You are on page 1of 5

To

Date: 25-08-2011

Mr. A. NATARAJAN
Plot No.40/25, G.R.Narayana Palayam Street, Kanchipuram.

ESTIMATE This has reference to the discussion we had with you regarding the proposed new building construction work(855sq.ft.) with alteration at Kanchipuram.

We have pleasure to offer our lowest competitive rate for Civil work as per item basic rate as follows: Sl.No. 1. 2. 3. Particulars Earth work excavation for all kinds of soil Supplying and filling with river sand for the foundation and basement Providing and laying concrete with 40 mm and down size graded stone aggregate as base or sub-base for foundation, concrete floor etc. PCC. Providing and laying brick masonry work well burnt 2st class good quality. Approved bricks in 1:6 cement mortar in true line level and plumb for wall foundations a) 9 thick brick work b) 4 thick brick work Providing and laying reinforced cement concrete with 1:2:4 (1 cement 2 coarse sand 4 graded stone aggregate by volume)m 15 grade rates to include from work. In foundations, pedestals, footings, plinth beam, column roof slab and roof beams, waist slabs(RCC) Supplying and fabricating Steel for all RCC works Centering charges for all RCC works Quantity in Cum. 26.7 64.2 Rate 150.00 300.00 Amount 4,005.00 19,260.00

16 2950.00

47,200.00

4.

2300sq.ft 460sq.ft

100.00 60.00

2,30,000.00 27,600.00

5.

24 4100.00 36.23 Qtl 4500.00 73.16sqm 550

98,400.00 1,63,035.00 40,238

6. 7.

Sl.No. 8.

Particulars

Quantity in Cum.

Rate

Amount

Plastering work. Plastering to be prepared with cement mortars only with specified composition of cement and sand a) Ceiling CM 1:3 Internal wall, external wall CM 1:4 9. Wood work: Main Door : Ist Class Teak Wood.(5*4 size) All timber members to be well selected seasoned 1st class Padak wood 2 x 4 door frames & window frames,. with 1 x 3 window setters cum glass 4 mm thick & grills including fixing to supports to withhold fasts, cleats and threaded expansion bolts as called for providing and fixing well seasoned chemical termite 30 mm thick readymade door, bed room, kitchen, toilet and rooms, main door frames 5 x 3. Door. All doors with necessary hardwares. Plotter wood junctions etc., IC making rebates for locks hinges and all accessories. 10. Tiles and Marbles a) Tile laying cost Rs.40/-sq.ft(511sq.ft) b) Marble laying cost Rs.100/-sq.ft.(1017sq.ft.) 11. Water proofing: Providing and laying lime concrete using brick jelly ISS 25mm in pure slaked lime (32 part brick jelly : 12.5 part of lime) for required thickness and slope on roof wall beaten with wooden beaters using lime water, kadukkai, jaggery as per MDSS and laying one course of pressed tiles set in CM 1:3 mix mixed with crude oil 5% by weight of cement and painted with some oiled mortar including necessary flashing all around at junctions at trace floor. 12. Plumbing work: Supplying and fixing with a clearance of 100 mm dia, 7 mm dia, 50 mm dia, 32 mm dia, 25mm and 20mm dia all pipes brand STAR

402

180.00

72,360.00

LS

75,000.00

1,22,140.00

900sq.ft.

100.00

90,000.00

Sl.No.

Particulars

Quantity in Cum.

Rate

Amount

approved quality as per specifications as directed. Shall be Indian make, China, Orisa Pan type white Indian water closet 580 mm long 100 mm dia proclaim trap of P or S. Effective water seal. 15 mm dia CP shower with Hot and Cold wall mixer, concealed CP brass control valves, with shower hose of heavy type of metro or water man approved specification fixing 100 mm dia heavy quality Nahni trap with 75 mm dia outlet. Embedding the trap in cement concrete using 1:3:6 mix 20 mm BG metal forming flow sump upto floor level over the trap. Conveying the materials, finishing 125 mm dia cp grating etc., complete. All tap and valves ISI make specifications. All toilet providing and fixing (White colour) wash basin, one toilet fixing European type vitreous china wash down water closet of approved make with P or S trap with fittings either Hindustan make (White colour) heavy solid black plastic seat cover with rubber buffer. Flap cover with flushing cisterm. 13. Electrical work: Providing wiring with 1/18, 3/20. 7/20 copper conductor, PVC insulated finolex brand wires in 1.5 mm thick 25mm pipe with all accessories to be laid in concealed manner slabs, beams, walls with providing light, fan points, 15 ams, SS components 5 ams plug point, bell push switches, including provision of shock proof accessories on suitable teak wood boxes hylam laminated sheet top either ends with earthling in all switches, plug points, TV telephone sockets, all accessories and switches Anchor Brand (Main board) required suitable teak wood framed board with 32 ams main switch, DB box, MCB and earthling with GI earth pipe 4.5 meter long 40 mm dia including copper earth plate, electrode, slot/coke or charcoal as

LS.

1,20,000.00

Sl.No.

Particulars

Quantity in Cum. LS

Rate

Amount

7,695.00 10,000.00 Total 15,11,933.00 (Rupees Fifteen lakhs Eleven thousand Nine Hundred and Thirty Three only) for SREE-CONSTRUCTIONS

required. Over head main board to EB pole 1/16 aluminium wiring. 14. Painting: Prepare surfaces by cleaning scrubbing smoothening and applying 2 coats of cement painting approved make and shade over one coat of primer with necessary putty to all walls in internal and 2 coats of distemper cleaning and applying 1 coat of primer 2 coats of synthetic enamel paint to door, windows and grill etc. 15. Anti termite soil treatment as per LS code (Part1) 1971 for foundation trenches sides and bottom 16. M.S. Grill gate 2 nos

2,25,000.00

LS

1,60,000.00

855sq.ft. LS

9.00

(V.K.SRIJITH)

TERMS AND CONDITIONS OF CONTRACT 1 2 3 4 Water and power for our construction purpose are to be supplied free of charge at site at appropriate locations. Completion period 6 to 7 months from the date of handing over the site. Our prices is inclusive of all materials required construction machineries and tools manpower and supervision. a) Initial payment should be made 25% of the total value of the work as an advance and this amount will be deducted in the subsequent bill as pro-rata basis. b) 20% will be paid on basement level. c) 20% will be paid before ground-floor roofing. d) 20% will be paid before brickwork. e) 13% will be paid before inside and outside plastering. f) 2% will be paid after completion of painting work 5 In case of delay in completion due to reasons beyond the control of the owner like floods, non-availability of building materials, etc., suitable extension of time will be granted. Thanking you, Yours faithfully, for SREE-CONSTRUCTIONS

(V.K.SRIJITH)