STUDY & EVALUATION SCHEME B. Tech. Mechanical Engineering and Industrial & Production Engineering (Effective from the session 2006-07) SEMESTER-V
SUBJECT L THEORY 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. THU-501 TME-502 TME-503 TME-504 TME-505 TME-552 TME 553 TME 554 TME 555 GP 501 Industrial Economics & Principles of Management Machine Design-I Dynamics of Machine Manufacturing Science-II Heat & Mass Transfer Machine Design-I Lab Dynamics of Machine Lab Manufacturing Science-II Lab Heat & Mass Transfer Lab General Proficiency Total 3 3 3 3 3 0 0 0 0 15 1 1 1 1 1 0 0 0 0 5 0 0 0 0 0 2 2 3 3 10 30 30 30 30 30 10 10 10 10 20 20 20 20 20 10 10 10 10 50 50 50 50 50 20 20 20 20 50 100 100 100 100 100 30 30 30 30 150 150 150 150 150 50 50 50 50 50 1000 PERIODS T P Evaluation Scheme SESSIONAL EXAM. CT TA Total ESE

YEAR III
S. No.

Course Code

Subject Total

PRACTICAL/TRAINING/PROJECT

YEAR III
S. No. Course Code THEORY 1. 2. 3. 4. 5. TME-601 TME-602 TME-603 TME-604 TME-606 Operations Research * I. C. Engines Machine Design-II Fluid Machinery 3 3 3 3 1 1 1 1 1 0 0 0 0 0 30 30 30 30 30 20 20 20 20 20 50 50 50 50 50 SUBJECT L PERIODS T P

SEMESTER-VI
Evaluation Scheme SESSIONAL EXAM. CT TA Total ESE 100 100 100 100 100

Subject Total

150 150 150 150 150

*Refrigeration & 3 Air-conditioning PRACTICAL/TRAINING/PROJECT Machine Design-II Lab Fluid Machinery Lab *Refrigeration & Air-conditioning Lab Seminar General Proficiency Total 0 0 0 0 15

6. 7. 8. 9. 10.

TME-653 TME-654 TME-656 TME-657 GP-601

0 0 0 0 5

2 3 2 3 10

10 10 10 -

10 10 10 50 -

20 20 20 50 50 -

30 30 30 -

50 50 50 50 50 1000

Note-1. 4 to 6 Weeks Practical Summer Training-2 after VI semester, to be evaluated in VII semester 2. For Industrial & Production Engineering : I.C.Engine is replaced with TPI-601 Production Planning & Control, Refrigeration & Air-conditioning is replaced by TPI-603 Principles of Machine Tool Design and the Lab is replaced by TPI-653 Machine Tool Design Lab.

U.P. TECHNICAL UNIVERSITY, LUCKNOW


STUDY & EVALUATION SCHEME B. Tech. Mechanical Engineering and Industrial & Production Engineering (Effective from the session 2007-08) SEMESTER-VII
SUBJECT L THEORY 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. TME-751 TME 753 TME 754 TME 755 GP 701 TME-701 TME-702 TME-703 Computer Aided Design (CAD) Computer Aided Manufacturing (CAM) Automobile Engineering Open Elective-I Elective-I CAD/CAM Lab Automobile Engg Lab Industrial/Practical Training (1&2) Report Presentation Project* General Proficiency Total 3 3 3 3 3 0 0 0 0 15 1 1 1 1 1 0 0 0 0 5 0 0 0 0 0 2 2 3 3 10 30 30 30 30 30 10 10 20 20 20 20 20 10 10 50 50 50 50 50 50 50 20 20 50 50 50 100 100 100 100 100 30 30 150 150 150 150 150 50 50 50 50 50 1000 PERIODS T P Evaluation Scheme SESSIONAL EXAM. CT TA Total ESE

YEAR IV
S. No.

Course Code

Subject Total

PRACTICAL/TRAINING/PROJECT

Note: (1) Practical Training-1 / In house training & Industrial tour/ mini project to be done in summer after 4th semester and the practical training-2 to be done in summer after 6th semester, Evaluation however to be made in 7th semester through report & viva etc. (2) * Project should be initiated in 7th semester beginning.

YEAR IV
S. No. Course Code THEORY 1. 2. 3. 4. 5. 6. 7. TME-856 GP-801 TME-801 TME-802 TME-803 Power Plant Engineering* Mechanical System Design Project Management Elective-II Elective-III Project** General Proficiency Total 3 3 3 3 3 0 15 1 1 1 1 1 0 5 0 0 0 0 0 12 12 30 30 30 30 30 20 20 20 20 20 50 50 50 50 50 50 50 50 SUBJECT L PERIODS T P

SEMESTER-VIII
Evaluation Scheme SESSIONAL EXAM. CT TA Total ESE 100 100 100 100 100 150 -

Subject Total

150 150 150 150 150 200 50 1000

PRACTICAL/TRAINING/PROJECT

1. * For Industrial & Production Engineering Power Plant Engg. is replaced with TPI801 Quality Control. 2. ** Project should be completed by the end of 8th semester with good report and presentation 3. Out of 12 project-periods 3 period per week should be allotted for a group and 9 periods per weeks should be allotted for the self study, lab and project work.