Hong Kong International Airport (HKIA) is located less than five flying hours from half of the world's

population. We are the fifth busiest international passenger airport and operate the busiest international cargo facilities in the world. In 2008, more than 48.6 million passengers used the airport, and over 3.6 million tonnes of air cargo passed through Hong Kong. With some 800 aircraft movements every day and around 85 airlines operating from HKIA, HKIA links Hong Kong with more than 150 destinations round the world, including some 40 cities on the Chinese Mainland.

Since we commenced operations in July 1998, we have made every effort to provide passengers with customer-focused facilities and services. This commitment has earned us the world's best airport recognitions. The latest survey by the independent air transport research organisation, Skytrax, ranked HKIA as No.1 the seventh time in eight years. It was also named best airport by many other entities. These awards give us impetus to deliver even better airport experience. With the opening of Terminal 2 in June 2007, HKIA is now a two-terminal and two-runway facility contributing to the economic growth for Hong Kong and the Pearl River Delta (PRD) region. Today, the 60,000-strong airport community serves as the key contributor to Hong Kong's position as a leading regional and international aviation hub. Multi-modal Mainland connections HKIA is a gateway hub of China. To serve growing demand, we will continue to strengthen our integrated, multi-modal transport network with the Mainland, especially the PRD. Some 320 coach trips a day link HKIA with 90 PRD cities and towns. Passengers looking for pointto-point transport services can use the cross-boundary limousine to get to your PRD destinations directly.

The SkyPier cross-boundary ferry service connects passengers between the PRD and international destinations via HKIA, in comfort and without going through immigration and customs formalities in Hong Kong. Six PRD ports Shenzhen Shekou and Fuyong, Dongguan, Zhongshan, Zhuhai and Macau currently offer these speedy cross-boundary arrangements. Passengers can even pre-check their baggage and obtain their boarding pass at Fuyong, Shekou, Macau and Dongguan Humen. A new permanent SkyPier facility is under construction. Building a better airport

A HK$50 billion investment, HKIA has been one of the largest engineering and architectural projects in the world . During the last decade we invested an average of more than HK$2 billion a year to expand capacity and enhance airport facilities. Newly completed facilities included Terminal 2, 10 new cargo stands, HKIA Tower and the Airport World Trade Centre. Everything we do is focused on strengthening Hong Kongs long-term competitiveness. In this regard, we have recently undertaken a HK$4.5 billion programme for Terminal 1 capacity enhancement and airfield improvements such as the building of North Satellite Concourse, the reconfiguration of the Departures Immigration Hall, the addition of new taxiways and resurfacing of the two runways. To expand aviation support services and air cargo handling facilities, the franchise for a new air cargo terminal was awarded in early 2008 and within a few years, additional hangars for aircraft maintenance and business jets will come into service. Developments are also underway to serve the growing stream of multi-modal traffic to and from the Chinese Mainland. They include expansion of cross-boundary ferry and coach services and the building of a permanent SkyPier ferry terminal, which is scheduled to open in 2009. Planning for the future, HKIA has been looking at the potential development of the Midfield for more bridge-served parking stands and terminal facilities. We will also commence the engineering and environmental studies on the feasibility of a third runway at the airport. Kai Tak Airport 1925-1998 The Name

Kai Tak is named after two businessmen, Sir Ho Kai and Mr. Au Tak, who were involved in a company formed to reclaim land in Kowloon Bay for a residential housing scheme. The Company, unfortunately, failed and the reclaimed land was left vacant. The suitability of using this land as an airfield was recognized and the first recorded flight from Kai Tak took place on Lunar New Year's Day in 1925. The History The aviation began on this unique piece of land with a flying school and a British military flying unit. In 1928, a concrete slipway was built for seaplanes using Kowloon Bay. In 1930, the first aerodrome superintendent was appointed with the aviation activities at Kai Tak coming under the administration of the Harbour Department. In 1935, the first control tower and a hangar were built. The first commercial passengers flight 'Dorado' landed on 24 March 1936 from Penang operated by the Imperial Airways. With this arrival a new era began for Kai Tak as an airport for public transportation. In the following years, Pan American World Airways began its Clipper flying boat service between Hong Kong and San Francisco. Other air services followed with Air France flights from Indochina, China National Aviation Corporation from Guangzhou and Shanghai and Eurasia Aviation Corporation operating between Hong Kong and Beijing.

A letter delivered by the 'Dorado' with datestamp showing 24 March 1936 on its back.

The first Scheduled air service arrived at Kai Tak on 24 March, 1936 The World War II (1941-1945)

During the Second World War a second runway was built by the Japanese during their occupation. However the Airport was severely damaged by bombing. After the war, a local airline, the Cathay Pacific Airways began operations with DC3 aircraft. The Civil Aviation Department was established on 1 May 1946 charged with the responsibility of administering the air services activities of the territory.

Kai Tak Airport in 1947 The Airport Development In 1954, the Government approved a master plan for airport development. In 1958, a new northwest/southeast heading 2529 meter runway was constructed on a promontory into Kowloon Bay. The name Hong Kong International Airport was officially adopted for Kai Tak Airport. In 1962, a passenger terminal building was built. Turboprop aircraft were being replaced by jets such as the Boeing 707, DC8 and de Havilland comet. The first Boeing B747 arrived on 11 April 1970. In those days to use runway 13 pilots were required to have the runway in slight when the aircraft was near Cheung Chau Island. In 1974, the visual approach was replaced by the Instrument Guidance System (IGS). With the aid of the IGS the runway could become visual to pilots when they were over the Kowloon Peninsula. This significantly increased the utilization of runway 13 under adverse weather conditions particularly during long periods of easterly prevailing winds. In 1975, the runway was extended to 3,390 meters to meet the long haul operating requirements of the 31 airlines that operated into Hong Kong. In 1976, the Hong Kong Air Cargo Terminal was opened. In the same year, Air Traffic Management was enhanced by the introduction of Secondary Surveillance Radar.

The construction of the Southeast/Northwest heading runway in 1956

Viewing platform of the terminal building and Aircraft parking upon in 1962

The old Kai Tak Terminal Building was demolished in 1965. The new Terminal Building in the background The Expansion Projects Upon the completion of Stage 4 development of the passenger terminal building in 1981, a study of the capacity of various facilities in the passenger terminal building revealed the need for the further expansion of the terminal to cope with air traffic forecast in the early 90s. The Stage 5 development of the terminal was commenced in 1984 and completed in 1988, increasing the design capacity to 18 million passengers per annum by adding terminal parking facilities, check - in counters and baggage reclaim units.

In 1987, to cater for the strong increase in air traffic at Kai Tak during its remaining life before the availability of the replacement airport, another series of expansion and improvement projects initiated. In 1991, Terminal 2 of the Hong Kong Air Cargo Terminal was commissioned providing an annual air cargo handling capacity of 1.5 million tonnes per annum. In 1992, the expansion of the East Apron which provided 4 additional parking bays for B747 - 400 aircraft and a general aviation aircraft parking area were completed. Finally, in 1994 an expansion of the South Apron Provided 11 more parking bays for B747 aircraft. The design capacity of the airport reached 24 million passengers per annum.

Air Traffic Controller working on the radar equipment in 1985

The airport immigration control before its computerisation in 1988 Kai Tak Airport In 1996, the Kai Tak Airport reached an important milestone when it handled 29.5 million international passengers and 1.56 million tonnes of international cargo making it the third busiest Airport in the world for international passengers and first in the world for international cargo throughput in the world.

High-tech Air Traffic Control equipment in 1998 Civil Aviation Department and the New Airport The Airport Authority Hong Kong is charged with the responsibility to develop and manage the new airport at Chek Lap Kok. The Civil Aviation Department will continue to provide air traffic control services and will take up a regulatory role in respect of airport management side. Through an aerodrome licensing system the Department will ensure that the new Airport is operated in compliance with the international safety and security standards as required by the Hong Kong Special Administrative Region Government. The Civil Aviation Department will ensure that our mission is achieved. Committed to provide a safe and efficient air transport system.