Concrete Cracking in New Bridge Decks and Overlays

Proposal to the Wisconsin Highway Research Program Wisconsin Department of Transportation

By

Baolin Wan, Ph.D. Christopher M. Foley, Ph.D., P.E.

Transportation Research Center Department of Civil & Environmental Engineering Marquette University Milwaukee, Wisconsin

February 26, 2008

PROBLEM STATEMENT A relatively recent National Cooperative Highway Research Program (NCHRP) study reported that there were more than 100,000 bridges in US suffering from early transverse cracks (Krauss and Rogalla 1996). Bridges in Wisconsin also have such problems. There appears to be a trend for new bridge decks in the state of Wisconsin to develop transverse cracks as shown in Figure 1 and map cracks on concrete overlays as shown in Figure 2. There are many reasons for concrete bridge deck cracking including constituent components of the concrete, construction method and superstructure design. The cracks can accelerate the penetration of water, sulfates, chloride and other harmful agents into the deck, and therefore accelerate the corrosion of steel reinforcement and the deterioration of the bridge. This degradation will require costly maintenance or repair, and shorten the service life of the bridge deck. Therefore, a study is needed to identify the key factors causing bridge deck cracking in the State, and to develop recommendations on concrete mixture design, construction practice and structure design to eliminate or reduce such cracks.

Figure 1 Typical transverse crack in concrete bridge deck (Frosch, et al. 2002).

Figure 2 Typical map crack in concrete overlay (Kosmatka et al. 2002).

RESEARCH OBJECTIVES The objectives of this research are to gain better and more up-to-date understanding of early concrete cracking of bridge decks and overlays; establish a database including bridge information, crack location, concrete ingredients and properties, construction method, superstructure type, possible causes, and other relevant data for selected bridges in the State; and identify the key factors which cause early concrete cracking in the bridge decks in Wisconsin. Upon completion of this project, researchers will provide recommendations for concrete mixture design, construction practice and structure design for future bridge construction to eliminate or reduce early concrete cracking. Laboratory and/or field studies, finite element analysis methodologies targeted to quantify constraint characteristics, and analytical studies to estimate the stresses in concrete deck at early age will also be recommended for potential Phases II or III of this study based upon the finding of this project. BACKGROUND AND SIGNIFICANCE OF WORK Bridges, as one of the major components in civil infrastructure, play significant role in transportation and occupy a large portion of federal and state budgets for construction and maintenance. Therefore, the durability of bridges is very important from social and economic viewpoints. However, early concrete bridge deck cracking, which cause durability problems, tend to develop in many bridges. An NCHRP study estimated that there were more than 100,000 bridges having transverse cracks in 1996 (Krauss and Rogalla 1996). Water, chloride and other deteriorating agents can easily penetrate into the concrete deck through these cracks and make contact with the reinforcement in the deck. These deteriorating agents will cause corrosion of steel reinforcement, spalling, and eventually a loss of cross section. This becomes worse when deicing chemicals are applied because the chloride in the deicing salt will accelerate the

Wan and Foley: 1 of 20

corrosion of steel reinforcement. Leakage of water through the bridge deck may also damage the substructure and affect the aesthetics of the bridge (Krauss and Rogalla 1996). Transverse cracks located 3-10 ft apart along the longitudinal direction of the bridge usually develop when concrete is set and widen with time (Krauss and Rogalla 1996; Ramey et al. 1997; Hadidi and Saadeghvaziri 2003, 2005; Saadeghvaziri and Hadidi 2002, 2005). Concrete cracking in its early age is normally due to restraint which prevents concrete volumetric change (Hadidi and Saadeghvaziri 2005; Saadeghvaziri and Hadidi 2002; Brown et al. 2001; Folliard et al. 2003). The volumetric change of concrete can result from chemical shrinkage, drying shrinkage, autogenous shrinkage, plastic shrinkage, subsidence, swelling, thermal loads and creep (Kosmatka et al. 2002). Drying shrinkage is due to the loss of adsorbed water. Autogenous shrinkage is a volume change when there is no moisture transfer to the surrounding environment, and normally occurs in high strength or high performance concrete with low water-to-cement ratio. Plastic shrinkage is due to the loss of water from the cement paste in fresh concrete. When concrete cools after initial hydration, it shrinks due to temperature change. Creep is the gradual increase in strain with time in concrete under sustained load. Creep actually can mitigate a portion of the shrinkage in concrete. However, it takes a long time for creep to take effect and therefore, it does not help to reduce early-age cracking due to shrinkage. If the concrete deck or overlay is free to move when it shrinks or expands, no stresses and therefore no cracks will be developed as illustrated in Figure 3.
Concrete Deck or Overlay Shrinkage Shrinkage Roller

Figure 3 No crack in concrete deck or overlay if it is free to move.


Shri
Transverse Crack

S st hrin ro ka ng g er e w re ith st ra in t

Sh rin ka

Transverse Crack Deck


Shrinkage with weaker restraint

ge

nka ge

in

S st hrin ro ka ng g er e w re ith st ra in t

sub

base

Figure 4 Cause of Transverse cracks in concrete bridge deck.

Figure 5 Cause of Map cracks in concrete overlay.

Resistance to concrete volumetric change comes from internal and external sources (Folliard et al. 2003). The steel reinforcement in the deck and aggregates provide internal restraint. The friction between bridge deck and girder; and the shear studs which are required to create composite action between deck and girder, are sources of external restraint. When concrete shrinkage is restrained, tensile stress is induced (Hadidi and Saadeghvaziri 2005; Saadeghvaziri and Hadidi 2002; Brown et al. 2001; Folliard et al. 2003; Wongtanakitcharoen and Naaman 2007). If this tensile stress exceeds the concrete tensile strength, concrete cracks. In bridges, the restraint from girders to decks is stronger in longitudinal direction, and therefore concrete deck cracking predominantly occurs in transverse direction as shown Figure 4. Restrained drying shrinkage is believed to be the major cause of bridge deck cracking (Frosch

Wan and Foley: 2 of 20

Re st ra in t

31 0 ft

Restraint from Girder

Rest raint from

nk a

ge

fro m

Shri

su b

ba se

Map Crack

Sh r

ka

ge

et al. 2002; Brown et al. 2001; Folliard et al. 2003). In the case of concrete overlays, the sub base resists volume change in all directions due to friction between them, and the result is map cracks as shown in Figure 5. There are many factors which can affect concrete volumetric change and cracking. Hadidi and Saadeghvaziri (2005) performed an in-depth state-of-the-art literature review on the causes and control of transverse deck cracking. They classified these causes into three categories: material and mix design; construction practices and ambient conditions; and structural design factors. The factors and their effects in these three categories are summarized in following: Material and Mix Design Factors: Aggregate: Larger aggregate size, larger aggregate percentage by mix volume, and use of aggregates with high specific gravity can reduce cracking. Water Content: Increased water content will increase cracking. Cement Type: Cement type has a significant effect on cracking. Use of Type II cement can reduce cracking through a reduced early thermal gradient. Cement Content: Higher amount of cement will cause more cracking due to higher drying shrinkage, higher temperature rise during hydration and higher early modulus of elasticity of concrete. W/C Ratio: Reducing the water/cement (W/C) ratio can reduce shrinkage of concrete and therefore reduce cracking. Slump: Some researchers reported increased cracking with increasing slump, but others concluded that there is no relation between the slump of concrete and the cracking. Air Content: There are conflicted conclusions with respect to air content. Some indicate that an increase in the air content reduces cracking, but others show no relation between air content and cracking. Admixture: The effect of different admixtures on cracking is not completely understood yet. Construction Practices and Ambient Condition Factors: Weather: Thermal stresses developed at an early age in a concrete deck depend greatly on concrete temperature and weather conditions. Both hot and cold weather increase cracking. Low levels of humidity and high wind speed can also increase cracking. Curing: Adequate and timely curing is a key factor in reducing cracking. Extended curing time (7 to 14 days) is suggested to reduce cracking. Pour of Concrete: Pour length, sequence and rate may have some effect on deck cracking. It is recommended a pouring sequence be specified and pouring irregularities be avoided. Time of Casting: It is indicated that evening and nighttime concrete casting can reduce the extent of cracking. Finishing: Early finishing reduces cracking. Applying water or grout to the concrete surface during finishing has adverse effects on cracking. Revolutions: Excess revolutions in the concrete truck do not affect cracking. Vibration: Under-vibrated areas tend to develop more cracks. However, over-vibration of concrete does not cause any noticeable effect on cracking. Form Type: There are no consistent conclusions on the effect of form type. Structural Design Factors: Girder: Decks on steel girders tend to crack more when compared to decks on concrete girders because concrete girders conduct heat at a slower rate. Cast in place

Wan and Foley: 3 of 20

concrete girders and young prestressed girders have the best performance, while the deep steel beams have the greatest adverse effect. The relative stiffness of the deck with respect to girder is more critical than the type of girder. The girder end condition has a pronounced effect on deck cracking. Cracking is more prevalent on continuous spans when compared to simple spans. Shear Studs: Girder restraint resulting from shear studs causes significant cracking. Concrete Cover: Increased cover depth reduces the risk of cracking. However, excessive increase in cover depth increases the probability of settlement cracks over the reinforcement. Deck Thickness: Increase in deck thickness reduces deck cracking which is probably due to higher deck to girder stiffness ratio. Reinforcement: Bar size, type, spacing and distribution have significant affect on the tendency for cracking. Cracking increases with an increase in bar size. Increasing the amount of longitudinal reinforcement without increasing the bar size can reduce cracking. Limiting transverse bar size and/or maximizing transverse bar spacing are also recommended. Some researchers found that epoxy coated bars tend to cause more cracking, but others recommend using epoxy bars to reduce cracking. Details of construction are also an important factor. Section Stiffness: Research efforts appear to have conflicting conclusions with regard to the effects of section stiffness. Some suggest an increase in structure stiffness to reduce cracking, while others suggest a decrease in structure stiffness. Dynamic Factors: There are no conclusive results regarding the effect of structure vibration on concrete cracking. Traffic: Some studies show that there is no relationship between daily bridge traffic and tendency of cracking. Others found that bridges carrying fewer trucks at lower speeds exhibit less cracking than those carrying large number of trucks at higher speeds. It seems that there is more early-age bridge deck cracking in the immediately preceding decade than the decade before. One reason might be the extensive use of high performance concrete (HPC) in bridge construction during last decade (Hadidi and Saadeghvaziri 2005). Although increased concrete strength can help with decreasing permeability and improving freeze-thaw performance, the rich concrete mixture for HPC may cause more cracking (Petrou et al. 2001; Hussein 2006). Although the tensile strength of HPC is higher, the higher modulus of elasticity and low creep have lead to an increase of cracking (Lwin and Russell 2006). The previous discussion clearly shows the complexity present in understanding concrete bridge deck cracking. There are many different factors that influence deck cracking. However, the fundamental reason that concrete bridge decks crack is that the volume change of the concrete is restrained. Therefore, the methods to reduce concrete cracking come from two possibilities: reducing volume change in the concrete and reducing restraint on concrete deck. Altering a few key construction practices (Camisa et al. 2004) and using minimum transverse bar size and spacing can also reduce deck cracking (Russell 2004). The efforts to reduce volume change of concrete involve primarily modifications to material and mix design. Shrinkage reducing admixtures (SRA) (Folliard et al. 2003) or shrinkage compensating cements (Krauss and Rogalla 1996; Hadidi and Saadeghvaziri 2005; Saadeghvaziri and Hadidi 2002) can be used to reduce shrinkage. It is recommended that concrete with low early strength, low elastic modulus, low heat of hydration, high tensile strength and high creep can be used for mitigating shrinkage (Yun et al. 2007; Frosch et al. 2002; Folliard et al. 2003). Using fiber reinforced concrete (Krauss and Rogalla 1996; Wongtanakitcharoen and Naaman 2007; Brooks 2000) and prestressed deck system (Krauss and Rogalla

Wan and Foley: 4 of 20

1996) are promising approaches to reduce deck cracking. However, they may not be economical for widespread application (Hadidi and Saadeghvaziri 2005; Saadeghvaziri and Hadidi 2002). The standard testing methods to measure the volume change of concrete at early age are AASHTO T160 - Drying Shrinkage of Concrete (Free Shrinkage), AASHTO PP34-99 - Restrained Shrinkage Cracking of Concrete, and ASTM C878 - Restrained Expansion of Shrinkage-Compensating Concrete. The ring test is often used to measure the shrinkage and cracking of early age concrete subjected to restraint (Hossain and Weiss 2006; Sant et al. 2006; Brown et al. 2007; He et al. 2004). The restrained ring test method consists of casting a 3 in. thick concrete ring around the perimeter of a steel ring, then moist curing the specimen, and subsequently placing the rings in an environmentally controlled chamber at a temperature of 72 F, with 50% relative humidity. The concrete is then subjected to extremely high levels of restraint against shrinkage provided by the steel. Consequently, the ring test represents a worstcase scenario for concrete when dealing with shrinkage cracking (Brown et al. 2001). From the viewpoint of load capacity of the entire bridge superstructure, the composite action of deck and girder is preferred and it is a cost-effective design. However, the trade-off with respect to composite action is that it provides significant restraint to free shrinking of the deck. Such restraint prevents free volumetric change and therefore, introduces tensile stress in concrete to cause cracking. Because many bridges are statically indeterminate structures, the entire bridge structure will respond to the change in volume of concrete deck. The magnitude and distribution of stresses are dependent on the relative stiffness between deck and girder and the boundary conditions. Therefore, although the benefit of composite action of deck and girder should not be given up, appropriate design of bridge structure will be able to reduce the tensile stress in concrete deck when the load is introduced by the concrete volumetric change. Hadidi et al. (2003) developed a method to estimate tensile stresses in concrete bridge decks for different boundary conditions. However, experimental and/or field data are needed to verify its accuracy before it can be used in design practice. Although there are a large number of research efforts that have been performed, most transportation departments are still facing the problem of early concrete deck cracking in bridges. This indicates that more research is needed to identify key factors which cause the cracking and to find the promising methods which can eliminate or control cracking. BENEFITS Early-age cracking causes durability problems and reduces the service life of a bridge deck and overlay. Therefore, the key factors affecting early-age cracking should be identified, and then the methods to eliminate or reduce the early cracking in concrete bridge decks and concrete overlays should be found. The present research effort will provide WisDOT guidance in these efforts. Successful completion of the proposed effort will provide WisDOT with better understanding of the causes of concrete bridge deck early cracking and map cracking in concrete overlays. It will identify the key factors which affect these types of cracking in Wisconsin practice. Finally, the completed research will result in recommendations for concrete mixture design, construction practice and structural design to eliminate or reduce the early cracking in concrete bridge deck and concrete overlay in Wisconsin. IMPLEMENTATION There are three immediate avenues for implementation of the information generated through the completed research effort. First of all, the results are expected to provide suggestions with respect to concrete mixture design to reduce early cracking. Secondly, the results can be used to identify the construction practices that reduce the likelihood of early concrete cracking. Lastly, results of the research effort will also support revisions to the WisDOT Construction and Materials Manual and the WisDOT Bridge Manual.

Wan and Foley: 5 of 20

DETAILED WORK PLAN The objectives of this research are to gain a better and more up-to-date understanding of early concrete cracking on bridge decks and overlays; establish a database including bridge information, crack location, concrete ingredients and properties, construction method, superstructure type, possible cause for the crack and other relevant data for the selected bridges in the State; identify the key factors which cause early concrete cracking in the practice in Wisconsin. In order to achieve these objectives, the proposed research effort will generate the following outcomes for WisDOT: perform a literature review and generate a synthesis of other state DOTs practice and recent research in the area of early concrete deck cracking and map crack in overlay; collect and review all available field documents of the bridges built in recent past in the State which exhibit early concrete cracking problem; observe the construction procedure of pouring concrete decks and overlay to identify construction techniques which may affect concrete cracking; interview bridge engineers and construction engineers to understand the common design and construction methods in Wisconsin; provide WisDOT an easily understood database with bridge information, location, contributing factors, possible causes and other relevant data; provide WisDOT with recommended changes to concrete mixture design, construction practice and structural design to eliminate or reduce early concrete cracking; provide WisDOT with recommendations with regard to potential Phase II field and/or laboratory studies, and numerical and analytical modeling designed to quantify the reasons for early concrete cracking. In order to demonstrate these outcomes, the PIs propose to complete the following tasks during the award period. Task 1 Review State-of-the-Art and State-of-Practice The research team will conduct an extensive review of available U.S. and international research findings, performance data and other information related to transverse cracks on concrete bridge decks and map cracks on concrete overlays. This will include literature related to laboratory studies, field testing, analytical and numerical models related to bridge deck cracking. A review of practice in other state DOTs to eliminate or reduce bridge deck cracking will also be performed. Many State DOTs including Pennsylvania (Spangler and Tikalsky 2006), South Carolina (Hussein 2006), Ohio (Miller et al. 2006), Indiana (Frosch et al. 2002), Texas (Brown et al. 2001), New Jersey (Saadeghvaziri and Hadidi 2002), Kansas (Browning and Darwin 2007; Lindquist et al. 2005) and Oregon (Books 2000) have performed research on this topic. Currently, there are some other State DOTs including New York, New Jersey and Indiana with research in progress to study bridge deck cracking. The research team will include their findings in the review. This task will culminate with a synthesis of the review findings. Task 2 Establishing a Database of the Bridges with Deck Cracking Problems in Wisconsin The research team will log into WisDOT Highway Structures Information System (HSI) (https://trust.dot.state.wi.us/hsi/HSIController) to collect information for bridges in the State which exhibit early concrete cracking problem. The field inspection reports of each bridge will be carefully reviewed to identify the crack type, location, spacing and size. A tentative data sheet for each investigated bridge is proposed as shown in Figure 6. Most of information required in this sheet can be found in the HSI. The weather condition of construction period will be collected from the record of the weather station close the bridge, which can be easily found in the National Climatic Data Center (NCDC) website: http://www.ncdc.noaa.gov/oa/ncdc.html. The research team will also contact the bridge design Wan and Foley: 6 of 20

engineers, construction engineers and maintenance teams in WisDOT to gather the information which is not available in HIS, but is important for identifying the causes of cracking. The contributing factors for concrete deck cracking will be grouped into three categories: material and mix design, construction practices, and structural design factors. After collecting and reviewing the information from the HSI, field trips will be made to the specific bridges to validate the findings from reviewing the documents. This task will generate an easily understood database. The information in the database will be divided into six major categories for each bridge. These are: general information, structural design information, material properties and mix design information, construction information, crack information, and possible causes for the crack.

Figure 6 Tentative bridge data sheet for this research. Task 3 Identifying Key Factors Affecting Early Concrete Deck Cracking The research team will interview bridge engineers and construction engineers to understand the common design and construction methods in Wisconsin. Several field trips will also be made to observe the construction procedure for pouring concrete decks and overlay. The PIs will carefully study the information collected in Task 2, the information obtained from the interview with engineers, and information gleaned from the observation of construction. Emphasis will be put on comparing the bridges with similar cracking patterns to find the common factors among them. All possible factors of mixture design, construction procedure and structural design will be evaluated. The completion of this task will generate a group of key factors which contribute to the early concrete deck cracking in the State.

Wan and Foley: 7 of 20

Task 4 Recommendations Based on the results of Tasks 1 through 3, the research team will make recommendations with respect to material and concrete mixture design, which includes but will not be limited to the selection of aggregate size and content, cement type and content, W/C ratio, and admixtures to reduce the total shrinkage of concrete. The recommendations will also be made for construction practice and structural design to avoid possible adverse effects on concrete cracking. The final step in the process will be to formulate recommendations with respect to moving ahead with Phase II as envisioned in the RFP. It is impossible to fully predict the results of this research before it is completed. However, the PIs envision that at least two types of experimental work need to be done to verify the recommendations made by the work of Phase I. The first is a shrinkage test to make sure that the concrete mixture recommended by Phase I does have smaller shrinkage compared with that of current used mixture. A relatively large scale bridge deck specimen with different boundary conditions should be tested to study the effect of different levels of constraint. Although not required by the RFP, a simple finite element model was developed during the preparation of this proposal to demonstrate the constraint effect on stress distribution in a concrete deck when its volume is changed. A 100 in. 100 in. 10 in. concrete slab was modeled using ANSYS finite element analysis software as shown in Figure 6(a). Since the software can not explicitly impose expansion or shrinkage strains to the model, a temperature load was applied to the concrete slab to simulate the shrinkage. A coefficient of thermal expansion of 6 10-6 microstrain/oF was assigned to concrete. A temperature change of 50 oF was applied to the model which corresponds to a shrinkage strain of 300 microstrain. Two constraint situations were analyzed. The first one was that all nodes in the bottom surface of the concrete slab were constrained in all direction, and the second one was that only x and y directions were constrained. The principle stress contours on the bottom surface of these two cases are shown in Figure 6 (b) and (c), respectively. It is obvious that the model with constraint in all direction has the tendency to develop map cracks, especially in the corner areas (Figure 6(b)), while the model without z direction constraint has the tendency to develop transverse cracks (Figure 6(c)). The model with stronger constraint also develops much larger principle stress.
Y

y
MX

MX MN

zZ
Y X

Possible Cracks x (b)

zZ
Y X

(a)

Possible x Cracks (c)

Figure 6 Demonstration of constraint effect on stress distribution in concrete deck: (a) 3D finite element model; (b) principle stress contour in the model with all direction constraint; (c) principle stress contour in the model with constraint in x and y directions. The PIs envision that it is necessary to develop a detailed 3D finite element model for a series of typical bridges in Wisconsin to study concrete deck cracking behavior in a potential Phase II or III of this research. The successful model can be used to predict the cracking in concrete bridge deck when it is subjected shrinkage and thermal load at early age. Once the valid model is established, a parametric study can be performed. The parameters which should be included in the parametric study are the degree

Wan and Foley: 8 of 20

of composite action between deck and girder, deck thickness, spacing between girders, girder support condition, deck reinforcement, relative stiffness between deck and girder, and girder flange width. Through parametric study, the key structural factors which affect concrete deck cracking will be identified and recommendations can be made for bridge design and construction practice to reduce the tendency of concrete deck cracking. Another recommendation for Phase II/III of this research is to establish a simple analytical tool to estimate stresses in concrete deck. The finite element analysis is a very good method to simulate complex structures and to do parametric study. However, it is not easy to use in everyday design work. Therefore, the PIs suggest developing a simple analysis tool, e.g., equations, in Phase II/III to estimate the stress in concrete deck due to shrinkage and thermal loading using solid mechanics theory. The strain in concrete deck due to temperature change, T, can be calculated by Equation (1). T = T (1) where is the thermal expansion coefficient and T is the change of temperature. The shrinkage strain, SH,t, in concrete can be estimated by using Equation 2 which is recommended by ACI Committee 209 (1998).

(2) SH ,t = (780 10 6 ) SH +t where t is time in days, and SH are curing condition factor and correction factor, respectively. In order to simplify the analysis, the shrinkage strain can be transferred to a temperature decrease, which is equal to SH ,t , and is added as a temperature load to model shrinkage. Besides the overall temperature
rise and drop, daily temperature and solar radiation will produce a temperature differential through the section. AASHTO (1998) suggests a temperature gradient profile for concrete girder as shown in Figure 7. In this figure, the deck and girder can be separated to different layers due to temperature gradient. The strain between different layers should be continuous, i.e., i ,bottom = i +1,top , to maintain a plane section. With this compatibility condition and girder support condition, the stresses in the deck due to concrete shrinkage and temperature change can be calculated as demonstrated by Hadidi and Saadenghvaziri (2003). It can be anticipated that the results from theoretical equations will not be same as those in real bridge. Therefore, the concrete deck stress results from theoretical equations should be compared to the results of finite element model and experimental tests, which are assumed to be performed in Phase II of the project, to obtain a correction factor.

T1

T2

Layer 1 Layer 2 Layer 3

Temperature gradient

Figure 7 Temperature gradient in concrete bridge deck and girder. Task 5 Progress Reports and Final Report The research team will provide a series of progress reports to WisDOT in order to keep all interested parties informed and provide a mechanism for feedback as the research program is undertaken. It is envisioned that the first of these reports will take place at the completion of Task 2. The second progress report will made after the completion of Task 3. A final report will also be submitted to the Wisconsin Highway Research Program for distribution through their research library. It is also expected that the

Wan and Foley: 9 of 20

researchers will present their findings periodically at annual meetings of the Transportation Research Board. WORK TIME SCHEDULE A tentative schedule has been developed for the proposed research effort. It includes the five tasks discussed earlier in the detailed work plan: Task 1 Task 2 Task 3 Task 4 Task 5 Review of State-Of-The-Art and State-Of-Practice Establishing a Database of the Bridges with Deck Cracking Problems in Wisconsin Identifying Key Factors Affecting Early Concrete Deck Cracking Recommendations Progress Reports and Final Report

A timeline for completion of each task is given in Table 1. It should be noted that Task 5 in the figure is defined as a final report even though its description given previously involved progress reports that are to be generated throughout the research effort. Table 1: Phasing of Tasks during FY 2008-09. Task 1 2 3 Progress Report 2 4 5 REPORTS Report will be submitted to WisDOT in September 2009. WisDOT will be informed of all activities on a regular cycle from the start of the project to completion through the Wisconsin Highway Research Program quarterly reporting mechanism. Other details regarding reporting were described in the Detailed Work Plan section of the proposal. BUDGET REQUIREMENTS A detailed budget for the proposed effort is given in Appendix A. PI and co-PI time is included in the budget for planning and execution of the project. Stipend for one graduate research assistant to aid in executing the project is requested. This individual will conduct the literature review, collect data of the bridge and assemble the database under the supervision of the PI and co-PI. QUALIFICATIONS OF RESEARCH TEAM Baolin Wan, Ph.D. Assistant Professor of Civil Engineering Dr. Wan has extensive research experience on the cracking development and propagation in Fiber Reinforced Polymer (FRP) retrofitted concrete members. Such experience will help him study the cracking in concrete deck and overlay of this project. He teaches the civil engineering materials and concrete design classes at Marquette University since 2004, and understands the properties of concrete and design philosophies of concrete structures. He is working with Dr. Foley on two WisDOT sponsored projects: In-Situ Monitoring and Testing of IBRC Bridges in Wisconsin (Project ID: 0092-05-02) and Fatigue Risks in the Connection of Sign Support Structures (Project ID: 0092-08-14). Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Progress Report 1

Wan and Foley: 10 of 20

Christopher M. Foley, Ph.D., P.E. Associate Professor of Civil Engineering Dr. Foley has been a member of the MU Faculty for 11 years and is involved in teaching and research activities in the area of structural engineering. He recently completed a WisDOT-sponsored effort evaluating structural performance of full-span overhead sign structures and high-mast luminaire supports (Foley, et al 2003) and is working with Baolin Wan on Phase 1 of a recently awarded WHRP effort. This research effort involved many aspects that are integral to the proposed research effort and his experience will ensure success of the present effort. Dr. Foley is currently working with Dr. Wan on a long-term monitoring effort of two Wisconsin IBRC bridges. FACILITIES AVAILABLE Marquette Universitys College of Engineering and Department of Civil & Environmental Engineering have a full complement of computational resources (including finite element analysis software ANSYS, MathCAD, and Matlab) that can be devoted as required to the current effort. Raynor Library facilities at MU are state-of-the-art and the library staff is capable of aiding the researchers in obtaining virtually any document related to the present research effort. REFERENCES CITED American Association of State Highway and Transportation Officials (AASHTO) (1998). AASHTO LRFD Bridge Design Specification, 2nd Edition, Washington, D.C. American Concrete Institute (ACI) Committee 209 (1998). Prediction of Creep, Shrinkage, and Temperature Effects in Concrete Structures, Detroit, Michigan. Brooks, E.W. (2000). Polypropylene Fiber Reinforced Microsilica Concrete Bridge Deck Overlay at Link River Bridge, OR-EF-00-11, Oregon Department of Transportation, Salem, Oregon. Brown, M.D., Sellers, G., Folliard, K. and Fowler, D. (2001). Restrained Shrinkage Cracking of Concrete Bridge Decks: State-of-the-Art Review, FHWA/TX-0-4098-1, Texas Department of Transportation, Austin, TX. Browning, J. and Darwin, D. (2007). Specifications to Reduce Bridge Deck Cracking, HPC Bridge Views, Issue No. 46. Camisa, S.J., Tepke, D.G., Schokker, A.J. and Tikalsky, P.J. (2004). Reduction of Early-Age Cracking of a Concrete Bridge Deck, Proceedings of the 2004 Concrete Bridge Conference, CD-ROM.. Folliard, K., Smith, C., Sellers, G., Brown, M.D. and Breen, J.E. (2003). Evaluation of Alternative Materials to Control Drying-Shrinkage Cracking in Concrete Bridge Decks, FHWA/TX-04/04098-4, Texas Department of Transportation, Austin, TX. Frosch, R.J., Blackman, D.T. and Radabaugh, R.D. (2002). Investigation of Bridge Deck Cracking in Various Bridge Superstructure Systems, FHWA/IN/JTRP-2002/25, Indiana Department of Transportation, Indianapolis, IN. Hadidi, R. and Saadeghvaziri, M.A. (2003). Practical Tool to Accurately Estimate Tensile Stresses in Concrete Bridge Decks to Control Transverse Cracking, Practice Periodical on Structural Design and Construction, Vol. 8, No. 2, pp. 74-82. Hadidi, R. and Saadeghvaziri, M.A. (2005). Transverse Cracking of Concrete Bridge Decks: State-ofthe-Art, Journal of Bridge Engineering, Vol. 10, No. 5, pp. 503-510. He, Z., Zhou, X. and Li, L. (2004). New Experimental Method for Studying Early-Age Cracking of Cement-Based Materials, ACI Materials Journal, Vol. 101, No. 1, pp. 50-56. Hossain, A.B. and Weiss, J. (2006). The Role of Specimen Geometry and Boundary Conditions on Stress Development and Cracking in the Restrained Ring Test, Cement and Concrete Research, Vol. 36, No. 1, pp. 189-199. Hussein, A.A. (2006). Early Age Cracking in South Carolinas Bridge Decks, HPC Bridge Views, Issue No. 45. Kosmatka S.H., Kerkhoff, B. and Panarese, W.C. (2002). Design and Control of Concrete Mixtures, 14th Edition, Portland Cement Association, Skokie, Illinois.

Wan and Foley: 11 of 20

Krauss, P.D. and Rogalla, E.A. (1996). Transverse Cracking in Newly Constructed Bridge Decks, NCHRP Report 380, Transportation Research Board, National Research Council, Washington, D.C. Lindquist, W.D., Darwin, D. and Browning, J. (2005). Cracking and Chloride Content in Reinforced Concrete Bridge Decks, SM Report No. 78, University of Kansas Center for Research, Lawrence, Kansas. Lwin, M.M. and Russell, H.G. (2006). Reducing Cracks in Concrete Bridge Decks, HPC Bridge Views, Issue No. 45. Miller, R., Mirmiran A., Ganesh, P. and Saproo, M. (2006). Transverse Cracking of High Performance Concrete Bridge Decks After One Season or 6 to 8 Months, FHWA/OH-2006/6, Ohio Department of Transportation, Columbus, OH. Petrou, M.F., Harries, K.A. and Schroeder, G.E. (2001). Field Investigation of High-Performance Concrete Bridge Decks in South Carolina, Transportation Research Record No. 1770, pp. 12-19. Ramey, G.E., Wolff, A.R. and Wright, R.L. (1997). Structural Design Actions to Mitigate Bridge Deck Cracking, Practice Periodical on Structural Design and Construction, Vol. 2, No. 3, pp. 118-124. Russell, H.G. (2004). Concrete Bridge Deck Performance: A Synthesis of Highway Practice, NCHRP Synthesis 333, Transportation Research Board, National Research Council, Washington, D.C. Saadeghvaziri, M.A. and Hadidi, R. (2002). Cause and Control of Transverse Cracking in Concrete Bridge Decks, FHWA-NJ-2002-019, New Jersey Department o f Transportation, Trenton, NJ. Saadeghvaziri, M.A. and Hadidi, R. (2005). Transverse Cracking of Concrete Bridge Decks: Effects of Design Factors, Journal of Bridge Engineering, Vol. 10, No. 5, pp. 511-519. Sant, G., Lura, P. and Weiss, J. (2006). Measurement of Volume Change in Cementitious Materials at Early Ages Review of Testing Protocols and Interpretation of Results, Transportation Research Record No. 1979, pp. 21-29. Spangler, B. and Tikalsky, P.J. (2006). Mitigating Deck Cracking in Pennsylvania, HPC Bridge Views, Issue No. 45. Wongtanakitcharoen, T. and Naaman A.E. (2005). Unrestrained Early Age Shrinkage of Concrete with Polypropylene, PVA, and Carbon Fibers, Materials and Structures, Vol. 40, No. 3, pp. 289-300. Yun, K.K., Kim, K.H., Jeong, W.K. and Kim, S.K. (2007). Causes and Prevention of Bridge Deck Overlay Cracking with Very-Early Strength Latex-Modified Concrete, Transportation Research Board Annual Meeting 2007, Paper 07-0318.

Wan and Foley: 12 of 20

Appendix B Vitaes for Key Personnel Baolin Wan, Ph.D Assistant Professor Department of Civil and Environmental Engineering Marquette University Haggerty Hall 264 1515 W. Wisconsin Avenue Milwaukee, WI 53233 Email: Baolin.wan@marquette.edu EDUCATION Doctor of Philosophy (Ph.D.), 2002, University of South Carolina, Columbia, SC Master of Science (M.S.), 1999, University of South Carolina, Columbia, SC Bachelor of Engineering (B.E.), 1996, Tsinghua University, Beijing, China PROFESSIONAL EXPERIENCE 2004-current Assistant Professor, Marquette University 2003-2004 Post Doctor Fellow, University of South Carolina 1997-2003 Research Assistant, University of South Carolina 1997-1999 Teaching Assistant, University of South Carolina 1995-1997 Research Assistant, Tsinghua University PROFESSIONAL AFFILIATION American Concrete Institute (ACI) Member of Committee 440 American Society of Civil Engineers (ASCE) International Institute for FRP in Construction (IIFC) Precast/Prestressed Concrete Institute (PCI) PUBLICATIONS: REFEREED JOURNALS Ouyang, Z. and Wan, B., 2008. Modeling of Moisture Diffusion in FRP Strengthened Concrete Specimens, ASCE Journal of Composites for Construction, (accepted). Ouyang, Z. and Wan, B., 2008. Experimental and Numerical Study of Moisture Effects on the Bond Fracture Energy of FRP/Concrete Joints, Journal of Reinforced Plastics and Composites, Vol. 27, No. 2, p205-223. Wan, B., Petrou, M.F. and Harries, K.A., 2006. Effect of the Presence of Water on the Durability of Bond Between CFRP and Concrete, Journal of Reinforced Plastics and Composites, Vol. 25, No. 8, p875-890. Coogler, K., Harries, K.A., Wan, B., Rizos, D.C. and Petrou M.F., 2005. Critical Evaluation of Strain Measurements in Glass Fiber-Reinforced Polymer Bridge Decks, ASCE Journal of Bridge Engineering, Vol. 10, No. 6, November/December, 2005, p704-712. Wan, B., Rizos, D.C., Petrou, M.F. and Harries, K.A., 2005. Computer Simulations and Parametric Studies of GFRP Bridge Deck Systems, Composite Structures, Vol. 69, No. 1, June 2005, p103-115.

Wan and Foley: 14 of 20

Wan, B., Sutton, M., Petrou, M.F., Harries, K.A. and Li, N., 2004. Investigation of Bond between FRP and Concrete Undergoing Global Mixed Mode I/II Loading, ASCE Journal of Engineering Mechanics, Vol. 130, December 2004, pp 1467-1475. Wan, B., Harries, K.A. and Petrou, M.F., 2002. Transfer Length of Strands in Prestressed Concrete Piles, ACI Structural Journal, Vol. 99, No.5, September-October 2002, p577-585. Wan, B., Petrou, M.F., Harries, K.A. and Hussein, A.A., 2002. Top Bar Effect in Prestressed Concrete Piles, ACI Structural Journal, Vol. 99, No.2, March-April 2002, p208-214. Petrou, M.F., Wan, B., Joiner, W.S., Trezos, C.G. and Harries, K.A., 2000. Excessive Strand End Slip in Prestessed Piles, ACI Structural Journal, Vol. 97, No.5, September-October 2000, p774-782. Petrou, M.F., Wan, B., Gadala-Maria, F., Kolli, V.G. and Harries, K.A., 2000. Influence of Mortar Rheology on Aggregate Settlement, ACI Materials Journal, Vol. 97, No.4, July-August 2000, p479-485. PUBLICATIONS: REFEREED CONFERENCES Foley, C.M., Wan, B. and Liu, J., 2008. Wheel Load Distribution in Concrete Bridge Decks with FRP Stay-In-Place Forms, Special technical session on FRP Stay-in-Place Forms for Concrete Structures: Research Activities, Case Studies, and Field Applications at the ACI Spring 2008 Convention, Los Angeles, CA, March 30-April 3, 2008, (accepted). Ouyang, Z. and Wan, B., 2007. Analytical Solution of Bond Behavior in Moist Environments for FRPConcrete Joints under Peel Loading, Asia-Pacific Conference on FRP in Structures (APFIS 2007), Hong Kong, China, December 12-14, 2007, p907-912. Ouyang, Z. and Wan, B., 2007. Bond Interface Region Relative Humidity (IRRH) Modeling for FRP Bonded Concrete Specimen, The 8th International Symposium on Fiber Reinforced Polymer Reinforcement for Concrete Structures (FRPRCS-8), Patras, Greece, July 16-18, 2007. Dai, J., Yokota, H., Ueda, T. and Wan, B., 2007. Coupled Bending and Dowel Actions Influence the Interface Bond Fracture in RC Beams Strengthened with FRP Sheets in Flexure: an experimental investigation, The 6th International Conference on Fracture Mechanics of Concrete and Concrete Structures (FraMCoS-6), Catania, ITALY, June 17-22, 2007, p1149-1156. Wan, B., Foley, C.M., and Martin, K., 2007. Freeze-Thaw Cycling Effects on Shear Transfer between FRP Stay-in-Place Formwork and Concrete, The Third International Conference on Durability & Field Applications of Fiber Reinforced Polymer (FRP) Composites for Construction, CDCC 2007, Quebec City, Canada, May 22-24, 2007, p227-234. Ouyang, Z. and Wan, B., 2007. Modeling the Deterioration of Bond between FRP and Concrete due to Moisture Attack, The Third International Conference on Durability & Field Applications of Fiber Reinforced Polymer (FRP) Composites for Construction, CDCC 2007, Quebec City, Canada, May 22-24, 2007, p135-142. Wan, B. and Ouyang, Z., 2006. Finite Element Analysis of FRP Debonding from Concrete Undergoing Global Mixed Mode I/II Loading, The Third International Conference on FRP Composites in Civil Engineering (CICE 2006), Miami, U.S., December 13-15, 2006, p433-436.

Wan and Foley: 15 of 20

Ouyang, Z. and Wan, B., 2006. Deterioration Mechanism of Bond between CFRP Plate and Concrete in Moisture Environment, The Third International Conference on FRP Composites in Civil Engineering (CICE 2006), Miami , U.S., December 13-15, 2006, p263-266. Ouyang, Z. and Wan, B., 2006. Numerical Simulation of Bond Deterioration between CFRP Plate and Concrete in Moisture Environment, The Third International Conference on FRP Composites in Civil Engineering (CICE 2006), Miami , U.S., December 13-15, 2006, p395-398. Wan, B., Harries, K.A., Petrou, M.F. Sutton, M.A. and Li, N., 2003. Experimental Investigation of Bond Between FRP and Concrete, Proceedings of 2003 SEM Annual Conference, Charlotte, June 2-4, 2003, CD-ROM. Wan, B., Petrou, M.F., Harries, K.A., Sutton, M.A. and Yang, B., 2002. Experimental Investigation of Bond between FRP and Concrete, Proceedings of the Third International Conference on Composites in Infrastructure, San Francisco, California, June 10-13, 2002, CD-ROM. PUBLICATIONS: NON-REFEREED CONFERENCES, INTERNET JOURNAL AND REPORTS Ouyang, Z. and Wan, B., 2006. Bond Deterioration between CFRP Plate and Concrete after Exposure to Moisture, 2006 International Symposium on Safety Science and Technology (2006 ISSST), Changsha, China, October 24-27, 2006, p2384-2388. Ouyang, Z. and Wan, B., 2006. Two Dimensional Moisture Diffusion in FRP Bonded Concrete Beam, 2006 International Symposium on Safety Science and Technology (2006 ISSST), Changsha, China, October 24-27, 2006, p2389-2396. Turner, M.K., Harries, K.A., Petrou, M.F., Rizos, D. and Wan, B., 2003. In-Situ Evaluation of Demonstration GFRP Bridge Deck System Installed on South Carolina Route S655, University of South Carolina, Department of Civil and Environmental Engineering Report No. ST 03-02, 180 pp. Sutton, M.A., Wan, B., Petrou, M.F., and Harries, K.A., 2002. Two-Dimensional Computer Vision to Investigate FRP-Concrete Bond Toughness, Advanced Measurement Methods, Volume 1, May 2002, http://www.sem.org/SEMNanoMat/index.asp. Petrou M.F., Wan, B. and Harries, K.A., 2000. Continued Investigation of Strand Slippage in Prestressed Concrete Piles, Volume I, Experimental Investigation of Strand End Slip in Prestressed Concrete Piles, FHWA/SCDOT Report No. FHWA-SC-00-07, December 2000.

Wan and Foley: 16 of 20

Christopher M. Foley, Ph.D., P.E. Associate Professor Department of Civil and Environmental Engineering Marquette University Haggerty Hall 267 1515 W. Wisconsin Avenue Milwaukee, WI 53233 Email: chris.foley@marquette.edu EDUCATION B.S.C.E. M.S. Ph.D.

1986 1989 1996

Marquette University Marquette University Marquette University

PROFESSIONAL EXPERIENCE (1993 PRESENT) Aug. 2002 Present Associate Professor (with Tenure), Marquette University Aug. 2004 May 2005 Visiting Associate Professor University of Wisconsin Madison Nov. 2000 Present Adjunct Member of Graduate Faculty, The University of Memphis Jan. 1996 Aug. 2002 Assistant Professor, Marquette University Sept. 1994 - Jan. 1996 Struct. Engineer - Project Engineer, Pujara, Wirth, Torke, Inc. Aug. 1993 - Aug. 1994 John P. Raynor Fellow, Marquette University May 1993 - Aug. 1993 Struct. Engin. - Project Engineer, Pujara, Wirth, Torke, Inc. Aug. 1992 - May 1993 Arthur J. Schmitt Fellow, Marquette University PROFESSIONAL AFFILIATIONS American Society of Civil Engineers (ASCE) Structural Engineering Institute Technical Committee on Optimal Structural Design (Chair) Technical Administrative Committee Analysis and Computation American Institute of Steel Construction (AISC) Member of Committee on Research Specification Task Committee 6 Connections HSS Subcommittee Structural Stability Research Council (SSRC) COURSES TAUGHT: Graduate/Undergraduate Level: Graduate Level:

Matrix Structural Analysis, Bridge Design Structural Engineering for Natural Hazard Mitigation, Nonlinear Structural Analysis

SELECTED PUBLICATIONS: Book Chapters 2007 Foley, C.M. Structural Optimization Using Evolutionary Computation, Optimization of Structural and Mechanical Systems, Arora, J.S., Ed., World Scientific, pp. 59-120. 2002 Foley, C.M. Optimized Performance-Based Design for Buildings, Chapter 8 in Recent Advances in Optimal Structural Design, Burns, S.A., Ed., ASCE/SEI Technical Committee on Optimal Structural Design, American Society of Civil Engineers, Reston, VA, pp. 169-240.

Peer Reviewed Journal Publications 2008 Foley, C.M., Schneeman, C., Barnes, K. Quantifying and Enhancing Robustness in Steel Structures: Part 1 Moment-Resisting Frames, Engineering Journal, American Institute of Steel Construction, Chicago, IL (at press). 2008 Foley, C.M., Barnes, K., Schneeman, C. Quantifying and Enhancing Robustness in Steel Structures: Part 2 Floor Framing Systems, Engineering Journal, American Institute of Steel Construction, Chicago, IL (at press).

Wan and Foley: 17 of 20

2007

Rojas, H., Pezeshk, S., Foley, C.M. Performance-Based Optimization Considering Both Structural and Nonstructural Components, Earthquake Spectra, Earthquake Engineering Research Institute, Vol. 23, No. 3, pp. 685-709. Corliss, G., Foley, C.M., Kearfott, R.B., Formulation for Reliable Analysis of Structural Frames, Reliable Computing, Vol. 13, No. 2, Kluwer Academic Publishers, pp. 125-147. Foley, C.M., Pezeshk, S., Alimoradi, A., Probabilistic Performance-Based Optimal Design of Steel Moment-Resisting Frames: Part 1 Formulation, Journal of Structural Engineering, (at press). Alimoradi, A., Pezeshk, S., Foley, C.M., Probabilistic Performance-Based Optimal Design of Steel Moment-Resisting Frames: Part 2 Applications, Journal of Structural Engineering, (at press). Foley, C.M., Schaad, J., Discussion of Flexible Moment Connections for Unbraced Frames Subjected to Lateral Forces A Return to Simplicity, Engineering Journal, American Institute of Steel Construction, Third Quarter, pp. 227-229. Alimoradi, A., Pezeshk, S., Foley, C.M. Evolutionary Seismic Design for Optimal Performance, Intelligent Computational Paradigms in Earthquake Engineering, Lagaros, N.D., Tsompanakis, Y., Eds., Idea Group Publishing, Hershey, PA, pp. 42-58. Foley, C.M., Peronto, J.L., Fournelle, R.A., Fatigue Life Prediction and Variability of New and Existing Welded CHS Y-Joints, Engineering Journal, American Institute of Steel Construction, First Quarter, Vol. 43, No. 1, pp. 57-80. Foley, C.M. and Schinler, D. Automated Design of Steel Frames Using Advanced Analysis and ObjectOriented Evolutionary Computation, Journal of Structural Engineering, Vol. 129, No. 5, pp. 648-660. Foley, C.M. Advanced Analysis of Steel Frames Using Parallel Processing and Vectorization ComputerAided Civil & Infrastructure Engineering, Blackwell Publishers, Vol. 16, No. 5, pp. 305-325. Foley, C.M. and Vinnakota, S., Inelastic Behavior of Multistory Partially Restrained Steel Frames - Part I Journal of Structural Engineering, ASCE, 125 (8) pp. 854-861. Foley, C.M. and Vinnakota, S., Inelastic Behavior of Multistory Partially Restrained Steel Frames - Part II Journal of Structural Engineering, ASCE, 125 (8) pp. 862-869. Foley, C.M. and Buckhouse, E. Method to Increase the Capacity and Stiffness of Reinforced Concrete Beams Practice Periodical on Structural Design and Construction, ASCE, Vol. 4, No. 1, February, pp. 36-42.

2007 2007 2007 2006

2007

2006

2003 2001 1999 1999 1999

Refereed Conference Publications 2007 Wan, B., Foley, C.M., Martin, K. Freeze-Thaw Cycling Effects on Shear Transfer Between FRP Stay-InPlace Formwork and Concrete, Proceedings of the Third International Conference on Durability and Field Applications of Fiber-Reinforce-Polymer (FRP) Composites for Construction (CDCC-2007), Quebec City, Quebec (accepted for presentation and at press). 2006 Foley, C.M., Schneeman, C.L., Martin, K. Quantifying Inherent Robustness in Structural Steel Framing Systems, Invited Paper, Advances in Engineering Structures, Mechanics, and Construction, Proceedings of an International Conference on Advances in Engineering Structures, Mechanics, and Construction, Pandey, M., Xie, W.-C., Xu, L., Eds, Waterloo, ONT, Canada, Springer, The Netherlands, pp. 239-254. Corliss, G., Foley, C.M., Kearfott, R.B. Formulation for Reliable Analysis of Structural Frames, Proceedings of NSF Workshop on Reliable Engineering Computing, September 15-17, Savannah, GA, pp. 81-102. Foley, C.M. and Lucas, W.K., Optimal Selection and Design of Composite Steel Floor Systems Considering Vibration, 2004 ASCE Structures Congress, Nashville, TN (CD-ROM). Alimoradi, A., S. Pezeshk, and C.M. Foley. Automated Performance-Based Design of Steel Frames, 2004 ASCE Structures Congress, Nashville, TN (CD-ROM). Alimoradi, A., S. Pezeshk, and C.M. Foley. Identification of Input Ground Motion Records for Seismic Design Using Neuro-Fuzzy Pattern Recognition and Genetic Algorithms, 2004 ASCE Structures

2004

2004 2004 2004

Wan and Foley: 18 of 20

Congress, Nashville, TN (CD-ROM). 2003 Foley, C.M., Pezeshk, S., Alimoradi, A., State-of-the-Art in Performance-Based Design Optimization, Proceedings of the 2003 Structures Congress and Exposition, Seattle, WA, May 29-31, CD-ROM (abstract). Foley, C.M., Lucas, W., Automated and Optimized Performance-Based Design of Steel Floor Framing Systems, Proceedings of the 2003 Structures Congress and Exposition, Seattle, WA, May 29-31, CDROM (abstract). Foley, C.M. and Ginal, S.J. Fatigue Evaluation of Full-Span VMS/CMS Support Structures Subjected to Simulated Truck-Induced Gusts and Natural Wind Turbulence, Invited Paper (ASCE Committee on Fatigue and Fracture), Proceedings of the 2002 Structures Congress and Exposition, Denver, CO, April 4-6, CD-ROM (abstract). Domblesky, J. and Foley, C.M. A Model for Active and Inter-Disciplinary Learning in Upper-Level Engineering Courses, 2001 North Midwest Section Annual Conference, American Society for Engineering Education, University of North Dakota. Foley, C.M. and Schinler, D. Optimized Design of Partially Restrained Frames Using Distributed Plasticity, Invited Paper (ASCE Committee on Methods of Analysis), 2001 Structures Congress ASCE, Washington, DC, CD-ROM (full paper). Schinler, D. and Foley, C.M. An Object-Oriented Evolutionary Algorithm for Automated Advanced Analysis Based Design, Proceedings of Bird-of-a-Feather Workshop on Optimal Structural Design Using Genetic and Evolutionary Computation, 2001 Genetic and Evolutionary Computation Conference (GECCO 2001), San Francisco, CA, July 7, pp. 73-78. Voss, M.S., Foley, C.M. Evolutionary Algorithm for Structural Optimization, Proceedings: 1999 Genetic and Evolutionary Computation Conference, July 13-19, Orlando, FL, American Association of Artificial Intelligence, pp. 678-685. Voss, M.S., Foley, C.M. The (,,,) Distribution: A Selection Scheme for Ranked Populations, Proceedings: 1999 Genetic an d Evolutionary Computation Conference - Late Breaking Papers, July 1319, Orlando, FL, pp. 284-291. Vinnakota, S. and Foley, C.M. Second-Order Elasto-Plastic Analysis of Steel Frames - Review and Comments, Proceedings 1998 Annual Technical Session and Meeting, Structural Stability Research Council, Atlanta, GA, September 21-23, pp. 267-278. Foley, C.M. and Gillis, K. Evaluation of Overstrength for Partially Restrained Unbraced Steel Frames, Frames with Partially Restrained Connections, Ricles, J., Bjorhovde, R., Iwankiw, N., Eds. Workshop Proceedings, Structural Stability Research Council, Atlanta, GA, September 23, pp. 127-142. Foley, C.M. and Vinnakota, S., "Non-Linear Analysis of Structural Frameworks Using Supercomputing Techniques", Proceedings of the First Congress on Computing in Civil Engineering, Washington, D.C., June 20-22, pp. 2058-2065. Foley, C.M. (2006) A Bridge on the Verge: What Happened to the Hoan Bridge?, Institute of Transportation Engineers MU Student Chapter, Lunch-Time Seminar, February 23. Foley, C.M., Wan, B. (2006) Field Instrumentation and Long-Term Monitoring of FRP Highway Bridges in Wisconsin, University of Wisconsin at Madison, July 10. Foley, C.M. and Schaad, J. Manual and Inelastic-Analysis Based Design of Partially-Restrained Frames Using the 2005 AISC Specifications, Proceedings of the 2006 ASCE-SEI Structures Congress, St. Louis, MO, American Society of Civil Engineers, (CD-ROM). Foley, C.M., Wan, B., Schneeman, C.L., Martin, K. Field Instrumentation and Long-Term Monitoring of FRP Highway Bridges in Wisconsin Proceedings of the 2006 ASCE-SEI Structures Congress, St. Louis, MO, American Society of Civil Engineers, (no paper submitted for CD-ROM).

2003

2002

2001

2001

2001

1999

1999

1998

1998

1994

Conference and Other Presentations 2006 2006 2006

2006

Wan and Foley: 19 of 20

2006 2005 2005

Martin, K.E., Schneeman, C.L., Foley, C.M. Innovative Bridges in Wisconsin: Design, Long-Term Monitoring, and Load Testing, ACI Wisconsin Dinner Meeting, April 20. Foley, C.M., and Schaad, J. Two-Way Steel Floor System Using Open-Web Joists, Steel Joist Institute Research Committee, Milwaukee, WI, August 30, 2005. Foley, C.M., Peronto, J.L., Ginal, S.J., Fatigue Life Prediction of Full-Span Sign and High-Mast Luminaire Support Structures, 84th TRB Annual Meeting Session 724, National Academies, Washington, D.C., January 12. Foley, C.M., Fatigue-Life Prediction of Full-Span Overhead Sign and High-Mast Luminaire Support Structures, Civil & Environmental Engineering Seminar, University of Wisconsin at Madison, November 4. Corliss, G., Foley, C.M., Kearfott, R.B., Formulation for Reliable Analysis of Structural Frames, Computing and Software, McMaster University, Hamilton, ONT, December 6. Foley, C.M., Alimoradi, A. and Pezeshk, S., Probabilistic Performance-Based Design Using GA-Based Nonlinear Response Optimization, 13th World Conference on Earthquake Engineering, Vancouver, B.C. Poster Presentation. Pezeshk, S., C.M. Foley, and A. Alimoradi. Optimized Performance-Based Seismic Design of Hybrid Structural Steel Systems Using Genetic Algorithms, Seventh U.S. National Conference on Earthquake Engineering (7NCEE), Boston, Massachusetts, July 21-25, Poster Presentation.

2004

2004 2004

2003

2003 Brower, W.E. and Foley, C.M. The Hoan Bridge An Interdisciplinary Dialogue on Steel Bridge Design and Materials Selection, Department of Mechanical and Industrial Engineering Seminar Series, Marquette University, April 24. 2002 Foley, C.M. and Brower, W. The Hoan Bridge An Interdisciplinary Dialogue on Steel Bridge Design and Materials Selection, ASM International Milwaukee Chapter, November Meeting, November 12. 2002 Foley, C.M. Evolutionary Computation in Civil/Structural Engineering: A Look Forward and a Look Backward, Special 2-Hour Short Course, Johns Hopkins University, Department of Civil & Environmental Engineering, September 26. 2002 Foley, C.M. and Ginal, S.J. Fatigue Performance of Highway Sign Bridges and High-Mast Luminaire Supports, ASCE Wisconsin Section, 2002 Spring Technical Conference, Olympia Resort, Oconomowoc, WI. Research Reports 2006 Foley, C.M. Martin, K., Schneeman, C. Robustness in Structural Steel Framing Systems, Draft Research Report, American Institute of Steel Construction, Chicago, IL, 266 pages. 2004 Foley, C.M., Ginal, S.J., Peronto, J.L., Fournelle, R.A. (2003) Structural Analysis of Sign Bridge Structures and Luminaire Supports, Project 0092-00-0016, Wisconsin Department of Transportation, (final report available at www.eng.mu.edu/foleyc and www.whrp.org). Foley, C.M., Schinler, D., Voss, M.S. Optimized Design of Fully and Partially Restrained Steel Frames Using Advanced Analysis and Object-Oriented Evolutionary Computation, Technical Report Submitted to the National Science Foundation, Award Number CMS-9813216, December, 189 pages (www.eng.mu.edu/foleyc). Foley, C.M. and Buckhouse, E., Strengthening Existing Reinforced Concrete Beams for Flexure Using Bolted External Structural Steel Channels, Research Report No: MUST-98-1, Department of Civil & Environmental Engineering, Marquette University, January. Report submitted to Rawl Plug Company, New Rochelle, NY and the Wisconsin Society of Steel Fabricators, 77 pages.

2002

1998

Wan and Foley: 20 of 20

You might also like