POWER
T1 or T2 22 kW
Brake Resistor 69R1 800 kW 0% 0 kW
Brake Resistor 69R2 800 kW 0% 0 kW
Drawworks upper 211M1 750 kW 0% 0 kW
Drawworks upper 212M1 750 kW 0% 0 kW
A&R winch upper 911M1 145 kW 0% 0 kW
A&R winch upper 912M1 145 kW 0% 0 kW
A&R winch upper 913M1 145 kW 0% 0 kW
A&R winch upper 914M1 145 kW 0% 0 kW
A&R storage winch 931M1 30 kW 0% 0 kW
A&R storage winch 932M1 30 kW 0% 0 kW
A&R storage winch 933M1 30 kW 0% 0 kW
Brake Resistor 69R3 800 kW 0% 0 kW
Brake Resistor 69R4 800 kW 0% 0 kW
Drawworks upper 221M1 750 kW 0% 0 kW
Drawworks upper 222M1 750 kW 0% 0 kW
A&R winch upper 921M1 145 kW 0% 0 kW
A&R winch upper 922M1 145 kW 0% 0 kW
A&R winch upper 923M1 145 kW 0% 0 kW
A&R winch upper 924M1 145 kW 0% 0 kW
Erector winch 111M1 160 kW 14% 22 kW
EPU 471 kW
Main 460V 637 kW 61% 389 kW
Main 230V 76 kW 66% 50 kW
Emergency 230V 40 kW 80% 32 kW
HPU 390 kW
Pump 1 71M1 300 kW 65% 195 kW
Pump 2 72M1 300 kW 65% 195 kW
Pump 3 73M1 300 kW 0% 0 kW
(Pump 4) 0%
MCR 26 kW
Normal 230V 20 kW 100% 20 kW
Emergency 230V 6 kW 100% 6 kW
PES 273 kW
Normal 460V 637 kW 30% 191 kW
Utility Cabinet 102 kW 80% 82 kW
Emergency 460V 40 kW 0% 0 kW
D2 296 kW
Tower Access Bridge 23 kW 4% 1 kW
FJC-Induction Heating 319 kW 80% 255 kW
FJC-IMPU 64 kW 0% 0 kW
Subcontractors 40 kW 100% 40 kW

Total 1479 kW
Total with Active Gimballing 1989 kW
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

NJL-0074 Ver. 1.0 J-Lay Tower - Power Balance Analysis Annexe 6

Annexe 6
Abandonment with A&R winch
J-LAY TOWER - LOAD BALANCE ANALYSIS
CATENARY ABANDONMENT WITH A&R WINCH

POWER SUPPLY
RATED USED
DESIGNATION NAME SIMOPS FACTOR
POWER POWER
T1 or T2 147 kW
Brake Resistor 69R1 800 kW 0% 0 kW
Brake Resistor 69R2 800 kW 0% 0 kW
Drawworks upper 211M1 750 kW 0% 0 kW
Drawworks upper 212M1 750 kW 0% 0 kW
A&R winch upper 911M1 145 kW 10% 15 kW
A&R winch upper 912M1 145 kW 10% 15 kW
A&R winch upper 913M1 145 kW 10% 15 kW
A&R winch upper 914M1 145 kW 10% 15 kW
A&R storage winch 931M1 30 kW 10% 3 kW
A&R storage winch 932M1 30 kW 10% 3 kW
A&R storage winch 933M1 30 kW 10% 3 kW
Brake Resistor 69R3 800 kW 0% 0 kW
Brake Resistor 69R4 800 kW 0% 0 kW
Drawworks upper 221M1 750 kW 0% 0 kW
Drawworks upper 222M1 750 kW 0% 0 kW
A&R winch upper 921M1 145 kW 10% 15 kW
A&R winch upper 922M1 145 kW 10% 15 kW
A&R winch upper 923M1 145 kW 10% 15 kW
A&R winch upper 924M1 145 kW 10% 15 kW
Erector winch 111M1 160 kW 14% 22 kW
EPU 255 kW
Main 460V 637 kW 27% 172 kW
Main 230V 76 kW 66% 50 kW
Emergency 230V 40 kW 80% 32 kW
HPU 390 kW
Pump 1 71M1 300 kW 65% 195 kW
Pump 2 72M1 300 kW 65% 195 kW
Pump 3 73M1 300 kW 0% 0 kW
(Pump 4)
MCR 26 kW
Normal 230V 20 kW 100% 20 kW
Emergency 230V 6 kW 100% 6 kW
PES 273 kW
Normal 460V 637 kW 30% 191 kW
Utility Cabinet 102 kW 80% 82 kW
Emergency 460V 40 kW 0% 0 kW
D2 41 kW
Tower Access Bridge 23 kW 4% 1 kW
FJC-Induction Heating 319 kW 0% 0 kW
FJC-IMPU 64 kW 0% 0 kW
Subcontractors 40 kW 100% 40 kW

Total 1132 kW
Total with Active Gimballing 1642 kW
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

NJL-0074 Ver. 1.0 J-Lay Tower - Power Balance Analysis Annexe 7

Annexe 7
Recovery with A&R winch
J-LAY TOWER - LOAD BALANCE ANALYSIS
CATENARY RECOVERY WITH A&R WINCH

POWER SUPPLY
RATED USED
DESIGNATION NAME SIMOPS FACTOR
POWER POWER
T1 or T2 1272 kW
Brake Resistor 69R1 800 kW 0% 0 kW
Brake Resistor 69R2 800 kW 0% 0 kW
Drawworks upper 211M1 750 kW 0% 0 kW
Drawworks upper 212M1 750 kW 0% 0 kW
A&R winch upper 911M1 145 kW 100% 145 kW
A&R winch upper 912M1 145 kW 100% 145 kW
A&R winch upper 913M1 145 kW 100% 145 kW
A&R winch upper 914M1 145 kW 100% 145 kW
A&R storage winch 931M1 30 kW 100% 30 kW
A&R storage winch 932M1 30 kW 100% 30 kW
A&R storage winch 933M1 30 kW 100% 30 kW
Brake Resistor 69R3 800 kW 0% 0 kW
Brake Resistor 69R4 800 kW 0% 0 kW
Drawworks upper 221M1 750 kW 0% 0 kW
Drawworks upper 222M1 750 kW 0% 0 kW
A&R winch upper 921M1 145 kW 100% 145 kW
A&R winch upper 922M1 145 kW 100% 145 kW
A&R winch upper 923M1 145 kW 100% 145 kW
A&R winch upper 924M1 145 kW 100% 145 kW
Erector winch 111M1 160 kW 14% 22 kW
EPU 255 kW
Main 460V 637 kW 27% 172 kW
Main 230V 76 kW 66% 50 kW
Emergency 230V 40 kW 80% 32 kW
HPU 390 kW
Pump 1 71M1 300 kW 65% 195 kW
Pump 2 72M1 300 kW 65% 195 kW
Pump 3 73M1 300 kW 0% 0 kW
(Pump 4)
MCR 26 kW
Normal 230V 20 kW 100% 20 kW
Emergency 230V 6 kW 100% 6 kW
PES 273 kW
Normal 460V 637 kW 30% 191 kW
Utility Cabinet 102 kW 80% 82 kW
Emergency 460V 40 kW 0% 0 kW
D2 41 kW
Tower Access Bridge 23 kW 4% 1 kW
FJC-Induction Heating 319 kW 0% 0 kW
FJC-IMPU 64 kW 0% 0 kW
Subcontractors 40 kW 100% 40 kW

Total 2257 kW
Total with Active Gimballing 3157 kW
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

NJL-0074 Ver. 1.0 J-Lay Tower - Power Balance Analysis Annexe 8

Annexe 8
Tower consumption summary
J-LAY TOWER LOAD BALANCE ANALYSIS

SUMMARY

POWER SUPPLY SIMOPS FACTOR


RATED/INSTALLED Normal Pipe Lay Normal Pipe Lay Normal Pipe Lay Abandonment Recovery
DESIGNATION NAME DJ hoisted Welding + FJC Catenary hoisted with A&R winch with A&R winch
POWER
T1 or T2 672 kW 22 kW 1282 kW 147 kW 1272 kW
Brake Resistor 69R1 800 kW 0% 0% 0% 0% 0%
Brake Resistor 69R2 800 kW 0% 0% 0% 0% 0%
Drawworks upper 211M1 750 kW 22% 0% 42% 0% 0%
Drawworks upper 212M1 750 kW 22% 0% 42% 0% 0%
A&R winch upper 911M1 145 kW 0% 0% 0% 10% 100%
A&R winch upper 912M1 145 kW 0% 0% 0% 10% 100%
A&R winch upper 913M1 145 kW 0% 0% 0% 10% 100%
A&R winch upper 914M1 145 kW 0% 0% 0% 10% 100%
A&R storage winch 931M1 30 kW 0% 0% 0% 10% 100%
A&R storage winch 932M1 30 kW 0% 0% 0% 10% 100%
A&R storage winch 933M1 30 kW 0% 0% 0% 10% 100%
Brake Resistor 69R3 800 kW 0% 0% 0% 0% 0%
Brake Resistor 69R4 800 kW 0% 0% 0% 0% 0%
Drawworks upper 221M1 750 kW 22% 0% 42% 0% 0%
Drawworks upper 222M1 750 kW 22% 0% 42% 0% 0%
A&R winch upper 921M1 145 kW 0% 0% 0% 10% 100%
A&R winch upper 922M1 145 kW 0% 0% 0% 10% 100%
A&R winch upper 923M1 145 kW 0% 0% 0% 10% 100%
A&R winch upper 924M1 145 kW 0% 0% 0% 10% 100%
Erector winch 111M1 160 kW 14% 14% 14% 14% 14%
EPU 401 kW 471 kW 255 kW 255 kW 255 kW
Main 460V 637 kW 50% 61% 27% 27% 27%
Main 230V 76 kW 66% 66% 66% 66% 66%
Emergency 230V 40 kW 80% 80% 80% 80% 80%
HPU 390 kW 390 kW 390 kW 390 kW 390 kW
Pump 1 71M1 300 kW 65% 65% 65% 65% 65%
Pump 2 72M1 300 kW 65% 65% 65% 65% 65%
Pump 3 73M1 300 kW 0% 0% 0% 0% 0%
(Pump 4) 0%
MCR 26 kW 26 kW 26 kW 26 kW 26 kW
Normal 230V 20 kW 100% 100% 100% 100% 100%
Emergency 230V 6 kW 100% 100% 100% 100% 100%
PES 273 kW 273 kW 273 kW 273 kW 273 kW
Normal 460V 637 kW 30% 30% 30% 30% 30%
Utility Cabinet 102 kW 80% 80% 80% 80% 80%
Emergency 460V 40 kW 0% 0% 0% 0% 0%
D2 41 kW 296 kW 41 kW 41 kW 41 kW
Tower Access Bridge 23 kW 4% 4% 4% 4% 4%
FJC-Induction Heating 319 kW 0% 80% 0% 0% 0%
FJC-IMPU 64 kW 0% 0% 0% 0% 0%
Subcontractors 40 kW 100% 100% 100% 100% 100%

Total 1804 kW 1479 kW 2267 kW 1132 kW 2257 kW


with Active gimballing 2314 kW 1989 kW 2777 kW 1642 kW 2767 kW